Filter interviews by
About work& job description
Top trending discussions
I applied via Walk-in and was interviewed in Aug 2023. There were 4 interview rounds.
A chiller is a machine that removes heat from a liquid via a vapor-compression or absorption refrigeration cycle.
Chillers are commonly used in air conditioning systems to cool buildings or industrial processes.
They work by transferring heat from the liquid being chilled to a separate fluid, which is then circulated through a heat exchanger to cool it down.
Chillers can be water-cooled or air-cooled, depending on the app
Salary and job responsibilities
I applied via Walk-in and was interviewed before Sep 2023. There were 2 interview rounds.
Through a job posting on LinkedIn
Found job posting on LinkedIn
Researched company after seeing job posting
Connected with current employees on LinkedIn
Received referral from a friend or colleague
I have 8 years of experience working on high rise projects with contractor companies.
I have worked on multiple high rise projects ranging from 20 to 50 stories.
Managed structural design and construction of high rise buildings.
Collaborated with architects, contractors, and clients to ensure project success.
Asking about Experience like structure, finishing.
What is testing of Steel IS CODE
BILLING OF IS CODE
BBS IS CODE.
CMD IS CODE.
SAFETY HAZARD ANALYSIS.
CONSTRUCTION METHOD STATEMENT.
TYPES OF PLASTER
OUTER PLASTER THICKNESS.
INNER PLASTER THICKNESS.
posted on 11 Dec 2023
I applied via Referral
I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.
posted on 27 May 2024
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
posted on 22 Feb 2022
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
I was interviewed in Jan 2025.
I applied via Company Website and was interviewed in Nov 2024. There were 2 interview rounds.
Yes, I refer to structures drawings for design and construction purposes.
I refer to structures drawings to understand the design requirements
I use structures drawings to ensure compliance with building codes and regulations
I consult structures drawings during construction to ensure accuracy and quality of work
Examples: architectural, structural, and MEP drawings
Yes, I refer to rcp drawings for engineering projects.
I regularly refer to rcp drawings to understand the layout and design of the project
Rcp drawings help me visualize the piping and instrumentation details
They are crucial for coordinating with other team members and ensuring accuracy in the project
The process of construction building involves planning, designing, obtaining permits, site preparation, foundation construction, framing, roofing, finishing, and inspections.
Planning: Determine the scope, budget, and timeline of the project.
Designing: Create architectural and structural plans.
Obtaining permits: Obtain necessary approvals from local authorities.
Site preparation: Clear the land and prepare it for constru...
I plan to work with the organization for the long term, as I am committed to growing and contributing to its success.
I am looking for a stable and fulfilling career with opportunities for growth and development within the organization.
I believe in building strong relationships with colleagues and stakeholders over time.
I am committed to continuously improving my skills and knowledge to add value to the organization.
I a...
based on 1 interview
Interview experience
MIS Executive
45
salaries
| ₹1.7 L/yr - ₹3.4 L/yr |
Civil Site Engineer
16
salaries
| ₹2.7 L/yr - ₹4.6 L/yr |
Technical Manager
12
salaries
| ₹4.2 L/yr - ₹6 L/yr |
Site Engineer
10
salaries
| ₹3.6 L/yr - ₹5 L/yr |
Engineer
7
salaries
| ₹2.8 L/yr - ₹4 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Hindustan Construction Company