i
KEC International
Filter interviews by
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Formulas are essential for design calculations in formwork engineering.
Formwork pressure calculation: P = γ * h
Formwork design load calculation: W = P * A
Formwork lateral pressure calculation: PL = 0.5 * γ * h^2
Formwork tie spacing calculation: S = L / n
Formwork concrete pressure calculation: Pc = γc * h
Formwork vertical load calculation: V = W + Pc
Formwork systems include timber, steel, and aluminum forms, each with different capacities and limitations.
Timber formwork is versatile but has limited reuse and requires skilled labor for assembly.
Steel formwork is durable and can be reused multiple times, but is heavy and expensive.
Aluminum formwork is lightweight, easy to handle, and can be reused many times, but is costly upfront.
Each formwork system has specific l...
I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.
I appeared for an interview in Jan 2025.
I appeared for an interview before Apr 2024, where I was asked the following questions.
Fire extinguishers are classified based on the type of fire they are designed to combat, ensuring effective fire suppression.
Class A: For ordinary combustibles like wood, paper, and cloth.
Class B: For flammable liquids such as gasoline, oil, and grease.
Class C: For electrical fires involving live equipment.
Class D: For combustible metals like magnesium and sodium.
Class K: For cooking oils and fats, commonly found in ki
A PTW, or Permit to Work, is a formal safety document ensuring safe execution of hazardous tasks.
PTW is essential for high-risk activities like hot work, confined space entry, or electrical work.
It outlines specific safety measures and precautions to be taken before starting the work.
Examples include a Hot Work Permit for welding or cutting operations.
The PTW process involves risk assessment, authorization, and communi
A confined space is an area not designed for continuous occupancy, with limited entry and exit, and potential hazards.
Defined by OSHA as having limited means of entry/exit.
Examples include tanks, silos, and underground vaults.
Hazards may include toxic gases, low oxygen, or engulfment risks.
Proper training and equipment are essential for safety.
Permit-required confined spaces need specific safety protocols.
JSA, or Job Safety Analysis, is a process to identify hazards and implement controls for safe job performance.
JSA involves breaking down a job into steps to identify potential hazards.
It helps in developing safe work procedures and training workers.
For example, a JSA for a construction site might identify fall hazards when working at heights.
JSAs are often used in industries like construction, manufacturing, and oil &a
ISO stands for International Organization for Standardization, which develops and publishes international standards.
Founded in 1947, ISO is an independent, non-governmental international organization.
ISO standards cover various fields, including quality management (ISO 9001) and environmental management (ISO 14001).
ISO standards help ensure safety, efficiency, and interoperability of products and services globally.
ISO ...
Implementing safety precautions for working at heights is crucial to prevent accidents and ensure worker safety.
Use proper personal protective equipment (PPE) such as harnesses and helmets.
Ensure all ladders and scaffolding are stable and inspected before use.
Implement fall protection systems like guardrails or safety nets.
Conduct regular safety training sessions for workers on height safety.
Establish a rescue plan in
Hot work safety precautions ensure a safe environment during activities like welding, cutting, or grinding to prevent fires and injuries.
Conduct a hot work permit process to assess risks before starting any hot work.
Ensure the work area is free of flammable materials; for example, remove or cover combustibles.
Use fire-resistant barriers or shields to protect nearby areas from sparks and heat.
Have fire extinguishing equ...
KEC International interview questions for popular designations
I applied via Naukri.com and was interviewed before Dec 2021. There were 2 interview rounds.
Get interview-ready with Top KEC International Interview Questions
I applied via Approached by Company
I appeared for an interview in Feb 2025.
My best experience as a Wireman Technician involved troubleshooting complex electrical issues and successfully completing a major project.
Successfully diagnosed and repaired a faulty wiring system in a commercial building, improving safety and efficiency.
Led a team in installing a new electrical system for a large residential project, ensuring compliance with local codes.
Implemented preventive maintenance schedules tha...
Understanding the principles behind electrical systems helps troubleshoot and maintain equipment effectively.
Electrical circuits operate on Ohm's Law, which states V=IR (Voltage = Current x Resistance).
Understanding AC vs. DC current is crucial; AC is used in homes, while DC is common in batteries.
Fuses and circuit breakers protect circuits from overloads by interrupting the flow of electricity.
Grounding is essential f...
C6h12o6 what's this is
Auxin is a plant hormone that regulates growth and development.
Auxin is responsible for cell elongation and division in plants.
It plays a role in phototropism, gravitropism, and apical dominance.
Examples of auxin include indole-3-acetic acid (IAA) and synthetic auxins like 2,4-D.
A construction site management system coordinates resources, schedules, and safety protocols to ensure efficient project execution.
Facilitates project planning and scheduling, e.g., Gantt charts for timeline management.
Tracks resource allocation, such as labor, materials, and equipment.
Enhances communication among stakeholders, including contractors, subcontractors, and clients.
Implements safety management protocols to...
Estimation and cost analysis in construction involves assessing project costs and resources for effective budgeting and planning.
Define project scope: Clearly outline the project's objectives and deliverables.
Gather historical data: Use past project costs as a benchmark for estimation.
Break down tasks: Divide the project into smaller tasks for detailed cost analysis.
Estimate costs: Calculate direct and indirect costs, ...
Effective team leadership in construction involves communication, motivation, and conflict resolution to achieve project goals.
Clear Communication: Ensuring all team members understand project goals and their roles. For example, holding regular briefings.
Motivation: Encouraging team members through recognition and support. For instance, celebrating milestones to boost morale.
Conflict Resolution: Addressing disputes pro...
Top trending discussions
Some of the top questions asked at the KEC International interview -
The duration of KEC International interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 379 interviews
Interview experience
based on 3.8k reviews
Rating in categories
Assistant Manager
659
salaries
| ₹5.2 L/yr - ₹21.9 L/yr |
Senior Engineer
449
salaries
| ₹4.3 L/yr - ₹14 L/yr |
Civil Engineer
221
salaries
| ₹2.4 L/yr - ₹9 L/yr |
Safety Officer
191
salaries
| ₹1.8 L/yr - ₹8 L/yr |
Project Manager
186
salaries
| ₹10.9 L/yr - ₹40 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Kalpataru Projects International