Upload Button Icon Add office photos

Filter interviews by

Kmv Group QA/QC Civil Engineer Interview Questions and Answers

Updated 12 Jun 2024

Kmv Group QA/QC Civil Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Jun 2023.

Round 1 - Technical 

(2 Questions)

  • Q1. General questions about site QA QC
  • Q2. Concrete trail mix

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Sep 2018. There were 6 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Documents cheked
  • Q2. About your self
  • Q3. QC related disscusion
  • Q4. Field related experince base disscusion and how to imrove our project
  • Q5. Same as round 3 but point out the IS base

Interview Preparation Tips

Round: Resume Shortlist
Experience: 3+ year experince

General Tips: Very good experince and the good skill full staff and disscusion is very useful in my life.So this atmosphere to helpful our field and knowledge.

Thanks
Manish Kumar
Asst.Manager
(QC Civil)
Aarvee associates pvt ltd
Skills: Communication, Body Language, Problem Solving, Leadership, Presentation Skills, Time Management
Duration: 1-4 weeks

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

Interview Questionnaire 

1 Question

  • Q1. Technical question

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. All question based on past work experiences.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare all the past experience challenge and step by step your envolvement.

I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About my work experience & my self
  • Q2. Tell me about your self.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always candidates have good knowledge of relevant work.and be confident about it,interviewrs always seeing your confidence level and skills.

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is the most challenging situation you have been through in your career?

Interview Preparation Tips

Interview preparation tips for other job seekers - To ace an interview you need to be a good listener as much as a good speaker. Try to listen and understand what the interviewer is asking and then reply. Never be in a hurry to answer, take time. If you did not understand what interviewer is asking simply ask him to repeat, pls don't presume anything and answer anything that comes to your mind. Most importantly never fake in an interview just try to be your best...

Interview Questionnaire 

1 Question

  • Q1. Business Ideas

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare properly for Interviews

Kmv Group Interview FAQs

How many rounds are there in Kmv Group QA/QC Civil Engineer interview?
Kmv Group interview process usually has 1 rounds. The most common rounds in the Kmv Group interview process are Technical.
What are the top questions asked in Kmv Group QA/QC Civil Engineer interview?

Some of the top questions asked at the Kmv Group QA/QC Civil Engineer interview -

  1. General questions about site QA...read more
  2. Concrete trail ...read more

Tell us how to improve this page.

Kmv Group QA/QC Civil Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 746 Interviews
Tata Group Interview Questions
4.2
 • 359 Interviews
Adani Group Interview Questions
3.9
 • 188 Interviews
AECOM Interview Questions
4.2
 • 116 Interviews
Apco Infratech Interview Questions
3.7
 • 114 Interviews
View all
Assistant Manager
7 salaries
unlock blur

₹4.1 L/yr - ₹11.1 L/yr

Engineer
6 salaries
unlock blur

₹2.4 L/yr - ₹6.5 L/yr

Assistant Engineer
6 salaries
unlock blur

₹3.1 L/yr - ₹5 L/yr

Civil Site Engineer
5 salaries
unlock blur

₹2.2 L/yr - ₹3 L/yr

Deputy Manager
5 salaries
unlock blur

₹7.5 L/yr - ₹10.5 L/yr

Explore more salaries
Compare Kmv Group with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview