Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
No response

I was interviewed in Feb 2025.

Round 1 - Technical 

(3 Questions)

  • Q1. Tell me about yourself?
  • Q2. Different types of starters?
  • Ans. 

    Different types of starters include DOL starter, star-delta starter, auto transformer starter, and soft starter.

    • Direct Online (DOL) starter: provides full voltage to the motor at start

    • Star-delta starter: reduces the starting current by initially connecting the motor in star configuration and then switching to delta

    • Auto transformer starter: uses an auto transformer to reduce the voltage during starting

    • Soft starter: grad...

  • Answered by AI
  • Q3. Details of A,B,C & D type switchgears?
  • Ans. 

    A,B,C & D type switchgears are different classifications based on their design and application in electrical systems.

    • A type switchgears are suitable for low voltage applications

    • B type switchgears are designed for medium voltage applications

    • C type switchgears are used for high voltage applications

    • D type switchgears are specifically designed for extra high voltage applications

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please study resume properly.

Top Trimasys Control Solutions Electrical Design Engineer Interview Questions and Answers

Q1. What are the reports we can generate in eplan electric
View answer (1)

Electrical Design Engineer Interview Questions asked at other Companies

Q1. 8.How do we calculate Cabel sizing? Formula for Voltage drop? How do we calculate resistive & Inductive drop? Why do we limit voltage drop to 5 percent?
View answer (3)
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Abcdef abcde abcde abcde
Round 2 - Technical 

(1 Question)

  • Q1. Abcde abcde abcde abcde
Round 3 - Behavioral 

(1 Question)

  • Q1. Abcde abcde abcde abcde
Round 4 - HR 

(1 Question)

  • Q1. Abcde abcde abcde abcde

Interview Preparation Tips

Interview preparation tips for other job seekers - One needs to be patient and they will share all infor abt their company culture and policies. However i was called 3 times to facd jntervw as interviewer were not thr

Project Engineer Interview Questions asked at other Companies

Q1. Triangle Star Pattern Task Your task is to print a triangle pattern using stars (*) for a given integer N, which represents the number of rows. Input: Integer N (Total number of rows) Output: The triangle pattern printed over N lines Exampl... read more
View answer (11)

Account Executive 1 Interview Questions & Answers

user image Little Things

posted on 10 Jul 2024

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(3 Questions)

  • Q1. Which type of skills you have?
  • Q2. Why you want to work in Accounts domain if you are from Finance?
  • Q3. What is your salary expectation form us?

Account Executive 1 Interview Questions asked at other Companies

Q1. Types of objective in Google AdWords? And how they are helpful in campaign creation? How you define a negative keywords? Total Google AdWords questions
View answer (1)

Project Engineer Interview Questions & Answers

user image srushti nagulwar

posted on 11 May 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Tell me about yourself

Project Engineer Interview Questions asked at other Companies

Q1. Triangle Star Pattern Task Your task is to print a triangle pattern using stars (*) for a given integer N, which represents the number of rows. Input: Integer N (Total number of rows) Output: The triangle pattern printed over N lines Exampl... read more
View answer (11)

Trimasys Control Solutions interview questions for popular designations

 Project Engineer

 (3)

 Electrical Design Engineer

 (3)

 Account Executive 1

 (1)

 System Engineer

 (1)

 Senior Project Engineer

 (1)

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Types of communication protocol
  • Ans. 

    Communication protocols are rules that allow devices to communicate with each other in a network.

    • TCP/IP - Transmission Control Protocol/Internet Protocol

    • HTTP - Hypertext Transfer Protocol

    • FTP - File Transfer Protocol

    • SMTP - Simple Mail Transfer Protocol

    • UDP - User Datagram Protocol

  • Answered by AI

Skills evaluated in this interview

System Engineer Interview Questions asked at other Companies

Q1. Election Winner Determination In an ongoing election between two candidates A and B, there is a queue of voters that includes supporters of A, supporters of B, and neutral voters. Neutral voters have the power to swing the election results ... read more
View answer (9)

I applied via Company Website and was interviewed in Jun 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Explain Honeywell system
  • Ans. 

    Honeywell system is a technology platform that provides automation and control solutions for various industries.

    • Honeywell system offers a range of products and services for building automation, process control, and safety systems.

    • It uses advanced technologies such as artificial intelligence, machine learning, and cloud computing to optimize performance and efficiency.

    • Honeywell system is used in industries such as aeros...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Goo

Senior Project Engineer Interview Questions asked at other Companies

Q1. Types of road:- 1 Flexible pavements .... .. . 2 Rigid pavements Flexible pavement:- embankment thickness 3m,large size soil particles 75mm lumps and cloud. Liquid limit <50% ,plastic limit<25%, swelling and shrnkag<50%, cbr as per... read more
View answer (2)

Interview Questionnaire 

2 Questions

  • Q1. Explain power and control wiring of star delta starter.
  • Ans. 

    Power and control wiring of star delta starter involves connecting the motor to the power supply and control circuit using a specific wiring diagram.

    • Power wiring involves connecting the three-phase power supply to the motor through the main contactor.

    • Control wiring involves connecting the control circuit to the motor through the timer and the star-delta contactor.

    • During starting, the motor is connected in star configur...

  • Answered by AI
  • Q2. PLC information

Top Trimasys Control Solutions Electrical Design Engineer Interview Questions and Answers

Q1. What are the reports we can generate in eplan electric
View answer (1)

Electrical Design Engineer Interview Questions asked at other Companies

Q1. 8.How do we calculate Cabel sizing? Formula for Voltage drop? How do we calculate resistive & Inductive drop? Why do we limit voltage drop to 5 percent?
View answer (3)

I applied via LinkedIn and was interviewed before May 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. What are the Types of Circuit Breakers.
  • Ans. 

    Circuit breakers are of different types based on their voltage levels, construction, and applications.

    • Based on voltage levels: low voltage, medium voltage, and high voltage circuit breakers

    • Based on construction: air circuit breakers, oil circuit breakers, vacuum circuit breakers, and SF6 circuit breakers

    • Based on applications: residential, commercial, and industrial circuit breakers

    • Other types: molded case circuit break...

  • Answered by AI
  • Q2. Draw the Power & Control Circuit of Star Delta Feeder
  • Ans. 

    The Power & Control Circuit of Star Delta Feeder is a common circuit used in electrical engineering.

    • The circuit consists of a power circuit and a control circuit.

    • The power circuit includes a three-phase AC motor, a contactor, and overload relays.

    • The control circuit includes a timer, a contactor, and a push button station.

    • The circuit is used to reduce the starting current of the motor.

    • During starting, the motor is conne...

  • Answered by AI
  • Q3. What are the reports we can generate in eplan electric
  • Ans. 

    Eplan Electric allows generating various reports for electrical design projects.

    • Reports can be generated for bills of materials, cable lists, terminal diagrams, and more.

    • Reports can be customized to include specific information and formatting.

    • Reports can be exported in various file formats, including Excel, PDF, and XML.

    • Reports can be generated for individual pages or for the entire project.

    • Reports can be scheduled to ...

  • Answered by AI
  • Q4. What is mcb & mccb & where its applications
  • Ans. 

    MCB stands for Miniature Circuit Breaker and MCCB stands for Molded Case Circuit Breaker. They are used for electrical protection.

    • MCB is a type of circuit breaker that automatically switches off electrical circuits during abnormal conditions such as overload or short circuit.

    • MCCB is a type of circuit breaker that provides protection against overloads, short circuits, and ground faults.

    • MCBs are commonly used in resident...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confidence at the time of interview. prepare your self as mentioned in resume.Do not hesitated to ask feedback of your interview

Top Trimasys Control Solutions Electrical Design Engineer Interview Questions and Answers

Q1. What are the reports we can generate in eplan electric
View answer (1)

Electrical Design Engineer Interview Questions asked at other Companies

Q1. 8.How do we calculate Cabel sizing? Formula for Voltage drop? How do we calculate resistive & Inductive drop? Why do we limit voltage drop to 5 percent?
View answer (3)

I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Why should we hire you?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Bold, study basic instrumentation, PlC, SCADA, DCS

Project Engineer Interview Questions asked at other Companies

Q1. Triangle Star Pattern Task Your task is to print a triangle pattern using stars (*) for a given integer N, which represents the number of rows. Input: Integer N (Total number of rows) Output: The triangle pattern printed over N lines Exampl... read more
View answer (11)

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Favourite books, family background, strengths, weakness, travelling etc

Trimasys Control Solutions Interview FAQs

How many rounds are there in Trimasys Control Solutions interview?
Trimasys Control Solutions interview process usually has 1-2 rounds. The most common rounds in the Trimasys Control Solutions interview process are Technical, HR and One-on-one Round.
How to prepare for Trimasys Control Solutions interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Trimasys Control Solutions. The most common topics and skills that interviewers at Trimasys Control Solutions expect are PLC, VFD, Automation, Electrical Design and HMI.
What are the top questions asked in Trimasys Control Solutions interview?

Some of the top questions asked at the Trimasys Control Solutions interview -

  1. What are the reports we can generate in eplan elect...read more
  2. what is mcb & mccb & where its applicati...read more
  3. What are the Types of Circuit Breake...read more

Tell us how to improve this page.

Trimasys Control Solutions Interview Process

based on 8 interviews

Interview experience

4.4
  
Good
View more

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 416 Interviews
Johnson Controls Interview Questions
3.5
 • 261 Interviews
ABB Interview Questions
4.1
 • 232 Interviews
Yokogawa Interview Questions
3.7
 • 34 Interviews
View all

Trimasys Control Solutions Reviews and Ratings

based on 64 reviews

4.1/5

Rating in categories

4.1

Skill development

4.1

Work-life balance

3.6

Salary

4.0

Job security

4.1

Company culture

3.6

Promotions

4.2

Work satisfaction

Explore 64 Reviews and Ratings
Project Engineer
50 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

System Engineer
34 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Design Engineer
25 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Electrical Design Engineer
24 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Project Engineer
13 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Trimasys Control Solutions with

Schneider Electric

4.1
Compare

Siemens

4.1
Compare

ABB

4.1
Compare

Honeywell Automation

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview