Capacity assessment refers to the process of evaluating an organization's ability to meet its goals and objectives.
Assessing an organization's resources, including personnel, equipment, and finances
Determining the organization's current and future needs
Identifying potential bottlenecks or areas for improvement
Developing strategies to optimize the organization's capacity
Examples include assessing a factory's production ...
A progressive tool is a type of metal stamping die that can perform multiple operations in a single press stroke.
Progressive tools are used in metal stamping to create complex parts quickly and efficiently.
They consist of multiple stations, each with a different tool or die that performs a specific operation.
As the metal strip moves through the press, each station performs its operation, resulting in a finished part at...
Key Performance Indicators (KPIs) in production control measure the efficiency and effectiveness of production processes.
Production output: Measure the quantity of products produced within a specific time frame.
Production cycle time: Measure the time taken to complete a production cycle.
Quality control: Measure the number of defects or errors in the production process.
Production cost: Measure the cost of production, in...
OEE stands for Overall Equipment Effectiveness. It is a measure of how well a manufacturing process is performing.
OEE is calculated by multiplying Availability, Performance, and Quality.
OEE target is the ideal OEE that a manufacturing process should achieve.
Actual OEE is the OEE that a manufacturing process is currently achieving.
OEE can be used to identify areas for improvement in a manufacturing process.
For example, ...
posted on 26 Aug 2024
posted on 23 May 2024
The source name of the laser cutting machine is typically the manufacturer's name or a specific model name.
The source name could be the manufacturer's name, such as Trumpf or Amada.
It could also be a specific model name, like Trumpf TruLaser Series or Amada LC3015.
posted on 10 Apr 2024
posted on 3 Feb 2024
I applied via Campus Placement and was interviewed in Aug 2023. There was 1 interview round.
posted on 3 Feb 2023
I applied via campus placement at Rural Polytechnic, Haunsbhavi and was interviewed in Aug 2022. There were 4 interview rounds.
Some general knowledge questions
Cutting tools are made of various materials depending on the application.
High-speed steel (HSS) is commonly used for general-purpose cutting tools.
Carbide is used for cutting hard materials like steel and titanium.
Ceramics are used for high-speed cutting of cast iron and other hard materials.
Diamond is used for cutting non-ferrous materials like glass and ceramics.
Cobalt steel is used for cutting stainless steel and ot
1mm is equal to 1000 microns.
1mm = 1000 microns
Micron is a unit of measurement for length equal to one millionth of a meter
Microns are commonly used in manufacturing and engineering applications
To attend this job is an opportunity to apply my skills and knowledge in production engineering and contribute to the success of the company.
Opportunity to utilize my technical skills and expertise in production engineering
Chance to contribute to the success and growth of the company
Ability to work on challenging projects and solve complex problems
Opportunity for professional development and career advancement
Collabora...
I come from a supportive family background and chose not to pursue higher education for practical reasons.
My family has always been supportive of my decisions and encouraged me to pursue my interests.
I decided not to go for higher education because I wanted to gain practical experience in the field of production engineering.
I believed that hands-on experience and learning on the job would be more valuable for my career...
posted on 16 Sep 2022
I applied via Company Website and was interviewed in Aug 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Oct 2021. There were 2 interview rounds.
Quality Engineer
64
salaries
| ₹1.8 L/yr - ₹5.5 L/yr |
Junior Engineer
32
salaries
| ₹1.5 L/yr - ₹4.7 L/yr |
NPD Engineer
28
salaries
| ₹2 L/yr - ₹5.7 L/yr |
Production Engineer
25
salaries
| ₹3.5 L/yr - ₹7 L/yr |
Senior Engineer
24
salaries
| ₹5 L/yr - ₹10 L/yr |
Tata Steel
JSW Steel
Hindalco Industries
Vedanta Limited