L&T Construction fresher Interview Questions and Answers

Updated 19 Nov 2024

L&T Construction fresher Interview Experiences

1 interview found

fresher Interview Questions & Answers

user image Anonymous

posted on 19 Nov 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via campus placement at SMVM Polytechnic, Tanuku and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. I don't how to prepare for that
  • Q2. Please help me to select for the L&T company

Interview questions from similar companies

I applied via Company Website and was interviewed before Oct 2021. There were 2 interview rounds.

Round 1 - Technical 

(4 Questions)

  • Q1. Interview se selection
  • Q2. Introduction and branch se qustion
  • Q3. LNT me selection huva in
  • Q4. Introduction and resume se selection
Round 2 - Aptitude Test 

Branch questions mechanical engineering production

Interview Preparation Tips

Topics to prepare for Larsen & Toubro Limited fresher interview:
  • Mechanical Engineering
Interview preparation tips for other job seekers - Iam anchal chauahan diploma in mechanical engineering production

I applied via Campus Placement and was interviewed in Aug 2019. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Does fresher are allowed these periods??

Interview Preparation Tips

Interview preparation tips for other job seekers - I received major interview questions is about on SE. HR said to draw the T&C section and to mark the parts. Second question is about effective length formula. Third question is about density of steel...
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via campus placement at Birla Institute of Technology and Science (BITS), Pilani and was interviewed in Jul 2024. There were 3 interview rounds.

Round 1 - Group Discussion 

Social media connecting people

Round 2 - Technical 

(2 Questions)

  • Q1. Timoshenko beam theory
  • Q2. Sfd and bmd diagram
  • Ans. 

    Sfd and bmd diagrams show the variation of shear force and bending moment along the length of a structural member.

    • SFD (Shear Force Diagram) shows the variation of shear force along the length of a beam or structural member.

    • BMD (Bending Moment Diagram) shows the variation of bending moment along the length of a beam or structural member.

    • SFD and BMD are essential for analyzing the internal forces and moments in a structu...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Introduce yourself
  • Ans. 

    I am a structural engineer with 5 years of experience in designing and analyzing buildings and bridges.

    • Graduated with a degree in Civil Engineering

    • Worked on various projects including high-rise buildings and pedestrian bridges

    • Proficient in software such as AutoCAD and SAP2000

  • Answered by AI
  • Q2. Preference of job location
  • Ans. 

    I am open to job locations that offer opportunities for growth and development.

    • I am willing to relocate for the right job opportunity

    • I prefer job locations with good transportation options

    • I am open to both urban and rural locations depending on the job requirements

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well both technical and communication skills
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the IS code of pile.
  • Ans. 

    IS 2911 is the Indian Standard code for design and construction of pile foundations.

    • IS 2911 is the code for design and construction of pile foundations in India.

    • It covers various types of piles including driven piles, bored cast-in-situ piles, etc.

    • The code provides guidelines for the design, materials, construction, and testing of piles.

    • It ensures the safety and stability of structures supported by piles.

    • Example: IS 29...

  • Answered by AI
  • Q2. What is the density of bentonite during piling.
  • Ans. 

    The density of bentonite during piling is typically around 1.0 to 1.2 g/cm^3.

    • The density of bentonite can vary depending on the specific type and concentration used.

    • Higher density bentonite is often preferred for better support during piling operations.

    • Typical range of density for bentonite during piling is 1.0 to 1.2 g/cm^3.

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Case Study 

About Previous experience and some site questions

Round 3 - Technical 

(1 Question)

  • Q1. Civil and Highway Structure related Question

Interview Preparation Tips

Interview preparation tips for other job seekers - Please be well versed in previous experience
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. What should be the height of Tremie pipe from pile founding level during concrete?
  • Ans. 

    The height of Tremie pipe from pile founding level during concrete should be maintained at a certain level to ensure proper placement of concrete.

    • The Tremie pipe should typically be kept at a height of 1-2 meters above the pile founding level to prevent segregation of concrete.

    • Maintaining the correct height ensures that the concrete flows smoothly through the pipe and fills the pile without any gaps or voids.

    • Adjustment...

  • Answered by AI
  • Q2. Which all codes are used for structure engineering ?
  • Ans. 

    Various codes are used in structural engineering to ensure safety and compliance with regulations.

    • International Building Code (IBC)

    • American Society of Civil Engineers (ASCE) standards

    • American Concrete Institute (ACI) standards

    • American Institute of Steel Construction (AISC) standards

    • Eurocode

    • National Building Code of Canada (NBCC)

  • Answered by AI
  • Q3. What is the role of bearings in Bridges?
  • Ans. 

    Bearings in bridges help distribute loads and allow for movement due to temperature changes and seismic activity.

    • Bearings help distribute the loads from the bridge deck to the substructure, reducing stress on the bridge components.

    • Bearings allow for movement of the bridge deck due to temperature changes, seismic activity, and other factors.

    • Different types of bearings include elastomeric bearings, pot bearings, and slid...

  • Answered by AI
  • Q4. Which formula is used to calculate the elongation of PSC Girder?
  • Ans. 

    The formula used to calculate the elongation of PSC Girder is based on the modulus of elasticity and the change in length.

    • The formula for calculating elongation is: Elongation = (Load x Length) / (Modulus of Elasticity x Area)

    • Modulus of Elasticity is a measure of a material's stiffness and is specific to the material used in the PSC Girder

    • The change in length is the difference between the original length and the length...

  • Answered by AI
  • Q5. What is the Process of Making PSC Girder?
  • Ans. 

    The process of making PSC girder involves preparing the concrete mix, casting the girder in a formwork, curing, and testing for quality.

    • Prepare the concrete mix with a specific ratio of cement, aggregates, and water.

    • Pour the mix into a formwork that is designed to the shape and size of the girder.

    • Place prestressed steel strands or bars in the formwork before pouring the concrete to provide strength.

    • Cure the girder by m...

  • Answered by AI
  • Q6. What is socketing length in Pile?
  • Ans. 

    Socketing length in pile refers to the length of the pile that is embedded into the rock or hard strata to provide additional support and stability.

    • Socketing length is determined based on the strength and stability of the rock or strata at the pile tip.

    • It helps in transferring the load from the pile to the rock or hard strata, increasing the overall capacity of the pile.

    • Socketing length can vary depending on the site c...

  • Answered by AI
Round 3 - HR 

(4 Questions)

  • Q1. Why do you want to leave your previous Job?
  • Q2. Are you ready to relocate ?
  • Q3. How much salary do you expect?
  • Q4. Tell me am Example when you did Team Work.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared for the answer like your Job change decision with strong reason. And before appearing any Interview, Read all the notes , which all you prepared Earlier. And one more thing, read about the topic for which you have applied specially and about the company as well.

I applied via Company Website and was interviewed in Jun 2022. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. Application for a accounts Department

Interview Preparation Tips

Interview preparation tips for other job seekers - it was a wonderful company to work with where you can raise your knowladge with growth orgnization also it provides great working inviroment.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. ISO codes and OEE Improvement
  • Q2. How to ensure the quality of the product
  • Ans. 

    Ensuring product quality involves implementing quality control measures, conducting regular inspections, and continuously improving processes.

    • Implementing quality control measures such as setting standards and conducting tests

    • Conducting regular inspections throughout the production process

    • Continuous improvement of processes based on feedback and data analysis

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Basics of civil engineering

L&T Construction Interview FAQs

How many rounds are there in L&T Construction fresher interview?
L&T Construction interview process usually has 1 rounds. The most common rounds in the L&T Construction interview process are Technical.

Tell us how to improve this page.

L&T Construction fresher Interview Process

based on 2 interviews

Interview experience

5
  
Excellent
View more

L&T Construction fresher Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

-

Skill development

-

Work-life balance

-

Salary

-

Job security

-

Company culture

-

Promotions

-

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
1.1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
711 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Construction Manager
504 salaries
unlock blur

₹5.4 L/yr - ₹18 L/yr

Construction Management
332 salaries
unlock blur

₹8.2 L/yr - ₹35 L/yr

Assistant Engineering Manager
321 salaries
unlock blur

₹6 L/yr - ₹17 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview