i
KEC International
Filter interviews by
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Formulas are essential for design calculations in formwork engineering.
Formwork pressure calculation: P = γ * h
Formwork design load calculation: W = P * A
Formwork lateral pressure calculation: PL = 0.5 * γ * h^2
Formwork tie spacing calculation: S = L / n
Formwork concrete pressure calculation: Pc = γc * h
Formwork vertical load calculation: V = W + Pc
Formwork systems include timber, steel, and aluminum forms, each with different capacities and limitations.
Timber formwork is versatile but has limited reuse and requires skilled labor for assembly.
Steel formwork is durable and can be reused multiple times, but is heavy and expensive.
Aluminum formwork is lightweight, easy to handle, and can be reused many times, but is costly upfront.
Each formwork system has specific l...
I applied via Naukri.com and was interviewed in Dec 2023. There were 2 interview rounds.
Formwork refers to the temporary or permanent molds used to hold wet concrete until it sets and hardens.
Timber formwork: made of wood and commonly used for small to medium-sized projects
Steel formwork: made of steel plates and commonly used for large-scale projects
Aluminum formwork: made of aluminum panels and commonly used for high-rise buildings
Plastic formwork: made of lightweight plastic and commonly used for small...
The formwork system used depends on the specific project requirements and constraints.
Different types of formwork systems include traditional timber formwork, steel formwork, aluminum formwork, and modular formwork.
Traditional timber formwork is commonly used for small-scale projects and is cost-effective.
Steel formwork is durable and suitable for large-scale projects with repetitive structures.
Aluminum formwork is lig...
Load bearing cuplock is a type of scaffolding system used in construction to support heavy loads.
Load bearing cuplock is a versatile and efficient scaffolding system.
It consists of vertical standards with cup joints and horizontal ledgers that are connected using captive wedges.
The cup joints allow for quick and easy assembly and disassembly of the system.
Load bearing cuplock can support heavy loads and is commonly use...
Top trending discussions
I was interviewed in May 2023.
I was interviewed in May 2023.
LNT bahut achcha Company hai ismein main 2001 sal se juda hua hai ismein main bahut kuchh sikha hun unskil se skill se high school mein LNT company safety quality AVN shop Diksha bahut behtar hai aage bhavishya ke liye Arabi LNT ke se judkar main bhi abhi kuchh karna chahta hun LNT se main unskil se high school mein tab aaya hun ise Mera bahut pyar hai isiliye main LNT regular supply job karta hun bhavishya parment ke
LNT se match chhodane nahin chahta hun usmein se main Apartment Banna chahta hun
I am currently located in Los Angeles, California.
Currently residing in Los Angeles, California
Familiar with local construction regulations and practices
Easy access to job sites in the area
Details about work experience
posted on 17 Mar 2023
posted on 27 Aug 2022
I applied via Walk-in and was interviewed in Aug 2022. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.
Interview experience
based on 3 reviews
Rating in categories
Assistant Manager
648
salaries
| ₹5.2 L/yr - ₹18.5 L/yr |
Senior Engineer
424
salaries
| ₹4.3 L/yr - ₹13 L/yr |
Civil Engineer
225
salaries
| ₹1 L/yr - ₹9.5 L/yr |
Project Engineer
215
salaries
| ₹3 L/yr - ₹11 L/yr |
Safety Officer
205
salaries
| ₹2 L/yr - ₹7.8 L/yr |
Larsen & Toubro Limited
Tata Projects
Sterlite Power
Kalpataru Projects International