Round 1 - Technical 

(2 Questions)

  • Q1. Technical questions about transmission line
  • Q2. Feeder capacity in wind 33 kv line

Interview Preparation Tips

Interview preparation tips for other job seekers - Great place to work with a friendly team

Engineer Interview Questions asked at other Companies

Q1. ❖ If a team member is unable to carry out his work, he is doing it repetitively, how would you handle it?, would you like to work only on lifing of components, or would you be ready to shift to other departments?
View answer (5)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. About current work profile and new work responsibility
Round 2 - One-on-one 

(2 Questions)

  • Q1. Salary negotiation and joining
  • Q2. Early joining than the regular notice

Interview Preparation Tips

Interview preparation tips for other job seekers - Be well prepared about the company and it's achievements.

Administration Manager Interview Questions asked at other Companies

Q1. How to handle during break down of equipments? What is the first step during property finalization. Asked bout cost cutting. Use of equipments with how much capacity requires etc...
View answer (1)
Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
-

I applied via Company Website and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Substation single diagram
  • Ans. 

    A substation single-line diagram is a simplified representation of a power system showing the electrical connections and components.

    • It shows the electrical connections between various components in a substation, such as transformers, circuit breakers, and switches.

    • The diagram typically includes symbols to represent different types of equipment and their interconnections.

    • It helps engineers and operators understand the f...

  • Answered by AI
  • Q2. All equipment arround the substation

Electrical Engineer Interview Questions asked at other Companies

Q1. What is the difference between Switch gear & Circuit Breakers ?
View answer (11)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Nov 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. 33/66 kV tanformer work in maintenance test
  • Q2. Condecter size &use in size
  • Ans. 

    Conductor size is determined by the amount of current it needs to carry and the distance it needs to travel.

    • Conductor size is measured in American Wire Gauge (AWG) or circular mils (CM)

    • Larger conductors can carry more current without overheating

    • Distance also affects conductor size as longer distances require larger conductors to prevent voltage drop

    • Conductor size is also determined by the type of insulation and the env...

  • Answered by AI
  • Q3. Current transformer work potential transformer work
  • Ans. 

    Current transformers and potential transformers are used for measuring electrical parameters.

    • Current transformers are used to measure high currents in power systems and step down the current to a level that can be measured by instruments.

    • Potential transformers are used to measure high voltages in power systems and step down the voltage to a level that can be measured by instruments.

    • Both transformers are used to provide...

  • Answered by AI

Electrical Shift Engineer Interview Questions asked at other Companies

Q1. what is difference between dry type and oil type
View answer (1)

Kp Energy interview questions for popular designations

 Administration Manager

 (1)

 Electrical Engineer

 (1)

 Electrical Shift Engineer

 (1)

 Engineer

 (1)

 Graduate Engineer Trainee (Get)

 (1)

 Senior Accounts Manager

 (1)

 Summer Intern

 (1)

Summer Intern Interview Questions & Answers

user image Anonymous

posted on 11 Jan 2023

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Basic introduction, hobbies and interest
  • Q2. Long term career plans

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident while giving interview and answers should be to the point. your attitude and skills matters,

Summer Intern Interview Questions asked at other Companies

Q1. There are 8 bottles of milk out of which one bottle is poisoned. What will be the minimum number of persons required to find the poisoned bottle if the person dies within 24 hours of drinking the poison. You have only 24 hours.
View answer (6)

I applied via Campus Placement and was interviewed in Aug 2022. There were 2 interview rounds.

Round 1 - Any one techcal person get job 

(2 Questions)

  • Q1. Name and home location
  • Q2. Tell me about your self?
Round 2 - HR 

(1 Question)

  • Q1. Tell me about your self.

Interview Preparation Tips

Interview preparation tips for other job seekers - Nothing to study for a supervisor in wind sector

Graduate Engineer Trainee (Get) Interview Questions asked at other Companies

Q1. Q: 1 What is IC engine? What is the types of IC engine? Q:2 Difference between Otto cycle and Diesel cycle? What is the process of both cycle and what is the effeciency of both cycle ? Which one is good in effeciency? Q:3 Difference between... read more
View answer (2)

Jobs at Kp Energy

View all

I applied via Naukri.com and was interviewed before Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Personal info, Technical questions related to Accounts and projects associated.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare yourself with strong command in the specified work areas and your job profile.

Senior Accounts Manager Interview Questions asked at other Companies

Q1. 1st Question List down the errors which affect trial balance and errors which do not affect trial balance ?
View answer (1)

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I was interviewed in Jul 2024.

Round 1 - Technical 

(10 Questions)

  • Q1. Can you tell me about yourself?
  • Q2. What are your responsibilities in the plant?
  • Q3. Why is tan delta testing conducted in power transformers?
  • Q4. What is a vector group?
  • Q5. What should be considered when erecting an IDT (Inverter duty Transformer)?
  • Q6. What is the star-delta connection in power transformers?
  • Q7. What types of conductors are used in high-tension (HT) lines, and what are their current capacities?
  • Q8. What is the distance between poles in 33KV high tension lines?
  • Q9. What is the process of laying LT cables?
  • Q10. What is the process for attaching modules?
Round 2 - HR 

(2 Questions)

  • Q1. Why do you want to change jobs?
  • Q2. What can you share about your family?
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(5 Questions)

  • Q1. Rules and safety
  • Q2. Salery package and comfrom
  • Q3. No question issue
  • Q4. No question problem
  • Q5. No question problem answer

Interview Preparation Tips

Interview preparation tips for other job seekers - Quality assurance department
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Dec 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. This job parmanent?
  • Q2. My sallary?
Round 2 - Technical 

(2 Questions)

  • Q1. Where is job Location?
  • Q2. Others facility?
Round 3 - Technical 

(2 Questions)

  • Q1. My intervew date?
  • Q2. Week off

Interview Preparation Tips

Interview preparation tips for other job seekers - Thank you for your support

Kp Energy Interview FAQs

How many rounds are there in Kp Energy interview?
Kp Energy interview process usually has 1-2 rounds. The most common rounds in the Kp Energy interview process are HR, Resume Shortlist and Technical.
How to prepare for Kp Energy interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Kp Energy. The most common topics and skills that interviewers at Kp Energy expect are Renewable Energy, Solar Energy, Business Development, Solar and Communication Skills.
What are the top questions asked in Kp Energy interview?

Some of the top questions asked at the Kp Energy interview -

  1. current transformer work potential transformer w...read more
  2. condecter size &use in s...read more
  3. substation single diag...read more

Tell us how to improve this page.

Kp Energy Interview Process

based on 7 interviews

Interview experience

4.4
  
Good
View more

Interview Questions from Similar Companies

Tata Power Interview Questions
3.9
 • 160 Interviews
Suzlon Group Interview Questions
4.1
 • 124 Interviews
ReNew Interview Questions
4.2
 • 82 Interviews
Waaree Energies Interview Questions
3.9
 • 55 Interviews
Greenko Group Interview Questions
3.9
 • 44 Interviews
Inox Wind Interview Questions
3.7
 • 37 Interviews
Vikram Solar Interview Questions
4.0
 • 30 Interviews
Azure Power Interview Questions
3.9
 • 20 Interviews
View all

Kp Energy Reviews and Ratings

based on 56 reviews

4.1/5

Rating in categories

4.1

Skill development

3.8

Work-life balance

3.9

Salary

4.0

Job security

4.1

Company culture

3.7

Promotions

4.0

Work satisfaction

Explore 56 Reviews and Ratings
Travel Desk Executive

Vadodara

2-5 Yrs

₹ 2-5 LPA

Business Development Manager

Jaipur

8-13 Yrs

Not Disclosed

Explore more jobs
Assistant Manager
14 salaries
unlock blur

₹3 L/yr - ₹10.5 L/yr

Senior Engineer
14 salaries
unlock blur

₹2 L/yr - ₹5.2 L/yr

Project Engineer
10 salaries
unlock blur

₹1.5 L/yr - ₹3.6 L/yr

Electrical Engineer
10 salaries
unlock blur

₹2.2 L/yr - ₹3.9 L/yr

Manager
5 salaries
unlock blur

₹6.7 L/yr - ₹10 L/yr

Explore more salaries
Compare Kp Energy with

Suzlon Group

4.1
Compare

ReNew

4.2
Compare

Tata Power

3.9
Compare

Adani Green Energy

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview