Filter interviews by
The column vertical bar is placed inside the floor beam bar.
Column vertical bar is positioned inside the floor beam bar for structural support.
This configuration is commonly used in construction to enhance the strength and stability of the building.
Example: Reinforcing steel bars are placed inside the concrete floor beam to provide additional support.
I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.
posted on 10 Sep 2017
I appeared for an interview before Sep 2016.
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 11 May 2018
I appeared for an interview before Mar 2020.
posted on 12 May 2018
posted on 10 May 2022
I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.
Piping code and welder qualifications test
Piping code refers to the set of standards and regulations that govern the design, fabrication, and inspection of piping systems.
Welder qualifications test is a process of testing and certifying welders to ensure that they have the necessary skills and knowledge to perform welding tasks safely and effectively.
Both piping code and welder qualifications test are important in ensu...
I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.
based on 2 interviews
Interview experience
based on 1 review
Rating in categories
Assistant Manager
1.1k
salaries
| ₹6 L/yr - ₹18.2 L/yr |
Senior Engineer
702
salaries
| ₹3 L/yr - ₹12 L/yr |
Assistant Construction Manager
490
salaries
| ₹5.4 L/yr - ₹17 L/yr |
Civil Site Engineer
385
salaries
| ₹1.2 L/yr - ₹8.4 L/yr |
Assistant Engineering Manager
328
salaries
| ₹6 L/yr - ₹17 L/yr |
Larsen & Toubro Limited
Dilip Buildcon
Simplex Infrastructures
Power Mech Projects