i
KEC International
Filter interviews by
CAPA (Corrective and Preventive Action) is implemented after Non-Conformance Report (NCR) is issued and closed to prevent recurrence of similar issues.
Identify root cause of NCR
Develop corrective action plan to address root cause
Implement corrective actions
Monitor effectiveness of corrective actions
Develop preventive action plan to prevent recurrence
Implement preventive actions
Verify effectiveness of preventive actions
Preventive actions after Non-conformance Report (NCR) are crucial for quality assurance in engineering projects.
Investigate the root cause of the NCR to understand why it occurred
Implement corrective actions to address the root cause and prevent recurrence
Update procedures or processes to prevent similar NCRs in the future
Train personnel on the importance of quality control and how to avoid NCRs
Regularly review and mon...
I applied via Naukri.com and was interviewed in Feb 2024. There were 2 interview rounds.
I applied via Referral and was interviewed in Apr 2024. There were 3 interview rounds.
Alphabet, numerical, numbers,Genral awareness,etc
Alphabet,time,calender,train,etc
Missing alphabet, missing number,
Easy , kust want consistency and willingness to trelocate far off places
I would ensure proper planning, communication, and use of technology to effectively manage work in remote locations.
Establish clear communication channels with team members and stakeholders
Utilize project management tools for tracking progress and deadlines
Implement regular check-ins and updates to ensure everyone is on the same page
Consider logistics and transportation challenges when planning work schedules
Leverage t...
KEC International interview questions for popular designations
Get interview-ready with Top KEC International Interview Questions
I have 5 years of experience working as a Pipeline Engineer in the oil and gas industry.
Designed and implemented pipeline systems for transporting oil and gas
Performed regular inspections and maintenance to ensure safety and efficiency
Collaborated with cross-functional teams to troubleshoot and resolve pipeline issues
Utilized software tools for pipeline design and analysis, such as AutoCAD and Pipeline Toolbox
posted on 10 Aug 2023
I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.
I applied via Campus Placement and was interviewed in Aug 2023. There were 3 interview rounds.
Basic aptitude and reasoning
GD about some general topic
SPT stands for Standard Penetration Test, a common in-situ test to determine the relative density of granular soils.
SPT involves driving a split-spoon sampler into the ground using a hammer and counting the number of blows required to penetrate the soil a certain depth.
The results of the SPT test are used to assess the soil's strength and stiffness properties for geotechnical engineering purposes.
SPT values are typical...
Admixtures are materials added to concrete to enhance its properties, while mix refers to the combination of ingredients in concrete.
Admixtures include water-reducing admixtures, air-entraining admixtures, accelerating admixtures, and retarding admixtures.
Mix refers to the combination of cement, water, aggregates, and admixtures in concrete.
Examples of admixtures are plasticizers, superplasticizers, accelerators like c...
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 3 interview rounds.
My overall journey has equipped me with strong skills in managing working capital and tendering processes.
I have successfully managed working capital by implementing efficient cash flow management strategies.
I have experience in analyzing financial statements to identify areas for improvement in working capital management.
I have led tendering processes by developing strong relationships with suppliers and negotiating f...
Top trending discussions
Some of the top questions asked at the KEC International interview -
The duration of KEC International interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 359 interviews
Interview experience
based on 3.7k reviews
Rating in categories
Assistant Manager
661
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
430
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
216
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Engineer
212
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Officer
211
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Sterlite Power
Kalpataru Projects International