I applied via Company Website and was interviewed in Sep 2024. There were 3 interview rounds.
Current CTC is $60,000 and Expected CTC is $70,000.
Current CTC is $60,000 per annum.
Expected CTC is $70,000 per annum.
The expected CTC includes a potential increase based on my experience and skills.
I am open to negotiation based on the overall compensation package offered.
Wastage of materials in construction projects can occur due to poor planning, inaccurate measurements, mishandling, or theft.
Wastage can occur due to inaccurate measurements during cutting or shaping of materials.
Poor planning can lead to ordering excess materials that end up unused.
Mishandling of materials during transportation or storage can result in damage and wastage.
Theft of materials on construction sites is als...
Mode of measurement billing steps involve determining the method of measurement and the corresponding billing process.
Mode of measurement refers to the specific rules and guidelines used to measure quantities of work done on a construction project.
Billing steps involve converting the measured quantities into monetary values based on the agreed rates and terms in the contract.
Common modes of measurement include SMM7, CE...
I applied via Referral and was interviewed in May 2024. There were 3 interview rounds.
Productivity of one carpenter & 1 bar bender depends on the type of work and skill level.
Productivity can vary based on the complexity of the task assigned.
A skilled carpenter may be able to complete tasks faster than an inexperienced one.
Efficiency of tools and equipment can also impact productivity.
On average, a carpenter can complete 8-12 square meters of formwork per day, while a bar bender can bend around 200-300
Indirect costs of a project are expenses not directly related to the specific project activities.
Indirect labor costs (e.g. supervision, support staff)
Indirect materials costs (e.g. consumables, tools)
Indirect expenses (e.g. utilities, rent)
Overhead costs (e.g. administrative expenses)
Insurance costs
Taxes
The co-efficient of tile adhesive for wall cladding is typically around 0.5 to 0.7.
The co-efficient of tile adhesive refers to the amount of adhesive needed to secure a certain area of wall cladding.
It is usually recommended to follow the manufacturer's instructions for the specific type of tile adhesive being used.
The co-efficient can vary based on factors such as the type of tiles, substrate, and environmental condit...
The unit of skirting is typically measured in linear feet or meters.
Skirting is typically measured in linear feet or meters
It is used to cover the joint between the wall and the floor
Commonly used in construction and interior design projects
About my previous responsibility & why I want to leave previous Company ?
I applied via Referral and was interviewed in Jun 2023. There were 3 interview rounds.
We are currently using M25 grade concrete mix at our site with a ratio of 1:1:2 (cement:fine aggregate:coarse aggregate).
M25 grade concrete mix is being used at our site
The ratio of the mix is 1:1:2 (cement:fine aggregate:coarse aggregate)
For example, for 1 cubic meter of M25 concrete mix, we use 350 kg of cement, 700 kg of fine aggregate, and 1400 kg of coarse aggregate
Man power for work can be calculated by estimating the amount of work to be done, the time required to complete it, and the efficiency of the workers.
Estimate the amount of work to be done
Determine the time required to complete the work
Consider the efficiency of the workers
Calculate the total man hours needed by dividing the total work by the productivity rate of the workers
KMV Projects Limited interview questions for popular designations
I was interviewed in Nov 2023.
Get interview-ready with Top KMV Projects Limited Interview Questions
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.
Grades of concrete are classified based on their compressive strength. Common grades include M10, M20, M30, etc.
Concrete grades are denoted by the letter 'M' followed by a number, representing the compressive strength in megapascals (MPa)
For example, M20 concrete has a compressive strength of 20 MPa
Higher grade concrete like M30 or M40 is used for structures requiring higher strength
Lower grade concrete like M10 is use
Labor and material wastage can be controlled through proper planning, monitoring, and training.
Implement lean manufacturing principles to reduce waste in production processes
Regularly monitor and analyze production data to identify areas of improvement
Train employees on efficient use of materials and proper handling techniques
Utilize inventory management systems to track material usage and minimize overstocking
Implemen...
Lap zones in beams and columns ensure proper reinforcement overlap for structural integrity. Steel margin in footings provides additional strength and safety.
Lap zones in beams and columns refer to the area where reinforcement bars overlap to ensure proper load transfer and structural integrity
Steel margin in footings refers to the additional steel reinforcement provided in footings to enhance strength and safety
Proper...
I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Oct 2022. There were 3 interview rounds.
Interview experience
based on 699 reviews
Rating in categories
Hyderabad / Secunderabad
18-22 Yrs
Not Disclosed
Assistant Engineer
200
salaries
| ₹2 L/yr - ₹5.8 L/yr |
Engineer
72
salaries
| ₹3.4 L/yr - ₹7.5 L/yr |
Assistant Engineer - Civil
63
salaries
| ₹1.9 L/yr - ₹5.5 L/yr |
Senior Engineer
49
salaries
| ₹5 L/yr - ₹9.6 L/yr |
Civil Engineer
40
salaries
| ₹3 L/yr - ₹6.8 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company