Filter interviews by
I applied via Monster and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
I applied via Approached by Company and was interviewed in Oct 2024. There were 2 interview rounds.
I applied via Company Website and was interviewed in Nov 2023. There were 5 interview rounds.
Kored Infratech interview questions for popular designations
About work& job description
I applied via Indeed and was interviewed before Oct 2020. There were 3 interview rounds.
Dams are executed through a series of steps including planning, design, construction, and maintenance.
Planning involves identifying the purpose of the dam, assessing the site, and determining the type of dam to be built.
Design involves creating detailed plans and specifications for the dam, including its size, shape, and materials.
Construction involves building the dam according to the design plans, which may involve e...
I applied via Referral and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via LinkedIn and was interviewed before Oct 2020. There were 3 interview rounds.
posted on 25 Oct 2017
I was interviewed before Oct 2016.
Turbine erection alignment and commissioning procedure involves the process of aligning and commissioning a turbine for optimal performance.
Turbine erection alignment involves ensuring the turbine is properly aligned with the foundation and other components.
Commissioning procedure includes testing and verifying the functionality of the turbine.
Alignment is typically done using laser alignment tools to ensure precise po...
The turbine erection sequence refers to the specific order in which the components of a turbine are assembled and installed.
The foundation is prepared and the anchor bolts are installed.
The base frame is positioned and aligned with the anchor bolts.
The turbine tower sections are lifted and assembled on top of the base frame.
The nacelle, which houses the turbine's generator and other components, is installed on top of t...
posted on 10 Sep 2017
I was interviewed before Sep 2016.
based on 9 interviews
Interview experience
based on 72 reviews
Rating in categories
MIS Executive
47
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Technical Manager
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Hindustan Construction Company