Operation & Maintenance Engineer Interview Questions

user image GAURAV KUMAR DOHARE

posted on 10 Apr 2022

I applied via Approached by Company and was interviewed in Oct 2021.

3 Interview Rounds

1

Resume Shortlist Round

Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
2

Technical Round (1 Question)

  • Q1. Transformer solar power
3

HR Round (7 Questions)

  • Q1. Why should we hire you?
  • Q2. What is your family background?
  • Q3. Why are you looking for a change?
  • Q4. What are your strengths and weaknesses?
  • Q5. What are your salary expectations?
  • Q6. Share details of your previous job.
  • Q7. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Tell only your practical fields skills

Interview questions from similar companies

Interview experience
5
 Excellent
Difficulty level
 -
Duration
 -
Result
 -

1 Interview Round

1

One-on-one Round (2 Questions)

  • Q1. Coal handling plant Operations
  • Q2. Coal handling plant operations maintenance

Interview Preparation Tips

Interview preparation tips for other job seekers - Set water sprinkler system installation for dust
Interview experience
5
 Excellent
Difficulty level
 Moderate
Duration
 Less than 2 weeks
Result
Selected  Selected

I applied via Company Website and was interviewed before May 2023.

1 Interview Round

1

Technical Round (3 Questions)

  • Q1. What is gear box and it's type
  • Q2. What is preventive maintenance
  • Q3. Future of Wind sector in renewable energy

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview level moderate

I was interviewed before Aug 2016.

3 Interview Rounds

Interview Preparation Tips

Round: Test
Total Questions: 60

Skills: Technical Questions
Interview experience
5
 Excellent
Difficulty level
 Easy
Duration
 -
Result
 -

I applied via Company Website and was interviewed in Jun 2024.

2 Interview Rounds

1

Group Discussion Round

Gear box replacement work

2

HR Round (6 Questions)

  • Q1. Barring checking and replacement work and safety first and paper work and walked away clean and fresh and try out and blumber block top cover open and old barri...read more
  • Q2. V-scraper replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old v-scraper remove and new v-scra...read more
  • Q3. Motor replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old motor remove and new motor replace ...read more
  • Q4. Discharge chute replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old discharge chute remove an...read more
  • Q5. Gear box replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old gear box remove and new gear box...read more
  • Q6. Conveyor pully greasing and saving work and safety first and paper work and walked away clean and fresh and grease gunand all pully checking and saving greasing...read more

Interview Preparation Tips

Interview preparation tips for other job seekers - Because of the growth of opportunity and advancement
Interview experience
4
 Good
Difficulty level
 Moderate
Duration
 2-4 weeks
Result
Selected  Selected

I applied via Referral and was interviewed in Nov 2024.

1 Interview Round

1

HR Round (3 Questions)

  • Q1. What about your daily tasks
  • Q2. Why you want to join the company
  • Q3. What are your goals

Interview Preparation Tips

Interview preparation tips for other job seekers - Practise technical questions

1 Interview Round

1

Technical Round (1 Question)

  • Q1. What are your technical certifications?
Interview experience
4
 Good
Difficulty level
 Moderate
Duration
 Less than 2 weeks
Result
Selected  Selected

I applied via campus placement at Dayalbagh Educational Institute, Agra and was interviewed before Sep 2022.

5 Interview Rounds

1

Resume Shortlist Round

Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
2

Aptitude Test Round

General aptitude test follwed by a technical round. Questions were asked from different online forums/sites. Lengthy to be solved at own. it was a CBT.

3

Group Discussion Round

GD was conducted in batches of 10 to 15. Firstly all members were given 3 choices of topics for GD. GD topics were very general. Then the selected topic was reserved for the GD. it was more like a debate. Everyone raised volume to ensure that they are heard more. Those who spoke more irrespective of the quality of arguments, finally aced the GD round.

4

One-on-one Round (7 Questions)

  • Q1. General information regarding my educational background and family background. HR raised questions entirely from my resume
  • Q2. Tell me about yourself
  • Q3. What does your parents/siblings do
  • Q4. Tell me about the internship
  • Q5. Explain your project during internship
  • Q6. Would you be comfortable with pan india location
  • Q7. Tell me about your city
5

Technical Round (7 Questions)

  • Q1. What is your favorite subject
  • Q2. Why is ........... your favorite subject
  • Q3. Do you know how a thermal power plant works
  • Q4. Explain working of thermal power plant
  • Q5. Explain rankine cycle
  • Q6. How is electricity produced in generator? Which law explain
  • Q7. Why you want to be in jsw energy

Interview Preparation Tips

Topics to prepare for JSW Energy Mechanical Maintenance Engineer interview:
  • Thermodynamics
Interview preparation tips for other job seekers - If non NPTI you will be given Maintance Department. Mechanical will get mechanical and electrical may get I&C, switchyard, E&I. Complete absence of worklife balance. Pay and facility is no doubt excellent but you will have to compromise with following things if pay is what you desire:

Worklife balance, skill enhancement, learning/gaining new skills, job satisfaction, no fixed working hours, growth opportunities, personal life

Maintenance Engineer Interview Questions

Inox Wind user image pourash ramesh das

posted on 29 Mar 2022

I applied via Naukri.com and was interviewed in Mar 2022.

3 Interview Rounds

1

Technical Round (1 Question)

  • Q1. Can not disclose interview question as per company norms
2

Technical Round (1 Question)

  • Q1. Interview on Previous experience
3

HR Round (1 Question)

  • Q1. Asking about yourself your past experience knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Great interview experience. Should focus on previous experience and have proper knowledge of current and previous job.
Interview experience
3
 Average
Difficulty level
 -
Duration
 -
Result
 -

1 Interview Round

1

Technical Round (2 Questions)

  • Q1. ATW maintenance
  • Q2. Other maintenance

SunEdison Infrastructure Interview FAQs

How many rounds are there in SunEdison Infrastructure Operation & Maintenance Engineer interview?
SunEdison Infrastructure interview process usually has 3 rounds. The most common rounds in the SunEdison Infrastructure interview process are Resume Shortlist, Technical and HR.

Tell us how to improve this page.

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 198 Interviews
Adani Group Interview Questions
3.9
 • 173 Interviews
Tata Power Interview Questions
4.0
 • 156 Interviews
Suzlon Group Interview Questions
4.1
 • 121 Interviews
Torrent Power Interview Questions
3.8
 • 117 Interviews
Eaton Corporation Interview Questions
4.0
 • 112 Interviews
ReNew Interview Questions
4.2
 • 80 Interviews
Reliance Power Interview Questions
4.1
 • 43 Interviews
View all
SunEdison Infrastructure Operation & Maintenance Engineer Salary
based on 4 salaries
₹2.2 L/yr - ₹3.6 L/yr
15% less than the average Operation & Maintenance Engineer Salary in India
View more details

SunEdison Infrastructure Operation & Maintenance Engineer Reviews and Ratings

based on 2 reviews

4.0/5

Rating in categories

3.0

Skill development

4.5

Work-Life balance

3.5

Salary & Benefits

4.5

Job Security

4.5

Company culture

4.5

Promotions/Appraisal

4.5

Work Satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
16 salaries
unlock blur

₹5.5 L/yr - ₹11 L/yr

Project Engineer
9 salaries
unlock blur

₹2 L/yr - ₹4.1 L/yr

Senior Engineer
8 salaries
unlock blur

₹4 L/yr - ₹7.7 L/yr

Senior Relationship Manager
7 salaries
unlock blur

₹5.5 L/yr - ₹8 L/yr

Relationship Manager
7 salaries
unlock blur

₹4.5 L/yr - ₹6 L/yr

Explore more salaries
Compare SunEdison Infrastructure with

Azure Power

3.9
Compare

Adani Green Energy

4.1
Compare

Tata Power Renewable Energy

3.6
Compare

ReNew

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview