i
Karkhana.io
Filter interviews by
The assignemnt was easy, a basic todo app.
I was interviewed before Feb 2024.
I am motivated to join Karkhana because of their innovative projects and collaborative work environment.
Exciting projects at Karkhana
Collaborative work environment
Opportunities for growth and learning
Karkhana.io interview questions for popular designations
Applied for Manager - Manufacturing Operations role due to relevant experience and liking the job description.
Have relevant experience in managing manufacturing operations
Liked the job description as it aligns with my career goals
Previous job ended due to company downsizing
Gap in resume due to personal reasons but utilized the time to upskill
Experienced manufacturing operations manager with a passion for process improvement and team development.
In five years, I see myself leading a successful team and implementing innovative solutions to improve efficiency and productivity.
I want to work in this area of manufacturing because I enjoy the challenge of optimizing processes and seeing tangible results.
I am motivated to work hard by the satisfaction of achievin...
Worked with a colleague of different personality
Collaborated with a colleague who was very detail-oriented while I am more big-picture focused
We established clear communication channels and set expectations for each other's roles and responsibilities
I learned to appreciate their attention to detail and they learned to trust my ability to see the bigger picture
Together, we successfully completed a project within the giv
I applied via Approached by Company and was interviewed in Feb 2022. There were 3 interview rounds.
I applied via Internshala and was interviewed in Dec 2021. There were 3 interview rounds.
Normal reasoning and aptitude question similar to what you find in google
Top trending discussions
Probability of a horse going out of a chessboard in 'n' steps.
The total number of possible moves for a horse is 8.
The probability of going out of the board depends on the position of the horse.
For example, if the horse is at a corner, the probability of going out of the board is higher.
The probability can be calculated using combinatorics and geometry.
I applied via Campus Placement
I am an avid traveler and have visited over 20 countries
I love experiencing new cultures and trying new foods
I have backpacked through Europe and Asia
I have volunteered in orphanages in Cambodia and Nepal
Mobile advertising platform
Adtech
Mobile marketing
App monetization
Maximum sub sequence sum in an array
Use Kadane's algorithm
Initialize max_so_far and max_ending_here to 0
Iterate through the array and update max_ending_here and max_so_far
Return max_so_far
Endianness refers to the byte order of a system. It determines how multi-byte data types are stored in memory.
Little-endian systems store the least significant byte first, while big-endian systems store the most significant byte first.
Endianness can affect the way data is transmitted between systems.
To determine the endianness of a system, you can use the byte order mark (BOM) or write a test program that checks the by...
Sort an array of 0's and 1's only.
Use two pointers, one at the beginning and one at the end of the array.
Swap 0's from the beginning with 1's from the end until the pointers meet.
Alternatively, use a counting sort algorithm to count the number of 0's and 1's and then reconstruct the array.
Heaps are data structures used to efficiently find the maximum or minimum element in a collection.
Max heap: parent nodes are always greater than or equal to child nodes
Min heap: parent nodes are always smaller than or equal to child nodes
Heaps are commonly used in priority queues and sorting algorithms
Heap operations include insert, delete, and extract max/min
Example: An array [3, 8, 2, 5, 1, 4, 6] can be represented a
Find 3 numbers in an array where a+b=c.
Loop through the array and check for all possible combinations of a and b.
Use a hash table to store the values of a and b, and check if c is present in the hash table.
Sort the array and use two pointers to find a and b, and then check if their sum equals c.
based on 5 interviews
Interview experience
based on 23 reviews
Rating in categories
10-15 Yrs
Not Disclosed
Quality Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Sourcing Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Technical Sales Manager
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Program Manager
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Razorpay
Zoho
Freshworks
InMobi