Filter interviews by
I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.
Corrosion is the most common problem faced in WHRS boilers.
Corrosion due to high temperatures and acidic gases
Corrosion of tubes and pipes leading to leaks and reduced efficiency
Regular monitoring and maintenance required to prevent corrosion
Use of corrosion-resistant materials and coatings to mitigate the issue
Fluctuation in flue gas temperature can indicate issues with combustion efficiency or equipment malfunction.
Fluctuations may be caused by changes in fuel composition or flow rate.
Improper air-to-fuel ratio can lead to temperature fluctuations.
Malfunctioning sensors or control systems can also cause temperature variations.
Regular monitoring and maintenance can help identify and address issues causing temperature fluctua
Shut down the turbine immediately and inspect the ESV for any leaks or damages.
Shut down the turbine to prevent further damage
Inspect the ESV for any leaks or damages
Check for any blockages in the system causing the water leakage
Contact maintenance team for further assistance
I applied via Apna Jobs and was interviewed in Mar 2024. There were 2 interview rounds.
I am very interested in the job yes we will organic chemistry class
KJS Cement interview questions for popular designations
25 questions related to Market & business development
Basic maths and logical reasoning
I applied via Referral and was interviewed in Jul 2023. There were 3 interview rounds.
A cement flow chart is a visual representation of the process of cement production from raw materials to the final product.
The flow chart typically starts with the extraction of raw materials such as limestone and clay.
The raw materials are then crushed, ground, and mixed to form a raw mix.
The raw mix is heated in a kiln to produce clinker.
The clinker is then ground with gypsum to produce cement.
Finally, the cement is ...
Sweetener of cement is needed to improve workability, reduce water content, and enhance strength and durability.
Improves workability by reducing water demand
Reduces water content in the mix
Enhances strength and durability of the concrete
Helps in achieving desired setting time
Common sweeteners include sugar, calcium lignosulfonate, and polycarboxylate ethers
Cement ki process 10 of cement plant
Cement of types 14 hoti h
Material ko 90 micron tk granding
I applied via Approached by Company and was interviewed in Dec 2023. There were 2 interview rounds.
Subject to account, finance and Taxation.
All related to be work and mechanical engineering
The duration of KJS Cement interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 31 interviews
Interview experience
based on 245 reviews
Rating in categories
Assistant Manager
38
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
36
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Officer
34
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
28
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
25
salaries
| ₹0 L/yr - ₹0 L/yr |
UltraTech Cement
Ambuja Cements
ACC
Shree Cement