Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by KMV Projects Limited Team. If you also belong to the team, you can get access from here

KMV Projects Limited Verified Tick

Compare button icon Compare button icon Compare
4.4

based on 699 Reviews

Filter interviews by

KMV Projects Limited Interview Questions, Process, and Tips

Updated 10 Nov 2024

Top KMV Projects Limited Interview Questions and Answers

View all 18 questions

KMV Projects Limited Interview Experiences

Popular Designations

20 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Sep 2024. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. About Current work profile
  • Q2. Current CTC and Expected CTC
  • Ans. 

    Current CTC is $60,000 and Expected CTC is $70,000.

    • Current CTC is $60,000 per annum.

    • Expected CTC is $70,000 per annum.

    • The expected CTC includes a potential increase based on my experience and skills.

    • I am open to negotiation based on the overall compensation package offered.

  • Answered by AI
Round 2 - Technical 

(3 Questions)

  • Q1. Technical questions About quantity surveying
  • Q2. Wastage of various materials
  • Ans. 

    Wastage of materials in construction projects can occur due to poor planning, inaccurate measurements, mishandling, or theft.

    • Wastage can occur due to inaccurate measurements during cutting or shaping of materials.

    • Poor planning can lead to ordering excess materials that end up unused.

    • Mishandling of materials during transportation or storage can result in damage and wastage.

    • Theft of materials on construction sites is als...

  • Answered by AI
  • Q3. Mode of measurement Billing steps
  • Ans. 

    Mode of measurement billing steps involve determining the method of measurement and the corresponding billing process.

    • Mode of measurement refers to the specific rules and guidelines used to measure quantities of work done on a construction project.

    • Billing steps involve converting the measured quantities into monetary values based on the agreed rates and terms in the contract.

    • Common modes of measurement include SMM7, CE...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Salary Negotiation and notice Period

Interview Preparation Tips

Interview preparation tips for other job seekers - Please be positive about your work

Quantity Surveyor Interview Questions asked at other Companies

Q1. What will you do if the site qty differ from Drawing qty
View answer (8)

Senior Engineer QS Interview Questions & Answers

user image indrajit pradhan

posted on 10 Nov 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in May 2024. There were 3 interview rounds.

Round 1 - Technical 

(4 Questions)

  • Q1. What is the productivity of one carpenter & 1 bar bender ?
  • Ans. 

    Productivity of one carpenter & 1 bar bender depends on the type of work and skill level.

    • Productivity can vary based on the complexity of the task assigned.

    • A skilled carpenter may be able to complete tasks faster than an inexperienced one.

    • Efficiency of tools and equipment can also impact productivity.

    • On average, a carpenter can complete 8-12 square meters of formwork per day, while a bar bender can bend around 200-300

  • Answered by AI
  • Q2. What are the indirect cost of a project ?
  • Ans. 

    Indirect costs of a project are expenses not directly related to the specific project activities.

    • Indirect labor costs (e.g. supervision, support staff)

    • Indirect materials costs (e.g. consumables, tools)

    • Indirect expenses (e.g. utilities, rent)

    • Overhead costs (e.g. administrative expenses)

    • Insurance costs

    • Taxes

  • Answered by AI
  • Q3. What is the co-efficient of tile adhesive for wall cladding ?
  • Ans. 

    The co-efficient of tile adhesive for wall cladding is typically around 0.5 to 0.7.

    • The co-efficient of tile adhesive refers to the amount of adhesive needed to secure a certain area of wall cladding.

    • It is usually recommended to follow the manufacturer's instructions for the specific type of tile adhesive being used.

    • The co-efficient can vary based on factors such as the type of tiles, substrate, and environmental condit...

  • Answered by AI
  • Q4. What is the unit of skirting ?
  • Ans. 

    The unit of skirting is typically measured in linear feet or meters.

    • Skirting is typically measured in linear feet or meters

    • It is used to cover the joint between the wall and the floor

    • Commonly used in construction and interior design projects

  • Answered by AI
Round 2 - Group Discussion 

About my previous responsibility & why I want to leave previous Company ?

Round 3 - HR 

(1 Question)

  • Q1. Salary Negotiation & share all details.

Interview Preparation Tips

Interview preparation tips for other job seekers - All are ok & Company also is good. Only interview process is some time taking. So, please assure offering letter & then give resign present Company.

Senior Engineer QS Interview Questions asked at other Companies

Q1. What is the co-efficient of tile adhesive for wall cladding ?
View answer (1)
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Planning Profile
Round 2 - HR 

(2 Questions)

  • Q1. Salary expectation
  • Q2. Notice period 30

Assistant Manager Planning Interview Questions asked at other Companies

Q1. 9) What is Regulating equipment and what is the purpose of it?
View answer (1)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jun 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Which Concrete mix using currently at your site and also how much qty of cement & fine aggregate and coarse aggregate in that ?
  • Ans. 

    We are currently using M25 grade concrete mix at our site with a ratio of 1:1:2 (cement:fine aggregate:coarse aggregate).

    • M25 grade concrete mix is being used at our site

    • The ratio of the mix is 1:1:2 (cement:fine aggregate:coarse aggregate)

    • For example, for 1 cubic meter of M25 concrete mix, we use 350 kg of cement, 700 kg of fine aggregate, and 1400 kg of coarse aggregate

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. How do you calculate man power for work ?
  • Ans. 

    Man power for work can be calculated by estimating the amount of work to be done, the time required to complete it, and the efficiency of the workers.

    • Estimate the amount of work to be done

    • Determine the time required to complete the work

    • Consider the efficiency of the workers

    • Calculate the total man hours needed by dividing the total work by the productivity rate of the workers

  • Answered by AI
  • Q2. As per drawing I calculate total qty of work and by using thumb rule approximately calculate no. of man power required.

Interview Preparation Tips

Topics to prepare for KMV Projects Limited Senior Engineer interview:
  • Concrete
  • Steel
  • High Rise Building
Interview preparation tips for other job seekers - Don't fear face the interview

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (54)

KMV Projects Limited interview questions for popular designations

 Senior Engineer

 (3)

 AGM

 (1)

 Assistant Engineer

 (1)

 Assistant Manager Planning

 (1)

 Associate Engineer

 (1)

 Engineer

 (1)

 Graduate Engineer Trainee (Get)

 (1)

 Junior Accounts Executive

 (1)

Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Nov 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Technical running equipment
  • Q2. Dumpe,Tm, excavator
Round 3 - HR 

(1 Question)

  • Q1. डॉक्यूमेंट veryfiation

Interview Preparation Tips

Topics to prepare for KMV Projects Limited Mechanical Engineer interview:
  • Maintenance

Mechanical Engineer Interview Questions asked at other Companies

Q1. What we need to do if pressure valve fail in boiler
View answer (8)

Get interview-ready with Top KMV Projects Limited Interview Questions

Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Experience & CTC
Round 3 - Technical 

(1 Question)

  • Q1. Experience & Technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Practice good sound in Technical subject

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (54)

Jobs at KMV Projects Limited

View all
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Grades of concrete and strengths
  • Ans. 

    Grades of concrete are classified based on their compressive strength. Common grades include M10, M20, M30, etc.

    • Concrete grades are denoted by the letter 'M' followed by a number, representing the compressive strength in megapascals (MPa)

    • For example, M20 concrete has a compressive strength of 20 MPa

    • Higher grade concrete like M30 or M40 is used for structures requiring higher strength

    • Lower grade concrete like M10 is use

  • Answered by AI
  • Q2. How to control labor and Matireal wastage
  • Ans. 

    Labor and material wastage can be controlled through proper planning, monitoring, and training.

    • Implement lean manufacturing principles to reduce waste in production processes

    • Regularly monitor and analyze production data to identify areas of improvement

    • Train employees on efficient use of materials and proper handling techniques

    • Utilize inventory management systems to track material usage and minimize overstocking

    • Implemen...

  • Answered by AI
  • Q3. Lap zones in beams and columns, steel margin in footings
  • Ans. 

    Lap zones in beams and columns ensure proper reinforcement overlap for structural integrity. Steel margin in footings provides additional strength and safety.

    • Lap zones in beams and columns refer to the area where reinforcement bars overlap to ensure proper load transfer and structural integrity

    • Steel margin in footings refers to the additional steel reinforcement provided in footings to enhance strength and safety

    • Proper...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Previous salary and location

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (54)
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Was taking payment
  • Q2. When was the payment made?

Junior Lab Technician Interview Questions asked at other Companies

Q1. How to calculate the normality ?
View answer (1)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. About profile and details
  • Q2. Experience and skills

Planning Engineer Interview Questions asked at other Companies

Q1. Prepare a small given example site schedule with sequencing and duration determine project duration in MSP/on Paper What is critical path method? How will you identify while making on paper rather than MSP? How would you track schedule-Proc... read more
View answer (1)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Present working details and salary and expecting salary was asking
  • Ans. Explain him my details and expecting salary
  • Answered Anonymously
Round 3 - Technical 

(1 Question)

  • Q1. 1.all working PRW rate maximum asking 2.material sizes, 3.site area, project cost ,builtup area 4.macheary and those capacity like batching plant, concrete pump, bhoom placer 5. Mixing ratios concrete and...
  • Ans. Maximum 99% I'm facing correct answer ***But main thing is interview depends based on our experting salary.... incase little bit salary expecting normal interview.....but I'm asking 35% increment so they are more questions
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - See my interview questions on technical round then find that answer 👍👍👍

Associate Engineer Interview Questions asked at other Companies

Q1. Count Ways To Reach The N-th StairsYou have been given a number of stairs. Initially, you are at the 0th stair, and you need to reach the Nth stair. Each time you can either climb one step or two steps. You are supposed to return the number... read more
View answer (5)

KMV Projects Limited Interview FAQs

How many rounds are there in KMV Projects Limited interview?
KMV Projects Limited interview process usually has 2-3 rounds. The most common rounds in the KMV Projects Limited interview process are HR, Technical and Resume Shortlist.
How to prepare for KMV Projects Limited interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at KMV Projects Limited. The most common topics and skills that interviewers at KMV Projects Limited expect are Project Execution, Project Planning, Civil Engineering, Project Management and SQL Server.
What are the top questions asked in KMV Projects Limited interview?

Some of the top questions asked at the KMV Projects Limited interview -

  1. Which Concrete mix using currently at your site and also how much qty of cement...read more
  2. 2. What are the safety precaution required for height wo...read more
  3. How do you calculate man power for wor...read more
How long is the KMV Projects Limited interview process?

The duration of KMV Projects Limited interview process can vary, but typically it takes about 2-4 weeks to complete.

Tell us how to improve this page.

KMV Projects Limited Interview Process

based on 4 interviews in last 1 year

Interview experience

3.8
  
Good

People are getting interviews through

based on 14 KMV Projects Limited interviews
Referral
Job Portal
Company Website
WalkIn
Recruitment Consultant
36%
14%
7%
7%
7%
29% candidates got the interview through other sources.
High Confidence
?
High Confidence means the data is based on a large number of responses received from the candidates.

KMV Projects Limited Reviews and Ratings

based on 699 reviews

4.4/5

Rating in categories

4.1

Skill development

4.0

Work-Life balance

4.2

Salary & Benefits

4.1

Job Security

4.2

Company culture

4.1

Promotions/Appraisal

4.1

Work Satisfaction

Explore 699 Reviews and Ratings
Senior Manager / Manager - Contracts & Claims

Hyderabad / Secunderabad

10-15 Yrs

Not Disclosed

Purchase Manager, Procurement, SCM, Vendor Development, Supply Chain

Hyderabad / Secunderabad

18-22 Yrs

Not Disclosed

Manager /sr manager - Contracts

Hyderabad / Secunderabad

5-10 Yrs

Not Disclosed

Explore more jobs
Assistant Engineer
200 salaries
unlock blur

₹2 L/yr - ₹5.8 L/yr

Engineer
72 salaries
unlock blur

₹3.4 L/yr - ₹7.5 L/yr

Assistant Engineer - Civil
63 salaries
unlock blur

₹1.9 L/yr - ₹5.5 L/yr

Senior Engineer
49 salaries
unlock blur

₹5 L/yr - ₹9.6 L/yr

Civil Engineer
40 salaries
unlock blur

₹3 L/yr - ₹6.8 L/yr

Explore more salaries
Compare KMV Projects Limited with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

Shapoorji Pallonji Group

4.2
Compare

Hindustan Construction Company

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview