Filter interviews by
Capacity assessment refers to the process of evaluating an organization's ability to meet its goals and objectives.
Assessing an organization's resources, including personnel, equipment, and finances
Determining the organization's current and future needs
Identifying potential bottlenecks or areas for improvement
Developing strategies to optimize the organization's capacity
Examples include assessing a factory's production ...
A progressive tool is a type of metal stamping die that can perform multiple operations in a single press stroke.
Progressive tools are used in metal stamping to create complex parts quickly and efficiently.
They consist of multiple stations, each with a different tool or die that performs a specific operation.
As the metal strip moves through the press, each station performs its operation, resulting in a finished part at...
Key Performance Indicators (KPIs) in production control measure the efficiency and effectiveness of production processes.
Production output: Measure the quantity of products produced within a specific time frame.
Production cycle time: Measure the time taken to complete a production cycle.
Quality control: Measure the number of defects or errors in the production process.
Production cost: Measure the cost of production, in...
OEE stands for Overall Equipment Effectiveness. It is a measure of how well a manufacturing process is performing.
OEE is calculated by multiplying Availability, Performance, and Quality.
OEE target is the ideal OEE that a manufacturing process should achieve.
Actual OEE is the OEE that a manufacturing process is currently achieving.
OEE can be used to identify areas for improvement in a manufacturing process.
For example, ...
Top trending discussions
I applied via Naukri.com and was interviewed before Sep 2020. There were 3 interview rounds.
Unnatural vibrations in equipments can be reduced by proper maintenance and installation.
Ensure proper alignment of equipment parts
Use vibration dampeners or absorbers
Regularly inspect and replace worn out parts
Install equipment on a stable foundation
Reduce equipment speed or load if possible
I applied via Tata steel and was interviewed before Sep 2021. There were 2 interview rounds.
Standard 10th level questions.
I applied via Walk-in and was interviewed before Aug 2021. There was 1 interview round.
I applied via Company Website and was interviewed in Jan 2021. There was 1 interview round.
I was interviewed before Jan 2021.
Diploma
I applied via AmbitionBox and was interviewed before Dec 2021. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed in Nov 2019. There were 3 interview rounds.
Mining is the process of extracting valuable minerals or other geological materials from the earth's surface or underground.
Mining is done to obtain various resources such as coal, gold, diamonds, and metals like iron, copper, and aluminum.
It involves the removal of soil, rocks, and other materials to access the desired minerals.
Mining can be categorized into surface mining and underground mining, depending on the loca...
Quality Engineer
68
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
35
salaries
| ₹0 L/yr - ₹0 L/yr |
NPD Engineer
28
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
25
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
24
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Steel
JSW Steel
Hindalco Industries
Vedanta Limited