Filter interviews by
I applied via Naukri.com and was interviewed before Sep 2023. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Mar 2020. There were 2 interview rounds.
About experience your knowledge and wrok you did in the early organization
posted on 10 Apr 2022
I applied via Approached by Company and was interviewed in Oct 2021. There were 3 interview rounds.
SunEdison Infrastructure interview questions for popular designations
I applied via Approached by Company and was interviewed before Mar 2022. There were 2 interview rounds.
Top trending discussions
I was interviewed in Aug 2024.
posted on 12 Feb 2025
Adani solar energy sidda
I was interviewed before Apr 2022.
Maintenance work in power plant involves regular inspections, repairs, and upgrades to ensure smooth operation and safety.
Regularly inspecting equipment for signs of wear and tear
Performing routine maintenance tasks such as lubricating moving parts
Repairing faulty equipment to prevent breakdowns
Upgrading systems to improve efficiency and safety
Following safety protocols to prevent accidents
Keeping detailed records of m
All types of electrical equipment refer to a wide range of devices used for generating, transmitting, and distributing electricity.
Generators: devices that convert mechanical energy into electrical energy
Transformers: devices that change the voltage of electricity for transmission
Switchgear: equipment used to control, protect, and isolate electrical circuits
Cables and wires: used for transmitting electricity from one p...
Some of the top questions asked at the SunEdison Infrastructure interview -
based on 4 interviews
Interview experience
based on 59 reviews
Rating in categories
Assistant Manager
16
salaries
| ₹5.5 L/yr - ₹11 L/yr |
Project Engineer
9
salaries
| ₹2 L/yr - ₹4.1 L/yr |
Senior Engineer
8
salaries
| ₹4 L/yr - ₹7.7 L/yr |
Senior Relationship Manager
7
salaries
| ₹5.5 L/yr - ₹8 L/yr |
Relationship Manager
7
salaries
| ₹4.5 L/yr - ₹6 L/yr |
Azure Power
Adani Green Energy
Tata Power Renewable Energy
ReNew