Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by KEC International Team. If you also belong to the team, you can get access from here

KEC International Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

KEC International Interview Questions, Process, and Tips

Updated 6 Mar 2025

Top KEC International Interview Questions and Answers

View all 166 questions

KEC International Interview Experiences

Popular Designations

299 interviews found

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(3 Questions)

  • Q1. What is packing supervisor
  • Ans. 

    A packing supervisor is responsible for overseeing the packing process in a warehouse or manufacturing facility.

    • Supervises packing staff to ensure efficient and accurate packing of products

    • Monitors inventory levels and orders packing supplies as needed

    • Ensures compliance with safety regulations and quality standards

    • Trains new packing employees on packing procedures and equipment usage

  • Answered by AI
  • Q2. When you are free job
  • Q3. What is your company policy
  • Ans. 

    Our company policy prioritizes safety, quality, and efficiency in all operations.

    • Safety is our top priority, with strict adherence to safety protocols and regulations.

    • Quality control measures are in place to ensure high standards are met in all projects.

    • Efficiency is emphasized to maximize productivity and meet project deadlines.

    • Regular training and development programs are provided to employees to uphold company stand...

  • Answered by AI

Site Supervisor Interview Questions asked at other Companies

Q1. What are handover process to civil or facillities
View answer (4)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. What is your experience of field.
  • Q2. Formulae for design calculations.
  • Ans. 

    Formulas are essential for design calculations in formwork engineering.

    • Formwork pressure calculation: P = γ * h

    • Formwork design load calculation: W = P * A

    • Formwork lateral pressure calculation: PL = 0.5 * γ * h^2

    • Formwork tie spacing calculation: S = L / n

    • Formwork concrete pressure calculation: Pc = γc * h

    • Formwork vertical load calculation: V = W + Pc

  • Answered by AI
  • Q3. Types of formwork systems and it's capacities & limitations
  • Ans. 

    Formwork systems include timber, steel, and aluminum forms, each with different capacities and limitations.

    • Timber formwork is versatile but has limited reuse and requires skilled labor for assembly.

    • Steel formwork is durable and can be reused multiple times, but is heavy and expensive.

    • Aluminum formwork is lightweight, easy to handle, and can be reused many times, but is costly upfront.

    • Each formwork system has specific l...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - learn basic design calculations and formulae.
Speak steady and boldly with your knowledge.

Formwork Engineer Interview Questions asked at other Companies

Q1. HIRE CHARGES & DEPRECIATION COST OF STEEL FORMWORK MATERIAL
View answer (1)
KEC International Interview Questions and Answers for Freshers
illustration image
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Tell me about your old company

Electrical Site Supervisor Interview Questions asked at other Companies

Q1. What is works of ct, pt iso is Substation
View answer (1)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Working Knowledge
  • Q2. What is gst and c GST S Gst discription
  • Ans. 

    GST stands for Goods and Services Tax, a value-added tax levied on most goods and services sold for domestic consumption.

    • GST is a consumption tax that is imposed on the supply of goods and services in India.

    • It is a comprehensive tax levied on the supply of goods and services at each stage of the supply chain.

    • GST has replaced multiple indirect taxes like VAT, service tax, excise duty, etc.

    • There are three types of GST in...

  • Answered by AI

Commercial Officer Interview Questions asked at other Companies

Q1. Find out first What is the management objective ?
View answer (4)

KEC International interview questions for popular designations

 Assistant Manager

 (12)

 Senior Engineer

 (9)

 Project Engineer

 (8)

 Project Manager

 (6)

 Civil Engineer

 (6)

 Engineering Leadership Trainee

 (6)

 Manager

 (5)

 Safety Officer

 (5)

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Ohe railway electrification
  • Q2. Ohe foundation& mast groutting

Interview Preparation Tips

Interview preparation tips for other job seekers - All ectivitis railway electrification ohe founadyion mast erection,cantilever fabrication contect catenation wiring

OHE Supervisor Interview Questions asked at other Companies

Q1. What is cess level , What is embedded length, what needs to maintain the OHE quality,
View answer (1)

Get interview-ready with Top KEC International Interview Questions

HSE Officer Interview Questions & Answers

user image Md Mushahid

posted on 12 Jul 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Salary discussion
  • Q2. Experience discussion
Round 2 - Technical 

(2 Questions)

  • Q1. HSE policy , risk matrix
  • Q2. ISO 45001:2018, 9001, 14001

HSE Officer Interview Questions asked at other Companies

Q1. What is Critical Lifting (Erection activity) , Tandem Lifting please state its Hazards and Precautions ?
View answer (6)

Jobs at KEC International

View all
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Please tell me about your self
  • Q2. Tell me about your job profile
Round 2 - One-on-one 

(2 Questions)

  • Q1. Tell me about your current profile
  • Q2. Compensation and Notice period.

Accounts Manager Interview Questions asked at other Companies

Q1. Tell me an analysis about how to factor customer or prospects for your product segment
View answer (5)

OHE Engineer Interview Questions & Answers

user image Anonymous

posted on 23 Sep 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. OHE Realated all Question
  • Q2. Planning Related all Question

OHE Engineer Interview Questions asked at other Companies

Q1. what is ohe
View answer (1)

Interview Questions & Answers

user image Anonymous

posted on 11 Sep 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Previous experiences
  • Q2. Reason for leaving current organisation.
  • Ans. 

    Seeking new challenges and growth opportunities.

    • Desire for career advancement

    • Looking for new challenges

    • Seeking better work-life balance

    • Company restructuring or downsizing

    • Relocation to a different city

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Process of variation
  • Ans. 

    Process of variation involves analyzing and managing changes in a system or process.

    • Variation refers to the differences or deviations from a standard or expected value.

    • It is important to identify the sources of variation in order to control and improve processes.

    • Examples of variation include random fluctuations in measurements, changes in environmental conditions, and human error.

    • Statistical tools like control charts a...

  • Answered by AI
  • Q2. Software on which work comfortably
  • Ans. 

    I work comfortably on software like AutoCAD, SolidWorks, and MATLAB.

    • AutoCAD

    • SolidWorks

    • MATLAB

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Understand the job requirement and prepare accordingly,make sure to make habit of using technical terminology while interacting.

Salesman Interview Questions & Answers

user image Anonymous

posted on 20 Jun 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I applied via Campus Placement and was interviewed in May 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Its really tough i mean not raly touch it was easy but not so easy you can say fadh di

Round 2 - Aptitude Test 

8 log ka group group dissertation getting married

Round 3 - One-on-one 

(2 Questions)

  • Q1. I dont remember
  • Q2. Yrr kyu backlog kr rahe ho mujhe kuchh nahi pata

Interview Preparation Tips

Interview preparation tips for other job seekers - Tough

Salesman Interview Questions asked at other Companies

Q1. How can you motivate the customer to buy our products
View answer (9)
Contribute & help others!
anonymous
You can choose to be anonymous

KEC International Interview FAQs

How many rounds are there in KEC International interview?
KEC International interview process usually has 2-3 rounds. The most common rounds in the KEC International interview process are Technical, Resume Shortlist and HR.
How to prepare for KEC International interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at KEC International. The most common topics and skills that interviewers at KEC International expect are Project Management, Transmission Line, Substation, Auditing and EHS.
What are the top questions asked in KEC International interview?

Some of the top questions asked at the KEC International interview -

  1. 8. A critical deliverable which was to be delivered to the C-Suite is way behin...read more
  2. How many manpower requer in 1000 sqmt. For 7 day's slab cycle. How we provide ...read more
  3. 7. A vendor is very rigid with a change. The change entails a crucial aspect of...read more
How long is the KEC International interview process?

The duration of KEC International interview process can vary, but typically it takes about less than 2 weeks to complete.

Recently Viewed

JOBS

Browse jobs

Discover jobs you love

COMPANY BENEFITS

KNR Constructions

20 benefits

COMPANY BENEFITS

IRB Infrastructure

60 benefits

COMPANY BENEFITS

Dilip Buildcon

304 benefits

COMPANY BENEFITS

Dilip Buildcon

304 benefits

INTERVIEWS

ICA Edu Skills

No Interviews

JOBS

Maxtic Environmental

No Jobs

INTERVIEWS

ICA Edu Skills

No Interviews

INTERVIEWS

ICA Edu Skills

No Interviews

INTERVIEWS

Sadbhav Engineering

No Interviews

Tell us how to improve this page.

KEC International Interview Process

based on 359 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 426 Interviews
Siemens Interview Questions
4.1
 • 418 Interviews
Thermax Limited Interview Questions
4.1
 • 251 Interviews
ABB Interview Questions
4.1
 • 235 Interviews
BHEL Interview Questions
4.1
 • 113 Interviews
Sterlite Power Interview Questions
4.0
 • 25 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

KEC International Reviews and Ratings

based on 3.7k reviews

4.0/5

Rating in categories

3.8

Skill development

3.8

Work-life balance

3.9

Salary

4.1

Job security

3.8

Company culture

3.3

Promotions

3.7

Work satisfaction

Explore 3.7k Reviews and Ratings
Tendering Officer/ Tendering Manager

Mumbai

5-10 Yrs

Not Disclosed

Sr Manager / Manager - PEB Design

Mumbai

12-20 Yrs

Not Disclosed

Planning Engineer

Saudi arabia,

United arab emirates

7-11 Yrs

Not Disclosed

Explore more jobs
Assistant Manager
661 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
430 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
216 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Engineer
212 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Safety Officer
211 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare KEC International with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Sterlite Power

4.0
Compare

Kalpataru Projects International

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview