Kalpataru Projects International Formwork Foreman Interview Questions and Answers

Updated 27 Sep 2022

Kalpataru Projects International Formwork Foreman Interview Experiences

1 interview found

I applied via Walk-in and was interviewed in Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Formwork febrication and precast
  • Ans. Wooden shatter fixing and concrete pouring
  • Answered Anonymously
Round 3 - One-on-one 

(1 Question)

  • Q1. Ms steel shatter fixing and dismeantalling

Interview Preparation Tips

Interview preparation tips for other job seekers - Formwork underpass, bridge, retaining wal
Drainage

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Scaffolding & Shuttering work progress platform, Wall , slab shuttering work scaffolding Shuttering work progress wall cloum slab Wall of work progress in the job Form work Forman Formwork hi nahi horih...
Round 3 - Technical 

(5 Questions)

  • Q1. Four questions hi scaffolding material
  • Q2. Four questions hi for scaffolding material
  • Q3. Shuttering carpenter
  • Q4. Scaffolding material
  • Q5. Shuttering carpenter and 1

Interview Preparation Tips

Interview preparation tips for other job seekers - Shuttering work & scaffolding Forman Formwork
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. What is your experience of field.
  • Q2. Formulae for design calculations.
  • Ans. 

    Formulas are essential for design calculations in formwork engineering.

    • Formwork pressure calculation: P = γ * h

    • Formwork design load calculation: W = P * A

    • Formwork lateral pressure calculation: PL = 0.5 * γ * h^2

    • Formwork tie spacing calculation: S = L / n

    • Formwork concrete pressure calculation: Pc = γc * h

    • Formwork vertical load calculation: V = W + Pc

  • Answered by AI
  • Q3. Types of formwork systems and it's capacities & limitations
  • Ans. 

    Formwork systems include timber, steel, and aluminum forms, each with different capacities and limitations.

    • Timber formwork is versatile but has limited reuse and requires skilled labor for assembly.

    • Steel formwork is durable and can be reused multiple times, but is heavy and expensive.

    • Aluminum formwork is lightweight, easy to handle, and can be reused many times, but is costly upfront.

    • Each formwork system has specific l...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - learn basic design calculations and formulae.
Speak steady and boldly with your knowledge.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Lg and gantry works
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Civil Foreman work 

(6 Questions)

  • Q1. What BBS in contraction
  • Ans. 

    BBS in construction stands for Bar Bending Schedule.

    • BBS is a document that provides details about the reinforcement steel bars used in a construction project.

    • It includes information about the size, shape, quantity, and placement of the bars.

    • BBS helps in estimating the required amount of steel, planning the cutting and bending of bars, and ensuring proper reinforcement in the structure.

    • Example: BBS for a column may spec...

  • Answered by AI
  • Q2. What is mix ratio M 25
  • Ans. 

    Mix ratio M 25 is a concrete mix design that consists of 1 part cement, 1 part fine aggregate, and 2 parts coarse aggregate.

    • M 25 mix ratio is commonly used in construction for structural applications.

    • The mix ratio represents the proportions of different materials used in the concrete mix.

    • For M 25, the ratio is 1:1:2, which means 1 part cement, 1 part fine aggregate (sand), and 2 parts coarse aggregate (stone chips or g...

  • Answered by AI
  • Q3. How many zone in u grider
  • Ans. 

    The number of zones in a u grider varies depending on the specific design and requirements.

    • The number of zones in a u grider can range from 1 to multiple zones.

    • Zones are typically created to divide the grider into sections for better load distribution and structural stability.

    • The number of zones may be determined by factors such as the length and span of the grider, the load it needs to support, and the design specific...

  • Answered by AI
  • Q4. How calculate zone Azone 3,700m B zone 1000ma& C zone remaining in center
  • Ans. 

    To calculate zone A, zone B, and zone C, you need to know the total area and the dimensions of each zone.

    • Determine the total area of the site

    • Calculate the area of zone A by subtracting the combined area of zones B and C from the total area

    • Calculate the area of zone B using the given dimension

    • Calculate the area of zone C by subtracting the area of zone B from the total area

    • Ensure the units of measurement are consistent

  • Answered by AI
  • Q5. How can work in hight
  • Ans. 

    Working at heights requires proper safety measures and equipment.

    • Use appropriate safety harnesses and fall protection systems.

    • Ensure scaffolding and ladders are secure and stable.

    • Follow safety guidelines and regulations.

    • Provide proper training to workers on working at heights.

    • Regularly inspect and maintain equipment and tools.

    • Implement safety barriers and guardrails.

    • Use aerial lifts or platforms for safe access to elev...

  • Answered by AI
  • Q6. How u bihev ur Engeniar
  • Ans. 

    I behave as a civil engineer by being professional, organized, and detail-oriented.

    • I maintain a professional demeanor at all times, treating colleagues and clients with respect.

    • I am organized in my work, keeping track of project timelines, budgets, and resources.

    • I pay attention to details, ensuring accuracy in calculations, measurements, and documentation.

    • I communicate effectively with team members, subcontractors, and...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil foreman concrete & finishing process

Skills evaluated in this interview

I was interviewed in Oct 2021.

Round 1 - Technical 

(1 Question)

  • Q1. Running units me condencer vacuum pump trip hogya toa kya hoga ? Running me pump flow nahiderha hai toa q? Brg pumps & trubine centring kya hai ? Mechanical seal types & use pumps ,,brg type & parts & ...
Round 2 - Technical 

(1 Question)

  • Q1. Brg temperature q badhta hai

Interview Preparation Tips

Interview preparation tips for other job seekers - Parfect riading & clining , any job full details
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Scaffolding & Shuttering work progress platform, Wall , slab shuttering work scaffolding Shuttering work progress wall cloum slab Wall of work progress in the job Form work Forman Formwork hi nahi horih...
Round 3 - Technical 

(5 Questions)

  • Q1. Four questions hi scaffolding material
  • Q2. Four questions hi for scaffolding material
  • Q3. Shuttering carpenter
  • Q4. Scaffolding material
  • Q5. Shuttering carpenter and 1

Interview Preparation Tips

Interview preparation tips for other job seekers - Shuttering work & scaffolding Forman Formwork
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
-

I applied via Naukri.com and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Tell me about your self in one sentence
Round 2 - Technical 

(3 Questions)

  • Q1. What are the types of formwork
  • Ans. 

    Formwork refers to the temporary or permanent molds used to hold wet concrete until it sets and hardens.

    • Timber formwork: made of wood and commonly used for small to medium-sized projects

    • Steel formwork: made of steel plates and commonly used for large-scale projects

    • Aluminum formwork: made of aluminum panels and commonly used for high-rise buildings

    • Plastic formwork: made of lightweight plastic and commonly used for small...

  • Answered by AI
  • Q2. What kind of formwork system
  • Ans. 

    The formwork system used depends on the specific project requirements and constraints.

    • Different types of formwork systems include traditional timber formwork, steel formwork, aluminum formwork, and modular formwork.

    • Traditional timber formwork is commonly used for small-scale projects and is cost-effective.

    • Steel formwork is durable and suitable for large-scale projects with repetitive structures.

    • Aluminum formwork is lig...

  • Answered by AI
  • Q3. What is load bearing cuplock
  • Ans. 

    Load bearing cuplock is a type of scaffolding system used in construction to support heavy loads.

    • Load bearing cuplock is a versatile and efficient scaffolding system.

    • It consists of vertical standards with cup joints and horizontal ledgers that are connected using captive wedges.

    • The cup joints allow for quick and easy assembly and disassembly of the system.

    • Load bearing cuplock can support heavy loads and is commonly use...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Now keep patience any company want to ability for doing work on site

I was interviewed in May 2018.

Interview Questionnaire 

7 Questions

  • Q1. Only construction line
  • Q2. Only my job
  • Q3. What type of your job
  • Q4. How much mm in 1"
  • Ans. 

    There are 25.4 millimeters in 1 inch.

    • 1 inch is equal to 25.4 millimeters.

    • The conversion factor from inches to millimeters is 25.4.

    • To convert inches to millimeters, multiply the number of inches by 25.4.

    • For example, 2 inches is equal to 50.8 millimeters (2 x 25.4).

  • Answered by AI
  • Q5. How much mm in 1mtr
  • Ans. 

    There are 1000 millimeters in 1 meter.

    • 1 meter is equal to 1000 millimeters.

    • The conversion factor from meters to millimeters is 1000.

    • To convert meters to millimeters, multiply the length in meters by 1000.

  • Answered by AI
  • Q6. Construction line
  • Q7. Technical field

Interview Preparation Tips

Round: Resume Shortlist
Experience: Civil foreman

General Tips: Good
Duration: 1-4 weeks
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. It was all About structural question
  • Q2. What do know about ugirder
  • Q3. What is the pour sequence
  • Ans. 

    The pour sequence refers to the order in which concrete is poured into formwork during construction.

    • The pour sequence is determined based on the design requirements, structural considerations, and weather conditions.

    • It is important to follow the pour sequence to ensure proper curing and strength of the concrete.

    • For example, in a multi-story building construction, the pour sequence may start from the bottom floors and w...

  • Answered by AI
Round 3 - One-on-one 

(1 Question)

  • Q1. It was all about structural question
Round 4 - One-on-one 

(1 Question)

  • Q1. What do you know about U-girder
  • Ans. 

    U-girder is a type of precast concrete girder used in bridge construction.

    • U-girders are shaped like the letter 'U' and are commonly used in bridge projects.

    • They are precast off-site and transported to the construction site for installation.

    • U-girders provide structural support and are often used in combination with other bridge components.

    • They are designed to distribute the load of the bridge deck and traffic to the bri

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I is a big opportunity to do job in jkumar company. Management treat us like familyer. There is no mentally Harasment

Kalpataru Projects International Interview FAQs

How many rounds are there in Kalpataru Projects International Formwork Foreman interview?
Kalpataru Projects International interview process usually has 3 rounds. The most common rounds in the Kalpataru Projects International interview process are One-on-one Round and Resume Shortlist.
What are the top questions asked in Kalpataru Projects International Formwork Foreman interview?

Some of the top questions asked at the Kalpataru Projects International Formwork Foreman interview -

  1. Ms steel shatter fixing and dismeantall...read more
  2. Formwork febrication and prec...read more

Tell us how to improve this page.

Kalpataru Projects International Formwork Foreman Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 715 Interviews
Siemens Interview Questions
4.1
 • 427 Interviews
Tata Projects Interview Questions
4.2
 • 413 Interviews
KEC International Interview Questions
4.1
 • 289 Interviews
Tata Technologies Interview Questions
3.6
 • 252 Interviews
ABB Interview Questions
4.1
 • 228 Interviews
Saint-Gobain Interview Questions
4.0
 • 170 Interviews
View all
Kalpataru Projects International Formwork Foreman Salary
based on 6 salaries
₹3.1 L/yr - ₹7.2 L/yr
9% less than the average Formwork Foreman Salary in India
View more details

Kalpataru Projects International Formwork Foreman Reviews and Ratings

based on 5 reviews

4.4/5

Rating in categories

4.4

Skill development

4.4

Work-life balance

4.2

Salary

4.4

Job security

4.4

Company culture

4.0

Promotions

4.4

Work satisfaction

Explore 5 Reviews and Ratings
Deputy Manager
606 salaries
unlock blur

₹5.1 L/yr - ₹18 L/yr

Assistant Manager
524 salaries
unlock blur

₹3.8 L/yr - ₹14.8 L/yr

Senior Engineer
522 salaries
unlock blur

₹3.4 L/yr - ₹10.6 L/yr

Civil Engineer
247 salaries
unlock blur

₹2 L/yr - ₹7.7 L/yr

Manager
242 salaries
unlock blur

₹6.2 L/yr - ₹24 L/yr

Explore more salaries
Compare Kalpataru Projects International with

Sterlite Power

4.0
Compare

Adani Transmission

3.7
Compare

Power Grid Corporation of India

4.4
Compare

Tata Power

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview