I applied via Referral and was interviewed in May 2024. There were 3 interview rounds.
Productivity of one carpenter & 1 bar bender depends on the type of work and skill level.
Productivity can vary based on the complexity of the task assigned.
A skilled carpenter may be able to complete tasks faster than an inexperienced one.
Efficiency of tools and equipment can also impact productivity.
On average, a carpenter can complete 8-12 square meters of formwork per day, while a bar bender can bend around 200-300
Indirect costs of a project are expenses not directly related to the specific project activities.
Indirect labor costs (e.g. supervision, support staff)
Indirect materials costs (e.g. consumables, tools)
Indirect expenses (e.g. utilities, rent)
Overhead costs (e.g. administrative expenses)
Insurance costs
Taxes
The co-efficient of tile adhesive for wall cladding is typically around 0.5 to 0.7.
The co-efficient of tile adhesive refers to the amount of adhesive needed to secure a certain area of wall cladding.
It is usually recommended to follow the manufacturer's instructions for the specific type of tile adhesive being used.
The co-efficient can vary based on factors such as the type of tiles, substrate, and environmental condit...
The unit of skirting is typically measured in linear feet or meters.
Skirting is typically measured in linear feet or meters
It is used to cover the joint between the wall and the floor
Commonly used in construction and interior design projects
About my previous responsibility & why I want to leave previous Company ?
Top trending discussions
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.
I applied via Job Portal and was interviewed before Dec 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Nov 2022. There were 3 interview rounds.
I appeared for an interview in Sep 2024, where I was asked the following questions.
IS Code of Design Mix refers to Indian Standards for concrete mix design, ensuring quality and performance in construction.
IS 456:2000 provides guidelines for plain and reinforced concrete design.
IS 10262:2019 outlines the procedure for concrete mix design.
Mix design considers factors like workability, strength, and durability.
Example: A mix design for M25 concrete specifies a ratio of 1:1:2 (Cement:Sand:Aggregate).
The...
Welding methods for steel include various techniques like MIG, TIG, and Stick welding, each suited for different applications.
MIG Welding (Gas Metal Arc Welding) - Uses a continuous wire feed and is ideal for thin to medium thickness steel.
TIG Welding (Gas Tungsten Arc Welding) - Provides high precision and is suitable for thin materials and stainless steel.
Stick Welding (Shielded Metal Arc Welding) - Versatile and com...
Steel shuttering offers durability, reusability, and precision in construction, enhancing project efficiency and quality.
Durability: Steel shuttering can withstand harsh weather conditions and heavy loads, making it suitable for large-scale projects.
Reusability: Unlike timber, steel can be reused multiple times, reducing material costs over time.
Precision: Steel shuttering provides a high level of accuracy in dimension...
Composite plates offer enhanced strength, lightweight properties, and design flexibility for various applications.
High strength-to-weight ratio: Composite plates are significantly lighter than metals, making them ideal for aerospace applications.
Corrosion resistance: They resist environmental degradation, suitable for marine and chemical industries.
Design flexibility: Can be molded into complex shapes, allowing for inn...
Laying blocks involves precise techniques for alignment, mortar application, and ensuring structural integrity.
Prepare the foundation: Ensure the base is level and clean before starting.
Mix mortar: Use the right ratio of cement, sand, and water for optimal adhesion.
Lay the first block: Start at a corner, applying mortar to the bottom and sides.
Check alignment: Use a level to ensure blocks are straight and even.
Stagger ...
I applied via Company Website and was interviewed in Jun 2023. There were 3 interview rounds.
P6 is a project management software used for scheduling, Float is the amount of time an activity can be delayed without delaying the project, Critical activities are tasks that must be completed on time to prevent project delays.
P6 is a software used for project scheduling and management
Float is the amount of time an activity can be delayed without affecting the project deadline
Critical activities are tasks that have z...
based on 1 interview
Interview experience
based on 4 reviews
Rating in categories
Assistant Engineer
149
salaries
| ₹2.1 L/yr - ₹5.8 L/yr |
Engineer
75
salaries
| ₹3.4 L/yr - ₹7.5 L/yr |
Assistant Engineer - Civil
63
salaries
| ₹1.9 L/yr - ₹5.5 L/yr |
Senior Engineer
56
salaries
| ₹5 L/yr - ₹9.5 L/yr |
Civil Site Engineer
46
salaries
| ₹2 L/yr - ₹6.3 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem