Upload Button Icon Add office photos

Filter interviews by

Kirti Sagar Construction Civil Site Engineer Interview Questions, Process, and Tips

Updated 20 May 2021

Kirti Sagar Construction Civil Site Engineer Interview Experiences

1 interview found

I applied via Referral and was interviewed before May 2020. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. Type of grade of concrete
  • Ans. 

    Grade of concrete refers to its strength and is classified into different types based on its compressive strength.

    • The most commonly used grades of concrete are M20, M25, M30, M35, and M40.

    • The number in the grade represents the compressive strength of the concrete in megapascals (MPa).

    • For example, M20 grade concrete has a compressive strength of 20 MPa.

    • Higher grade concrete is used for structures that require higher str...

  • Answered by AI
  • Q2. RCC nad PCC difference also steel behaviour
  • Ans. 

    RCC and PCC are different types of concrete used in construction. Steel behavior depends on its grade and application.

    • RCC (Reinforced Cement Concrete) contains steel reinforcement bars to increase its strength and durability, while PCC (Plain Cement Concrete) does not.

    • RCC is used in structures that require high strength and load-bearing capacity, such as bridges and high-rise buildings, while PCC is used for non-struct...

  • Answered by AI
  • Q3. How to read steel drawing
  • Ans. 

    Reading steel drawings involves understanding symbols, dimensions, and specifications.

    • Identify the scale and units of measurement

    • Understand the symbols and abbreviations used

    • Read the dimensions and tolerances

    • Note any special instructions or specifications

    • Refer to the legend or key for clarification

    • Practice interpreting drawings to improve proficiency

  • Answered by AI
  • Q4. How to read beam and column schedule
  • Ans. 

    Beam and column schedules are tables that provide information about the dimensions, materials, and placement of structural elements.

    • The schedule typically includes a unique identifier for each beam or column.

    • It also lists the length, width, and height of each element.

    • The schedule may specify the type of material used, such as concrete or steel.

    • It may also indicate the location of each element within the building.

    • Readin...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good they asked only verbal questions

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-

I applied via Campus Placement

Round 1 - Aptitude Test 

Partly technical and partly logical thinking.

Round 2 - Technical 

(1 Question)

  • Q1. Regarding Railway engineering works
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Campus Placement

Round 1 - Technical 

(2 Questions)

  • Q1. What is the overlap
  • Ans. 

    Overlap refers to the area where two or more elements share common space or features.

    • Overlap occurs when two or more elements occupy the same physical space or have common characteristics.

    • In civil engineering, overlap can refer to the area where two construction elements meet, such as overlapping rebar in a concrete structure.

    • Overlap can also occur in surveying when two survey lines intersect or overlap each other.

    • Prop...

  • Answered by AI
  • Q2. Why do you overlap
  • Ans. 

    Overlapping in civil engineering is done to ensure proper continuity and strength in construction.

    • Overlapping is done to ensure continuity of reinforcement bars in concrete structures.

    • It helps in distributing the load evenly and prevents sudden failure.

    • Overlapping also helps in providing the required strength to the structure.

    • Proper overlapping ensures that the structure can withstand various stresses and forces.

    • For ex...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Face to face interview

Round 2 - Technical 

(5 Questions)

  • Q1. What is the BBS and Survey
  • Ans. 

    BBS stands for Bar Bending Schedule and Survey refers to the process of measuring and mapping an area.

    • BBS is a document that provides details of reinforcement cutting length, type, and bending shape for construction.

    • Survey involves measuring and mapping land to determine boundaries, elevations, and other important information.

    • Both BBS and Survey are crucial in the construction industry to ensure accurate and efficient

  • Answered by AI
  • Q2. What is the estimation
  • Ans. 

    Estimation is the process of calculating the quantities and costs of materials, labor, and equipment required for a construction project.

    • Estimation involves determining the quantities of materials needed for a project.

    • It also includes calculating the labor hours required for the project.

    • Estimation considers the costs of equipment and other resources needed for the project.

    • Estimation helps in creating a budget and timel

  • Answered by AI
  • Q3. What is the soil test
  • Ans. 

    Soil test is a process of analyzing the properties of soil to determine its suitability for construction purposes.

    • Soil tests help in determining the strength, permeability, compaction, and other important properties of soil.

    • Different types of soil tests include sieve analysis, moisture content test, proctor compaction test, etc.

    • Results of soil tests help in designing foundations, pavements, retaining walls, and other s...

  • Answered by AI
  • Q4. What is the RCC
  • Ans. 

    RCC stands for Reinforced Cement Concrete, a composite material made of concrete and steel reinforcement.

    • RCC is a versatile construction material used in buildings, bridges, dams, etc.

    • It combines the compressive strength of concrete with the tensile strength of steel reinforcement.

    • RCC elements include beams, columns, slabs, and foundations.

    • Example: RCC beams are used to support the load of the structure and transfer it...

  • Answered by AI
  • Q5. What is the DPR
  • Ans. 

    DPR stands for Detailed Project Report, which is a comprehensive document that outlines the details of a construction project.

    • DPR includes information on project scope, objectives, cost estimates, timelines, resources, and potential risks.

    • It serves as a roadmap for the project, guiding the engineers and stakeholders throughout the construction process.

    • DPR is crucial for obtaining approvals, funding, and ensuring the su...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected

I applied via Company Website

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(6 Questions)

  • Q1. The in - person interviews usually begin with a one on one interview with the hiring manager
  • Ans. Early interviews are typically one on one in person interviews between the application and the hiring manager.
  • Answered Anonymously
  • Q2. Introduce yourself.
  • Ans. 

    I am a Civil Site Engineer with experience in managing construction projects and ensuring their successful completion.

    • I have a Bachelor's degree in Civil Engineering from XYZ University.

    • I have worked on various construction projects, including residential and commercial buildings.

    • I am proficient in using AutoCAD and other design software.

    • I have strong project management skills and can effectively coordinate with contra...

  • Answered by AI
  • Q3. Helps to make the candidate friendly with the environment.
  • Q4. What is safety equipment .use for site.
  • Ans. 

    Safety equipment is used on construction sites to protect workers from potential hazards and accidents.

    • Personal protective equipment (PPE) such as hard hats, safety glasses, and gloves

    • Safety harnesses and fall protection systems for working at heights

    • Earplugs or earmuffs to protect against loud noises

    • Respirators or masks for protection against dust, fumes, or hazardous substances

    • Safety signs and barricades to warn and ...

  • Answered by AI
  • Q5. What are the standards used for plant layout in reference.
  • Ans. 

    Standards for plant layout in civil engineering include OSHA regulations, industry best practices, and client requirements.

    • OSHA regulations set guidelines for safety in plant layout design

    • Industry best practices ensure efficient use of space and resources

    • Client requirements may include specific equipment placement or workflow needs

  • Answered by AI
  • Q6. What we do for shortage of material received.
  • Ans. 

    In case of shortage of material received, we can take the following actions:

    • Contact the supplier to inquire about the shortage and request immediate delivery of the remaining material.

    • Check if there are any alternative suppliers who can provide the required material.

    • Evaluate the possibility of using substitute materials or adjusting the design to accommodate the shortage.

    • Prioritize the use of available material for cri...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Highlight your relevant experience and skills that match the job description.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What is the nominal brick size?
  • Ans. 

    The nominal brick size is typically 90 mm x 90 mm x 90 mm.

    • Nominal brick size is commonly 90 mm x 90 mm x 90 mm.

    • It may vary slightly depending on the country or region.

    • Brick sizes are standardized for construction purposes.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. I B. Tech degree I tunnel work for 4 years work experience I hard work of duty
  • Q2. I waiting for megha engineering and infrastructure
  • Q3. I will b resume send megha engineering and infrastructure and response me
  • Q4. I waiting megha engineering and infrastructure

Interview Preparation Tips

Topics to prepare for Afcons Infrastructure Civil Site Engineer interview:
  • 4 years
Interview preparation tips for other job seekers - I am interested job civil site engineer
Tunnel work
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Aptitude Test 

Online exam 50 marks in VC.

Round 3 - HR 

(2 Questions)

  • Q1. Current job responsibilities, CTC.
  • Q2. Methodology about Finishing work like Tiles work, Paint, False ceiling.

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical knowledge about your branches.
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Sir B.E civil engineer hai Mere job nhi laga DBL company me training deye RE Wall Four lanning of mangalwedh_Solapur section of NH_166 Pkg in the state of Maharashtra
  • Q2. Mere DBL company me job nhi laga

Interview Preparation Tips

Interview preparation tips for other job seekers - Hindi
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Assignment 

Related to auto level and total station one more thing buliding material

Round 2 - HR 

(1 Question)

  • Q1. About the site work

Interview Preparation Tips

Topics to prepare for Nagarjuna Construction Company Civil Site Engineer interview:
  • For leveling

Kirti Sagar Construction Interview FAQs

What are the top questions asked in Kirti Sagar Construction Civil Site Engineer interview?

Some of the top questions asked at the Kirti Sagar Construction Civil Site Engineer interview -

  1. RCC nad PCC difference also steel behavi...read more
  2. How to read beam and column sched...read more
  3. How to read steel draw...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Kirti Sagar Construction interview
Referral
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Kirti Sagar Construction Civil Site Engineer Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

-

Skill development

-

Work-Life balance

-

Salary & Benefits

-

Job Security

-

Company culture

-

Promotions/Appraisal

-

Work Satisfaction

Explore 1 Review and Rating
Accountant
4 salaries
unlock blur

₹3 L/yr - ₹3.6 L/yr

Sales Manager
4 salaries
unlock blur

₹3.6 L/yr - ₹5 L/yr

Accounts Manager
3 salaries
unlock blur

₹2.5 L/yr - ₹3.5 L/yr

Civil Site Engineer
3 salaries
unlock blur

₹2.5 L/yr - ₹2.7 L/yr

Explore more salaries
Compare Kirti Sagar Construction with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

Shapoorji Pallonji Group

4.2
Compare

Punj Lloyd

4.3
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview