I applied via Approached by Company and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. About current work profile and new work responsibility
Round 2 - One-on-one 

(2 Questions)

  • Q1. Salary negotiation and joining
  • Q2. Early joining than the regular notice

Interview Preparation Tips

Interview preparation tips for other job seekers - Be well prepared about the company and it's achievements.

Interview questions from similar companies

I applied via Company Website and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Related to distribution network, safety and Quality of work related.

Interview Preparation Tips

Interview preparation tips for other job seekers - Never miss guide the inteiviower.

I applied via Naukri.com and was interviewed before Jan 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Related questions my job
Round 3 - Aptitude Test 
Round 4 - Assignment 

Manager related

Interview Preparation Tips

Interview preparation tips for other job seekers - very good experience in Adani till today

Interview Questionnaire 

1 Question

  • Q1. Question about power distribution has been asked.

I applied via Naukri.com and was interviewed before Nov 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Experience related questions Materials selection, material properties Types of hardwares, bolted joints types
Round 3 - Technical 

(1 Question)

  • Q1. Model test on Autodesk Inventor
Round 4 - HR 

(1 Question)

  • Q1. CTC Related discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared with you resume/ CV questions more related to resume and experience

I applied via Naukri.com and was interviewed in Feb 2021. There were 7 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical questions.

Interview Preparation Tips

Interview preparation tips for other job seekers - You have to technicaly very strong. Full knowledge of MoRTH and IRC.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical Round
Round 3 - One-on-one 

(1 Question)

  • Q1. Technical details asked
Round 4 - One-on-one 

(1 Question)

  • Q1. Past experience details taken

Interview Preparation Tips

Interview preparation tips for other job seekers - Your profile should be perfectly matched and should be technically sound in your area
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. How to manage 100mw wtg spare
  • Ans. 

    Managing 100mw wtg spare involves efficient planning, inventory management, and proactive maintenance.

    • Develop a comprehensive spare parts inventory management system

    • Regularly assess the condition of spare parts and replace as needed

    • Implement preventive maintenance strategies to minimize downtime

    • Establish strong relationships with suppliers to ensure timely availability of spare parts

    • Monitor and analyze data to identify...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Hard
Process Duration
-
Result
Selected Selected

I applied via Referral and was interviewed before Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. WTG operation and different between synchronous and asynchronous generator
  • Ans. 

    WTG operation involves converting wind energy into electrical energy. Synchronous generators produce power at a constant speed, while asynchronous generators vary in speed.

    • Wind turbine generators (WTGs) convert wind energy into electrical energy through the use of a rotor and a generator.

    • Synchronous generators produce power at a constant speed that is synchronized with the grid frequency.

    • Asynchronous generators, also k...

  • Answered by AI
  • Q2. Explain as per WTG technology
  • Ans. 

    WTG technology refers to Wind Turbine Generator technology used in renewable energy production.

    • WTG technology involves the use of wind turbines to generate electricity.

    • The turbines are typically placed in locations with high wind speeds to maximize energy production.

    • The generated electricity is then fed into the grid for distribution to consumers.

    • Maintenance of the turbines is crucial to ensure optimal performance and ...

  • Answered by AI

I applied via Shine and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. TDS, ind as, Power Sector, GST, Income tax

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't spoil your career

Kp Energy Interview FAQs

How many rounds are there in Kp Energy Administration Manager interview for experienced candidates?
Kp Energy interview process for experienced candidates usually has 2 rounds. The most common rounds in the Kp Energy interview process for experienced candidates are HR and One-on-one Round.

Tell us how to improve this page.

Kp Energy Administration Manager Interview Process for Experienced

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 232 Interviews
Adani Group Interview Questions
3.9
 • 200 Interviews
Tata Power Interview Questions
3.9
 • 168 Interviews
Torrent Power Interview Questions
3.7
 • 132 Interviews
Suzlon Group Interview Questions
4.1
 • 131 Interviews
Eaton Interview Questions
3.9
 • 122 Interviews
Reliance Power Interview Questions
4.1
 • 48 Interviews
Inox Wind Interview Questions
3.7
 • 39 Interviews
L&T Power Interview Questions
3.9
 • 34 Interviews
JSW Energy Interview Questions
4.1
 • 31 Interviews
View all

Kp Energy Administration Manager Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

5.0

Skill development

4.0

Work-life balance

4.0

Salary

5.0

Job security

4.0

Company culture

4.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
16 salaries
unlock blur

₹3 L/yr - ₹10.5 L/yr

Electrical Engineer
12 salaries
unlock blur

₹2.2 L/yr - ₹3.9 L/yr

Project Engineer
10 salaries
unlock blur

₹1.5 L/yr - ₹3.6 L/yr

Senior Engineer
8 salaries
unlock blur

₹3.6 L/yr - ₹5.3 L/yr

Executive Accountant
5 salaries
unlock blur

₹2 L/yr - ₹4 L/yr

Explore more salaries
Compare Kp Energy with

Suzlon Group

4.1
Compare

Adani Power

3.9
Compare

Adani Group

3.9
Compare

Torrent Power

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview