Filter interviews by
I am a seasoned facility manager with over 10 years of experience in overseeing building operations and maintenance.
Over 10 years of experience in facility management
Skilled in overseeing building operations and maintenance
Strong background in managing facility budgets and projects
I left my previous company to pursue new opportunities and challenges.
Seeking career growth and advancement
Desire for new challenges and experiences
Better work-life balance
Company restructuring or downsizing
Relocation to a new area
Conflict with management or colleagues
OHM's Law states the relationship between voltage, current, and resistance in an electrical circuit.
OHM's Law formula: V = I * R (Voltage = Current * Resistance)
V = voltage (measured in volts)
I = current (measured in amperes)
R = resistance (measured in ohms)
Example: If a circuit has a voltage of 12V and a resistance of 4 ohms, the current flowing through the circuit would be 3A (I = V / R = 12V / 4 ohms = 3A)
AC stands for alternating current, which changes direction periodically. DC stands for direct current, which flows in one direction.
AC is commonly used in household appliances and power distribution systems.
DC is commonly used in batteries and electronic devices.
AC can be easily converted to different voltages using transformers.
DC is more efficient for long-distance power transmission.
Examples of AC devices include re...
Types of circuit breakers include thermal-magnetic, magnetic, and hydraulic-magnetic.
Thermal-magnetic circuit breakers combine thermal and magnetic mechanisms to provide overload and short circuit protection.
Magnetic circuit breakers use a solenoid to trip the breaker when a fault is detected.
Hydraulic-magnetic circuit breakers use a hydraulic delay to provide precise protection against overloads and short circuits.
I was interviewed in Jan 2024.
Yes, I have prepared CAPA (Corrective and Preventive Action) reports in my previous roles.
Yes, I have prepared CAPA reports to address quality issues and prevent their recurrence.
I have experience in conducting root cause analysis to identify the underlying issues.
I have implemented corrective actions to address immediate concerns and preventive actions to avoid future issues.
I have also monitored the effectiveness of
APQP stands for Advanced Product Quality Planning. It is a structured method for defining and establishing the steps necessary to ensure that a product satisfies the customer.
APQP is a quality framework used in the automotive industry to ensure that products meet customer requirements.
It involves a series of phases including planning, product design and development, process design and development, product and process v...
7QC Tools are a set of tools used for quality control and improvement in manufacturing processes.
Check Sheet: Used to collect and analyze data, such as defects in a product.
Histogram: Shows the frequency distribution of a set of data.
Pareto Chart: Helps identify the most significant factors contributing to a problem.
Cause and Effect Diagram (Fishbone Diagram): Used to identify and analyze potential causes of a problem.
...
PPAP documents include documents like control plan, FMEA, measurement system analysis, etc.
Control Plan
FMEA (Failure Mode and Effects Analysis)
Measurement System Analysis
Part Submission Warrant
Process Flow Diagram
Appearance Approval Report
Acceptance criteria for SPC&MSA involves setting specific requirements for statistical process control and measurement system analysis.
Acceptance criteria for SPC should include specifications for control limits, process stability, and capability indices.
Acceptance criteria for MSA should include requirements for bias, linearity, stability, repeatability, and reproducibility.
Examples of acceptance criteria for SPC coul...
Severity in PFMEA is declared based on the potential impact of a failure mode on the overall process or product.
Severity is typically rated on a scale from 1 to 10, with 1 being the least severe and 10 being the most severe.
Consider the consequences of a failure mode on customer safety, regulatory compliance, product functionality, and overall process performance.
Examples of high severity failure modes include those th...
On recent topic like the Indian election
It was CRM development assignment and it was mern stack application
I applied via Campus Placement and was interviewed in Jun 2022. There were 2 interview rounds.
Good question for aptitude test
Veer-O-- Metals interview questions for popular designations
I applied via Naukri.com and was interviewed before Mar 2023. There was 1 interview round.
I applied via Referral and was interviewed in Aug 2021. There were 4 interview rounds.
SAP is an enterprise resource planning software that integrates various business functions and processes.
SAP stands for Systems, Applications, and Products in Data Processing.
It is used by organizations to manage their business operations and streamline processes.
SAP provides modules for different areas such as finance, sales, procurement, production, etc.
It allows data sharing and communication between different depar...
Capacity assessment refers to the process of evaluating an organization's ability to meet its goals and objectives.
Assessing an organization's resources, including personnel, equipment, and finances
Determining the organization's current and future needs
Identifying potential bottlenecks or areas for improvement
Developing strategies to optimize the organization's capacity
Examples include assessing a factory's production ...
A progressive tool is a type of metal stamping die that can perform multiple operations in a single press stroke.
Progressive tools are used in metal stamping to create complex parts quickly and efficiently.
They consist of multiple stations, each with a different tool or die that performs a specific operation.
As the metal strip moves through the press, each station performs its operation, resulting in a finished part at...
Key Performance Indicators (KPIs) in production control measure the efficiency and effectiveness of production processes.
Production output: Measure the quantity of products produced within a specific time frame.
Production cycle time: Measure the time taken to complete a production cycle.
Quality control: Measure the number of defects or errors in the production process.
Production cost: Measure the cost of production, in...
OEE stands for Overall Equipment Effectiveness. It is a measure of how well a manufacturing process is performing.
OEE is calculated by multiplying Availability, Performance, and Quality.
OEE target is the ideal OEE that a manufacturing process should achieve.
Actual OEE is the OEE that a manufacturing process is currently achieving.
OEE can be used to identify areas for improvement in a manufacturing process.
For example, ...
I applied via Recruitment Consultant and was interviewed in Mar 2021. There were 3 interview rounds.
I applied via Referral and was interviewed in Mar 2021. There was 1 interview round.
Top trending discussions
Interview experience
based on 211 reviews
Rating in categories
Quality Engineer
64
salaries
| ₹1.8 L/yr - ₹5.5 L/yr |
Junior Engineer
32
salaries
| ₹1.5 L/yr - ₹4.7 L/yr |
NPD Engineer
28
salaries
| ₹2 L/yr - ₹5.7 L/yr |
Production Engineer
25
salaries
| ₹3.5 L/yr - ₹7 L/yr |
Senior Engineer
24
salaries
| ₹5 L/yr - ₹10 L/yr |
Tata Steel
JSW Steel
Hindalco Industries
Vedanta Limited