Upload Button Icon Add office photos

Filter interviews by

Kmv Group Junior Executive Interview Questions, Process, and Tips

Updated 10 Dec 2023

Kmv Group Junior Executive Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. What is your experience
  • Q2. Why you working here
  • Q3. What is role in your site in old company
  • Q4. What is role & Responsibilty of safety officer
  • Ans. 

    The role of a safety officer is to ensure the implementation and enforcement of safety regulations and procedures in the workplace.

    • Developing and implementing safety policies and procedures

    • Conducting regular safety inspections and audits

    • Identifying and assessing potential hazards and risks

    • Providing safety training and education to employees

    • Investigating accidents and incidents and implementing corrective actions

    • Maintai...

  • Answered by AI
Round 3 - Behavioral 

(17 Questions)

  • Q1. What will be checked in Crane
  • Ans. 

    In a crane, the following aspects are checked: safety features, load capacity, controls, structural integrity, and maintenance records.

    • Safety features such as emergency stop buttons, limit switches, and overload protection are checked.

    • Load capacity is verified to ensure that the crane can handle the intended weight.

    • Controls are inspected to ensure they are functioning properly and are easy to operate.

    • Structural integri...

  • Answered by AI
  • Q2. What will look in scaffolding
  • Ans. 

    Scaffolding is a temporary structure used in construction to support workers and materials.

    • Scaffolding should be sturdy and stable.

    • It should be properly erected and secured.

    • Scaffolding should have guardrails and toeboards to prevent falls.

    • It should be inspected regularly for any damage or defects.

    • Scaffolding should be properly dismantled after use.

  • Answered by AI
  • Q3. What is difference between ELCB & RCCB
  • Ans. 

    ELCB and RCCB are both electrical safety devices, but they differ in terms of their operating principles and applications.

    • ELCB stands for Earth Leakage Circuit Breaker, while RCCB stands for Residual Current Circuit Breaker.

    • ELCB detects leakage current by measuring the difference in current between the live and neutral wires.

    • RCCB detects residual current by comparing the current flowing in the live and neutral wires.

    • EL...

  • Answered by AI
  • Q4. What is precautions taken during excavation work
  • Ans. 

    Precautions taken during excavation work include proper planning, site inspection, protective measures, and trained personnel.

    • Conduct a thorough site inspection to identify any potential hazards or underground utilities.

    • Develop a detailed excavation plan that includes the location of utilities, shoring requirements, and safety measures.

    • Ensure all workers involved in excavation are properly trained and equipped with per...

  • Answered by AI
  • Q5. What will be checked in full body harness
  • Ans. 

    A full body harness is checked for proper fit, condition, and functionality.

    • Proper fit: The harness should be adjusted to fit the wearer securely and comfortably.

    • Condition: The harness should be inspected for any signs of wear, damage, or deterioration.

    • Functionality: All buckles, straps, and attachment points should be checked to ensure they are in good working order.

    • Examples: Checking the webbing for fraying or tears,...

  • Answered by AI
  • Q6. What is SLI and LTI
  • Ans. 

    SLI stands for Service Level Indicator and LTI stands for Lost Time Injury.

    • SLI is a metric used to measure the performance of a service or system.

    • It helps in monitoring and improving the quality of service provided.

    • LTI refers to any work-related injury that results in time lost from work.

    • It is commonly used in occupational health and safety management.

    • SLI and LTI are important factors in evaluating the efficiency and s

  • Answered by AI
  • Q7. What will be do after a hanging worker on the height
  • Ans. 

    After discovering a hanging worker on a height, immediate action should be taken to ensure their safety and provide medical assistance if needed.

    • Call for emergency medical help

    • Do not attempt to move the worker unless they are in immediate danger

    • If the worker is unconscious, check for signs of breathing and perform CPR if necessary

    • If the worker is conscious, try to keep them calm and reassure them until medical help arr...

  • Answered by AI
  • Q8. What type of fire extinguisher will install in diesel and petrol room
  • Ans. 

    A dry powder fire extinguisher is suitable for both diesel and petrol rooms.

    • A dry powder fire extinguisher is effective in extinguishing fires caused by flammable liquids like diesel and petrol.

    • It works by smothering the fire and interrupting the chemical reaction.

    • Dry powder fire extinguishers are versatile and can also be used on electrical fires.

    • They are labeled with a blue band and contain a white or pale yellow pow...

  • Answered by AI
  • Q9. What is hazard and precautions in hot work
  • Ans. 

    Hot work hazards include fire, burns, and toxic fumes. Precautions include proper training, fire prevention measures, and personal protective equipment.

    • Hot work involves tasks like welding, cutting, and soldering.

    • Hazards include the risk of fire, burns from hot materials or equipment, and exposure to toxic fumes.

    • Precautions include conducting a hot work permit process, ensuring proper ventilation, and using fire-resist...

  • Answered by AI
  • Q10. What is flash back arrester
  • Ans. 

    A flashback arrester is a safety device used to prevent the backward flow of gases and flames into a gas supply system.

    • Flashback arresters are commonly used in welding and cutting operations to prevent accidents caused by flashback.

    • They work by extinguishing flames and preventing the ignition of flammable gases.

    • Flashback arresters consist of a flame arrestor and a check valve.

    • The flame arrestor is designed to quench fl...

  • Answered by AI
  • Q11. What will be precautions when a gas cutting torch whenever blast
  • Ans. 

    Precautions to take when using a gas cutting torch to prevent blasts.

    • Ensure proper ventilation in the work area to prevent the accumulation of flammable gases.

    • Check for any leaks or damage in the gas cutting torch before use.

    • Use appropriate personal protective equipment (PPE) such as goggles, gloves, and flame-resistant clothing.

    • Keep a fire extinguisher nearby and know how to use it.

    • Avoid cutting near flammable materia...

  • Answered by AI
  • Q12. What type of barricade provide in site
  • Ans. 

    Different types of barricades can be used on a construction site, such as concrete barriers, water-filled barriers, and temporary fencing.

    • Concrete barriers are heavy and sturdy, providing a strong physical barrier.

    • Water-filled barriers are portable and can be easily moved around the site.

    • Temporary fencing can be used to cordon off specific areas or create a perimeter.

    • Other types of barricades may include traffic cones,

  • Answered by AI
  • Q13. What type of hazards & precautions will be taken in confined space
  • Ans. 

    Hazards in confined spaces include lack of oxygen, toxic gases, and physical hazards. Precautions include proper ventilation, gas monitoring, and personal protective equipment.

    • Lack of oxygen is a common hazard in confined spaces. Precautions include testing the air for oxygen levels and using appropriate respiratory protection.

    • Toxic gases can accumulate in confined spaces, posing a serious risk to workers. Precautions ...

  • Answered by AI
  • Q14. What type of training conducted before a worker is working any job
  • Ans. 1) checked a experience and ask some questions related job. 2)safety induction training. 3) work related training 4) TBT conducted daily basis 5) checked machinery before start the job.
  • Answered Anonymously
  • Q15. What is Medical Treatment Case & First Aid Treatment Case
  • Ans. When a treatment has done by MBBS doctor is called medical treatment case & when a treatment has done by first aider is called fist aid treatment case
  • Answered Anonymously
  • Q16. Who must be participating in accident investigation
  • Ans. Site safety team+ Area head+team related accident (mechanical or electrical or civil engineer)+ Site HR+ Security head
  • Answered Anonymously
  • Q17. How to cancel permit
  • Ans. 

    To cancel a permit, you need to follow the proper procedure and submit a cancellation request.

    • Contact the issuing authority to inquire about the cancellation process.

    • Fill out a cancellation form or write a formal letter requesting the cancellation.

    • Provide necessary information such as permit number, reason for cancellation, and any supporting documents.

    • Submit the cancellation request to the appropriate department or of...

  • Answered by AI

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Campus Placement and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the minimum grade of nominal mix
  • Ans. 

    The minimum grade of nominal mix is M5.

    • The minimum grade of nominal mix is M5, which means the mix has a compressive strength of 5 MPa.

    • Nominal mix is usually used for small scale construction works where quality control is not a major concern.

    • Higher grades like M10, M15, etc., are used for more critical structures.

    • Example: M5 concrete mix contains 1 part cement, 5 parts sand, and 10 parts aggregate.

  • Answered by AI
  • Q2. What is the minimum grade of design mix
  • Ans. 

    The minimum grade of design mix for concrete is M10.

    • The minimum grade of design mix for concrete is M10, which means the concrete mix has a compressive strength of 10 N/mm^2.

    • Higher grades like M15, M20, M25, etc. indicate higher compressive strengths.

    • The grade of design mix is specified by the structural engineer based on the requirements of the project.

    • Different grades of concrete are used for different types of const...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Technical questions

Round 3 - Technical 

(2 Questions)

  • Q1. Technical questions
  • Q2. Felld related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - NA
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Aptitude Test 

English Language MCQs & Aptitude MQC (Easy)

Round 3 - Group Discussion 

Infrastructure, Roadways & Seaways

Round 4 - One-on-one 

(2 Questions)

  • Q1. Technical questions which involves calculation
  • Q2. Practical scenario of estimation & Survey

Interview Preparation Tips

Interview preparation tips for other job seekers - Work on Basic Technical knowledge & some practical Knowledge
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Assignment 

Main question will be on structures bases and finding quantity of shuttering, concrete, and some software like autocad, revit related basic questions

Round 3 - Technical 

(2 Questions)

  • Q1. Learn basic of software tools like autocad,revit and mostly excel
  • Q2. When come to pure cire be prepare with concept of reinforcement,types of curing,density if steel, labouratry test like initial and final setting of cement,slump cone test,many more

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepare before interview regarding your resume, the company background,and technical question
Mostly question will comes related to which type of work the company will deal.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Dec 2022. There were 2 interview rounds.

Round 1 - Assignment 

About any road ways and types of bridges and classification of is codes for building construction

Round 2 - Group Discussion 

About any road ways and classification of turnouts.

Interview Preparation Tips

Topics to prepare for AECOM Junior Engineer interview:
  • Salary
Interview preparation tips for other job seekers - Going to Job and there have safely. Be careful and keep safe.And be strong and be happy.

I applied via Campus Placement and was interviewed in Feb 2022. There were 2 interview rounds.

Round 1 - Aptitude Test 

Easy to moderate

Round 2 - HR 

(6 Questions)

  • Q1. What is your family background?
  • Q2. Where do you see yourself in 5 years?
  • Q3. What are your strengths and weaknesses?
  • Q4. Tell me about yourself.
  • Q5. Interactive sessions.
  • Q6. Are you comfortable working away from home?

Interview Preparation Tips

Interview preparation tips for other job seekers - For fresher's do some extra bit of work apart from your curriculum.

I applied via Company Website and was interviewed in Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - HR 

(5 Questions)

  • Q1. Where do you see yourself in 5 years?
  • Q2. No hbr question no thon
  • Q3. No thing so work site
  • Q4. 2 years experience str
  • Q5. Structure engineer box

Interview Preparation Tips

Interview preparation tips for other job seekers - Work civil site engineer 2years
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. What is estimate coasting
  • Ans. 

    Estimate costing is the process of calculating the approximate cost of a construction project before it begins.

    • Estimate costing involves analyzing the materials, labor, equipment, and other expenses required for a project.

    • It helps in determining the budget and feasibility of a project.

    • Estimate costing can be done using software like CostX, Bluebeam, or manually by experienced engineers.

    • It is important to regularly upda...

  • Answered by AI
  • Q2. What is land surveying
  • Ans. 

    Land surveying is the process of accurately determining and measuring the position of points on the Earth's surface.

    • Involves measuring distances, angles, and elevations

    • Used in construction, mapping, and boundary determination

    • Utilizes tools such as total stations, GPS, and levels

    • Creates maps, plans, and legal documents for land use

  • Answered by AI
  • Q3. What is the means of PWD department
  • Ans. 

    PWD department stands for Public Works Department, responsible for construction and maintenance of public infrastructure.

    • PWD department is a government organization responsible for the construction and maintenance of public infrastructure such as roads, bridges, buildings, and water supply systems.

    • It plays a crucial role in ensuring the safety and functionality of public infrastructure for the benefit of the community.

    • ...

  • Answered by AI
  • Q4. How many bricks in one quivick
  • Ans. 

    One quivick is equivalent to 500 bricks.

    • One quivick is equal to 500 bricks.

    • A quivick is a unit of measurement used in construction to estimate the number of bricks needed for a project.

    • For example, if a project requires 2000 bricks, it would be equivalent to 4 quivicks.

  • Answered by AI
  • Q5. How many types of cement
  • Ans. 

    There are several types of cement used in construction, each with different properties and applications.

    • There are different types of cement such as Portland cement, rapid hardening cement, white cement, etc.

    • Each type of cement has specific properties and is used for different purposes in construction.

    • For example, Portland cement is commonly used for general construction purposes, while rapid hardening cement is used fo...

  • Answered by AI
  • Q6. What is good quality of cement
  • Ans. 

    Good quality cement should have high strength, low heat of hydration, and minimal impurities.

    • High compressive strength

    • Low heat of hydration to prevent cracking

    • Minimal impurities like excess lime or magnesium oxide

    • Consistent fineness and setting time

    • Should meet relevant standards like ASTM C150 or IS 269

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Construction Junior Engineer Civil interview:
  • Building materials

I applied via Company Website and was interviewed in Jan 2022. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. Tell me about yourself.

Interview Preparation Tips

Topics to prepare for L&T Energy Hydrocarbon Junior Engineer Civil interview:
  • Civil Engineering
  • Pile Foundation
  • Stone column
  • Steel fabricated
  • Send column
Interview preparation tips for other job seekers - My interview lasted 40 minutes and all the questions were asked. Three people attended this interview for me regarding my work.So after asking all the questions in my interview and writing the answer to it for me

Kmv Group Interview FAQs

How many rounds are there in Kmv Group Junior Executive interview?
Kmv Group interview process usually has 3 rounds. The most common rounds in the Kmv Group interview process are Resume Shortlist, HR and Behavioral.
What are the top questions asked in Kmv Group Junior Executive interview?

Some of the top questions asked at the Kmv Group Junior Executive interview -

  1. What will be precautions when a gas cutting torch whenever bl...read more
  2. What will be do after a hanging worker on the hei...read more
  3. What type of fire extinguisher will install in diesel and petrol r...read more

Tell us how to improve this page.

Kmv Group Junior Executive Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 713 Interviews
Tata Group Interview Questions
4.2
 • 357 Interviews
Adani Group Interview Questions
3.9
 • 177 Interviews
Apco Infratech Interview Questions
3.7
 • 111 Interviews
AECOM Interview Questions
4.3
 • 111 Interviews
View all

Kmv Group Junior Executive Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

3.0

Skill development

3.0

Work-life balance

3.0

Salary

3.0

Job security

3.0

Company culture

3.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
7 salaries
unlock blur

₹4.1 L/yr - ₹11.1 L/yr

Engineer
6 salaries
unlock blur

₹2.4 L/yr - ₹6.5 L/yr

Assistant Engineer
6 salaries
unlock blur

₹3.1 L/yr - ₹5 L/yr

Civil Site Engineer
5 salaries
unlock blur

₹2.2 L/yr - ₹3 L/yr

Deputy Manager
5 salaries
unlock blur

₹7.5 L/yr - ₹10.5 L/yr

Explore more salaries
Compare Kmv Group with

Adani Group

3.9
Compare

Tata Group

4.2
Compare

Reliance Industries

4.0
Compare

Mahindra & Mahindra

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview