I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.
Corrosion is the most common problem faced in WHRS boilers.
Corrosion due to high temperatures and acidic gases
Corrosion of tubes and pipes leading to leaks and reduced efficiency
Regular monitoring and maintenance required to prevent corrosion
Use of corrosion-resistant materials and coatings to mitigate the issue
Fluctuation in flue gas temperature can indicate issues with combustion efficiency or equipment malfunction.
Fluctuations may be caused by changes in fuel composition or flow rate.
Improper air-to-fuel ratio can lead to temperature fluctuations.
Malfunctioning sensors or control systems can also cause temperature variations.
Regular monitoring and maintenance can help identify and address issues causing temperature fluctua
Shut down the turbine immediately and inspect the ESV for any leaks or damages.
Shut down the turbine to prevent further damage
Inspect the ESV for any leaks or damages
Check for any blockages in the system causing the water leakage
Contact maintenance team for further assistance
Top trending discussions
I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.
Maintenance problems and solutions
Equipment breakdowns - regular maintenance checks and repairs
Lack of spare parts - inventory management and ordering in advance
Inefficient processes - process optimization and automation
Safety hazards - regular safety inspections and training
Environmental concerns - proper disposal of hazardous waste
Budget constraints - prioritization and cost-effective solutions
I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.
I appeared for an interview in Jun 2022.
posted on 15 Dec 2023
I appeared for an interview before Feb 2024.
Aptitude questions with main sub questions
Types of cement include Portland cement, white cement, rapid hardening cement, and low heat cement.
Portland cement is the most common type used in construction
White cement is used for architectural purposes
Rapid hardening cement sets quickly
Low heat cement generates less heat during hydration
I appeared for an interview before Mar 2024, where I was asked the following questions.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
38
salaries
| ₹4 L/yr - ₹10 L/yr |
Senior Engineer
36
salaries
| ₹4.1 L/yr - ₹7.8 L/yr |
Assistant Officer
34
salaries
| ₹2 L/yr - ₹4.9 L/yr |
Deputy Manager
28
salaries
| ₹7 L/yr - ₹13.5 L/yr |
Engineer
25
salaries
| ₹3.5 L/yr - ₹6 L/yr |
ACC
Shree Cement
Dalmia Bharat Cement
Nuvoco Vistas