Upload Button Icon Add office photos

Knight Frank

Compare button icon Compare button icon Compare

Filter interviews by

Knight Frank Engineer Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Diffirence between project and project engineering
  • Ans. 

    Project refers to a specific task with a defined start and end, while project engineering involves the technical aspects of planning, designing, and executing the project.

    • Project is the overall task or objective to be completed within a specific timeframe.

    • Project engineering focuses on the technical aspects such as planning, designing, and executing the project.

    • Project management involves coordinating resources and tas...

  • Answered by AI
  • Q2. Types of services in interior fitout
  • Ans. 

    Types of services in interior fitout include design, construction, project management, and installation.

    • Design services involve creating layouts, selecting materials, and creating 3D visualizations.

    • Construction services include building partitions, ceilings, and flooring.

    • Project management services involve coordinating schedules, budgets, and contractors.

    • Installation services include fitting furniture, fixtures, and eq...

  • Answered by AI
Round 3 - One-on-one 

(2 Questions)

  • Q1. Problems faced in site
  • Ans. 

    Some common problems faced on site include delays in material delivery, inclement weather, and coordination issues.

    • Delays in material delivery can impact project timelines and budgets

    • Inclement weather can halt work progress and cause safety concerns

    • Coordination issues between different teams can lead to misunderstandings and errors

  • Answered by AI
  • Q2. Difference between agreement and bond
  • Ans. 

    Agreement is a mutual understanding between parties, while a bond is a legal document that ensures fulfillment of obligations.

    • Agreement is a mutual understanding between two or more parties.

    • A bond is a legal document that guarantees the fulfillment of obligations.

    • Agreements are usually informal and may not always be legally binding.

    • Bonds are formal and legally enforceable documents.

    • Examples of agreements include contra...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Low tension cable rating 440v
  • Ans. 

    Low tension cables rated for 440V are commonly used for power distribution in residential and commercial buildings.

    • Low tension cables are typically rated for voltages up to 1000V.

    • These cables are commonly used for power distribution in buildings.

    • Examples of low tension cables include PVC insulated cables and XLPE insulated cables.

  • Answered by AI
  • Q2. 11kv cable strenght and voltage

Interview Questionnaire 

1 Question

  • Q1. ALL CIVIL WORK OF SITE

Interview Preparation Tips

Interview preparation tips for other job seekers - Project Engineer

I applied via Referral and was interviewed before Jan 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Intrudes your self.
  • Q2. Tell me about your skill

Interview Preparation Tips

Interview preparation tips for other job seekers - Overall good, all about intrudes myself. Describe my work experience. Telling all my technical skills.

I applied via Company Website and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Type of work I am doing in previous company
  • Q2. All construction activities I handeld

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Company & Good Culture
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. Aluminium Formwork activity brief description.
  • Ans. 

    Aluminium formwork is a construction technique that uses lightweight aluminium panels to form concrete walls, floors, and columns.

    • Aluminium formwork is a modern construction technique that is faster and more efficient than traditional formwork methods.

    • It involves using lightweight aluminium panels that are easy to handle and can be reused multiple times.

    • The panels are assembled on site to form the desired shape and siz...

  • Answered by AI
  • Q2. Waterproofing Procedure
  • Ans. 

    Waterproofing procedure involves applying a waterproof barrier to prevent water from penetrating a building structure.

    • Identify the areas that need waterproofing such as roofs, walls, and foundations.

    • Choose the appropriate waterproofing material based on the type of structure and the level of water exposure.

    • Prepare the surface by cleaning and repairing any cracks or damage.

    • Apply the waterproofing material using the reco...

  • Answered by AI
  • Q3. External Development area step by step activities
  • Q4. What is Steel Fibre Road Concrete?
  • Ans. 

    Steel Fibre Road Concrete is a type of concrete that contains steel fibres to improve its strength and durability.

    • Steel fibres are added to the concrete mix to enhance its mechanical properties.

    • The fibres act as reinforcement and help to prevent cracking and improve resistance to wear and tear.

    • Steel Fibre Road Concrete is commonly used in the construction of roads, bridges, and other infrastructure projects.

    • It is also ...

  • Answered by AI
  • Q5. Piling works what i had done
  • Ans. 

    I have experience in piling works including design, installation, and testing of piles.

    • Designed pile foundations for various structures including bridges and buildings

    • Installed piles using various methods such as driven piles and drilled shafts

    • Conducted pile load tests to ensure the capacity of the piles

    • Managed and supervised piling works on construction sites

    • Ensured compliance with safety regulations and quality stand

  • Answered by AI
  • Q6. Concrete technology for site activity
  • Ans. 

    Concrete technology is crucial for site activity as it involves the proper mixing, placing, and curing of concrete.

    • Understanding the properties of concrete and how it reacts to different conditions

    • Proper mixing of concrete ingredients to achieve the desired strength and consistency

    • Ensuring proper placement and compaction of concrete to avoid voids and weak spots

    • Proper curing of concrete to achieve maximum strength and ...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why i want to leave the current company
  • Q2. What is my expectation for their organisation

Interview Preparation Tips

Interview preparation tips for other job seekers - Technically u need to have a microlevel knowledge.

Manager Interview Questions & Answers

CBRE user image Anonymous

posted on 25 Nov 2021

I applied via Referral and was interviewed before Nov 2020. There were 5 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About yourself and questions relevant to your profile..
  • Q2. Thoroughly explore your current work in detail because your questions will be based on your current work mostly

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident in your response and listen to interviewer carefully so you will not ask the question to be repeated..
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. How much experience in finishing work

Junior Engineer Interview Questions & Answers

Nyati Group user image Chandan Shirbhayye

posted on 16 Mar 2025

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Feb 2025, where I was asked the following questions.

  • Q1. Have you ever used ERP ? And which one
  • Q2. Tell me about your past experience in your previous company

Interview Preparation Tips

Interview preparation tips for other job seekers - For junior level you will get good experience in this company
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Tell me about your self
  • Q2. Density of building materials
  • Ans. 

    Building materials have varying densities depending on their composition.

    • Density is the mass per unit volume of a material.

    • Common building materials and their densities include concrete (2.4 g/cm³), brick (1.9-2.2 g/cm³), and wood (0.5-0.8 g/cm³).

    • Density affects the strength and durability of a structure, as well as its weight and cost.

  • Answered by AI
  • Q3. Billing procedure of your current company

Interview Preparation Tips

Interview preparation tips for other job seekers - Do not join if they told you to join in contracting division.

Knight Frank Interview FAQs

How to prepare for Knight Frank Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Knight Frank. The most common topics and skills that interviewers at Knight Frank expect are Construction Management, Finishing, Flooring, High Rise Building and PEB.

Tell us how to improve this page.

Interview Questions from Similar Companies

CBRE Interview Questions
4.2
 • 273 Interviews
InvestoXpert Interview Questions
4.2
 • 63 Interviews
M3M India Interview Questions
4.1
 • 48 Interviews
Smartworks Interview Questions
3.6
 • 32 Interviews
Aliens Group Interview Questions
3.2
 • 30 Interviews
Nyati Group Interview Questions
4.2
 • 29 Interviews
Berkadia Interview Questions
3.9
 • 28 Interviews
SMEC Interview Questions
3.7
 • 27 Interviews
View all

Fast track your campus placements

View all
Knight Frank Engineer Salary
based on 4 salaries
₹3.6 L/yr - ₹5.2 L/yr
21% less than the average Engineer Salary in India
View more details
Engineer - Finishes

Shamshabad

5-7 Yrs

Not Disclosed

Explore more jobs
Project Engineer
137 salaries
unlock blur

₹2.6 L/yr - ₹8.1 L/yr

Assistant Project Manager
123 salaries
unlock blur

₹5.2 L/yr - ₹12.2 L/yr

Project Manager
102 salaries
unlock blur

₹7 L/yr - ₹18.8 L/yr

Assistant Facility Manager
94 salaries
unlock blur

₹2.9 L/yr - ₹7.2 L/yr

Senior Project Engineer
83 salaries
unlock blur

₹4.1 L/yr - ₹9.5 L/yr

Explore more salaries
Compare Knight Frank with

CBRE

4.2
Compare

M3M India

4.1
Compare

R.S. Infraprojects

3.9
Compare

My Home Constructions

4.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview