Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by KEC International Team. If you also belong to the team, you can get access from here

KEC International Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

KEC International Interview Questions, Process, and Tips

Updated 24 Feb 2025

Top KEC International Interview Questions and Answers

View all 166 questions

KEC International Interview Experiences

Popular Designations

297 interviews found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Self introduction
  • Q2. Job description

Assistant Manager Administrator Interview Questions asked at other Companies

Q1. If someone is repeatedly mailing you about some work, when it will take a stipulated time for that work, then what will you do?
View answer (1)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
-

I applied via Naukri.com and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Tell me about your self in one sentence
Round 2 - Technical 

(3 Questions)

  • Q1. What are the types of formwork
  • Ans. 

    Formwork refers to the temporary or permanent molds used to hold wet concrete until it sets and hardens.

    • Timber formwork: made of wood and commonly used for small to medium-sized projects

    • Steel formwork: made of steel plates and commonly used for large-scale projects

    • Aluminum formwork: made of aluminum panels and commonly used for high-rise buildings

    • Plastic formwork: made of lightweight plastic and commonly used for small...

  • Answered by AI
  • Q2. What kind of formwork system
  • Ans. 

    The formwork system used depends on the specific project requirements and constraints.

    • Different types of formwork systems include traditional timber formwork, steel formwork, aluminum formwork, and modular formwork.

    • Traditional timber formwork is commonly used for small-scale projects and is cost-effective.

    • Steel formwork is durable and suitable for large-scale projects with repetitive structures.

    • Aluminum formwork is lig...

  • Answered by AI
  • Q3. What is load bearing cuplock
  • Ans. 

    Load bearing cuplock is a type of scaffolding system used in construction to support heavy loads.

    • Load bearing cuplock is a versatile and efficient scaffolding system.

    • It consists of vertical standards with cup joints and horizontal ledgers that are connected using captive wedges.

    • The cup joints allow for quick and easy assembly and disassembly of the system.

    • Load bearing cuplock can support heavy loads and is commonly use...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Now keep patience any company want to ability for doing work on site

Formwork Engineer Interview Questions asked at other Companies

Q1. HIRE CHARGES & DEPRECIATION COST OF STEEL FORMWORK MATERIAL
View answer (1)

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 15 Nov 2023

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Concrete workebility test
  • Ans. 

    Slamp test , concrete me water ki matra kitni honi chiye esse pta krte hai or ye concrete ki strength pr kafi effective hota hai.

  • Answered Anonymously
  • Q2. Concrete strength
  • Q3. Suttring work .safety working at site
  • Q4. Gas pipeline work
  • Ans. 

    Gas pipeline work involves the installation, maintenance, and repair of pipelines for the transportation of natural gas.

    • Gas pipeline work requires knowledge of pipeline design, construction, and safety regulations.

    • Engineers must ensure proper installation and maintenance to prevent leaks and ensure efficient gas transportation.

    • Examples of gas pipeline work include inspecting pipelines for corrosion, repairing leaks, an...

  • Answered by AI
  • Q5. Auto level work at site

Interview Preparation Tips

Interview preparation tips for other job seekers - Honestly work done

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (2)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Rate of different dia of Coupler?
  • Ans. 

    The rate of different diameters of couplers can vary based on the specific type and manufacturer.

    • The rate of different diameters of couplers can depend on factors such as material, quality, and brand.

    • Some common diameters for couplers include 1/2 inch, 3/4 inch, and 1 inch.

    • Rates may also vary based on the intended use of the coupler, such as for plumbing or electrical connections.

  • Answered by AI
  • Q2. Rate of threading dia wise?
  • Ans. 

    Rate of threading varies based on the diameter of the thread.

    • The rate of threading increases with larger thread diameters.

    • Smaller thread diameters require slower threading rates to prevent damage.

    • Factors such as material type and cutting tool also impact threading rate.

    • For example, a 1/4 inch thread may have a different threading rate than a 1 inch thread.

  • Answered by AI

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (57)

KEC International interview questions for popular designations

 Assistant Manager

 (12)

 Senior Engineer

 (9)

 Project Engineer

 (8)

 Civil Engineer

 (6)

 Engineering Leadership Trainee

 (6)

 Project Manager

 (6)

 Manager

 (5)

 Quality Engineer

 (5)

Engineer Civil Engineer execution Interview Questions & Answers

user image Anonymous

posted on 13 Jul 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Nothing more.it was just 15 mins interview about my knowledge.

Round 2 - HR 

(2 Questions)

  • Q1. What is my current salary
  • Q2. What is my expectations

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice company to join

Get interview-ready with Top KEC International Interview Questions

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Work related for technical questions
  • Q2. Growth the achievement

Electrical Project Engineer Interview Questions asked at other Companies

Q1. What is important factors in cable calculation? Types of communication used in Automation industry & its length limitations, What is difference between Analog input 4-20mA & analog input (0-10v). Dg synch control panel & it's wo... read more
View answer (1)

Jobs at KEC International

View all
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I applied via Recruitment Consulltant

Round 1 - Technical 

(1 Question)

  • Q1. Previous job profile
  • Ans. 

    I have experience working as a Procurement Engineer in a manufacturing company.

    • Managed procurement activities for raw materials, equipment, and services

    • Negotiated with suppliers to secure favorable terms and pricing

    • Ensured timely delivery of materials to meet production schedules

    • Collaborated with internal teams to identify procurement needs and specifications

    • Implemented cost-saving strategies and vendor management tech

  • Answered by AI

Procurement Engineer Interview Questions asked at other Companies

Q1. What is the good way to manage component cost in changing market in terms of material cost
View answer (2)
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. What is the job profile in previous company
  • Ans. 

    In my previous company, the job profile involved managing procurement activities, vendor negotiations, contract management, and ensuring timely delivery of goods and services.

    • Managed procurement activities such as sourcing, purchasing, and inventory management

    • Negotiated with vendors to secure favorable terms and pricing

    • Handled contract management and compliance with procurement policies

    • Ensured timely delivery of goods

  • Answered by AI
  • Q2. Why you are looking for change
  • Ans. 

    Seeking new challenges and growth opportunities in a dynamic environment.

    • Desire for professional growth and development

    • Interest in exploring new industries or sectors

    • Seeking a more challenging role

    • Looking for a change in work environment or company culture

  • Answered by AI
Round 2 - One-on-one 

(1 Question)

  • Q1. All the technical aspects of you job profile

Procurement Associate Interview Questions asked at other Companies

Q1. Normal what I have done in my past experiences. What is P2P cycle. What do you understand by catalogue.
View answer (1)
Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Nov 2023. There were 4 interview rounds.

Round 1 - Group Discussion 

HSE policy, Hira, jsa, bocw

Round 2 - HR 

(1 Question)

  • Q1. Salary discussion
Round 3 - Technical 

(1 Question)

  • Q1. Factory act, etc
Round 4 - Technical 

(1 Question)

  • Q1. Electrical safety, roof safety, etc

Safety Officer Interview Questions asked at other Companies

Q1. If you don't have any safety equipment and documents how to complete the work ?
View answer (17)

Engineer Projects QAQC Interview Questions & Answers

user image Chaman Lal Pandotra

posted on 8 Nov 2023

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Technical questions
  • Q2. NCR and action after
  • Q3. CAPA after NCR and closer
  • Ans. 

    CAPA (Corrective and Preventive Action) is implemented after Non-Conformance Report (NCR) is issued and closed to prevent recurrence of similar issues.

    • Identify root cause of NCR

    • Develop corrective action plan to address root cause

    • Implement corrective actions

    • Monitor effectiveness of corrective actions

    • Develop preventive action plan to prevent recurrence

    • Implement preventive actions

    • Verify effectiveness of preventive actions

  • Answered by AI
  • Q4. Preventive action after NcR
  • Ans. 

    Preventive actions after Non-conformance Report (NCR) are crucial for quality assurance in engineering projects.

    • Investigate the root cause of the NCR to understand why it occurred

    • Implement corrective actions to address the root cause and prevent recurrence

    • Update procedures or processes to prevent similar NCRs in the future

    • Train personnel on the importance of quality control and how to avoid NCRs

    • Regularly review and mon...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Salary and position

Interview Preparation Tips

Topics to prepare for KEC International Engineer Projects QAQC interview:
  • Core field

KEC International Interview FAQs

How many rounds are there in KEC International interview?
KEC International interview process usually has 2-3 rounds. The most common rounds in the KEC International interview process are Technical, Resume Shortlist and HR.
How to prepare for KEC International interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at KEC International. The most common topics and skills that interviewers at KEC International expect are Project Management, Transmission Line, Substation, Auditing and EHS.
What are the top questions asked in KEC International interview?

Some of the top questions asked at the KEC International interview -

  1. 8. A critical deliverable which was to be delivered to the C-Suite is way behin...read more
  2. How many manpower requer in 1000 sqmt. For 7 day's slab cycle. How we provide ...read more
  3. 7. A vendor is very rigid with a change. The change entails a crucial aspect of...read more
How long is the KEC International interview process?

The duration of KEC International interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

KEC International Interview Process

based on 354 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

Larsen & Toubro Limited Interview Questions
4.0
 • 1.4k Interviews
Siemens Interview Questions
4.1
 • 430 Interviews
Tata Projects Interview Questions
4.2
 • 422 Interviews
Thermax Limited Interview Questions
4.2
 • 247 Interviews
ABB Interview Questions
4.1
 • 231 Interviews
BHEL Interview Questions
4.1
 • 109 Interviews
Sterlite Power Interview Questions
4.0
 • 25 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

KEC International Reviews and Ratings

based on 3.7k reviews

4.0/5

Rating in categories

3.8

Skill development

3.8

Work-life balance

3.9

Salary

4.1

Job security

3.8

Company culture

3.3

Promotions

3.7

Work satisfaction

Explore 3.7k Reviews and Ratings
Tendering Officer/ Tendering Manager

Mumbai

5-10 Yrs

Not Disclosed

Sr Manager / Manager - PEB Design

Mumbai

12-20 Yrs

Not Disclosed

Planning Engineer

Saudi arabia,

United arab emirates

7-11 Yrs

Not Disclosed

Explore more jobs
Assistant Manager
662 salaries
unlock blur

â‚ą5.2 L/yr - â‚ą21.9 L/yr

Senior Engineer
430 salaries
unlock blur

â‚ą4.3 L/yr - â‚ą13 L/yr

Civil Engineer
216 salaries
unlock blur

â‚ą2.4 L/yr - â‚ą9.1 L/yr

Project Engineer
215 salaries
unlock blur

â‚ą2.6 L/yr - â‚ą11 L/yr

Safety Officer
188 salaries
unlock blur

â‚ą1.8 L/yr - â‚ą7.6 L/yr

Explore more salaries
Compare KEC International with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Sterlite Power

4.0
Compare

Kalpataru Projects International

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview