Filter interviews by
I appeared for an interview before Jun 2023.
Top trending discussions
I applied via Naukri.com and was interviewed in Sep 2018. There were 6 interview rounds.
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.
I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
based on 1 interview
Interview experience
Assistant Manager
7
salaries
| ₹4.1 L/yr - ₹11.1 L/yr |
Engineer
6
salaries
| ₹2.4 L/yr - ₹6.5 L/yr |
Assistant Engineer
6
salaries
| ₹3.1 L/yr - ₹5 L/yr |
Civil Site Engineer
5
salaries
| ₹2.2 L/yr - ₹3 L/yr |
Deputy Manager
5
salaries
| ₹7.5 L/yr - ₹10.5 L/yr |
L&T Construction
Simplex Infrastructures
AECOM
L&T Energy Hydrocarbon