Filter interviews by
I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 3 interview rounds.
The HR compliance in RA Bill refers to the adherence to the human resources regulations and requirements outlined in the bill.
The RA Bill may include provisions related to employee rights, workplace safety, equal opportunity, and fair employment practices.
HR compliance ensures that organizations follow these regulations to protect the rights and well-being of their employees.
Examples of HR compliance in the RA Bill may...
Top trending discussions
posted on 27 Jun 2022
posted on 20 Dec 2022
I applied via LinkedIn and was interviewed before Dec 2021. There were 3 interview rounds.
posted on 27 Feb 2024
Planning involves creating a detailed timeline and strategy to achieve specific goals or objectives.
Planning involves setting goals and objectives
It includes creating a detailed timeline or schedule
Planning also involves identifying resources needed for the project
It requires analyzing potential risks and developing contingency plans
Regular monitoring and adjustments are essential in planning
I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.
Activities in toilet area include personal hygiene, using the toilet, and cleaning.
Personal hygiene activities such as washing hands, brushing teeth, and showering
Using the toilet for urination and defecation
Cleaning activities such as wiping surfaces, changing toilet paper, and emptying trash
Maintenance tasks like unclogging drains or fixing leaks
Percentage of completion of a project can be calculated using the cost-to-cost method or milestone method.
Calculate %age of completion by comparing actual costs incurred to date with total estimated costs for the project.
Alternatively, %age of completion can be determined by tracking completion of specific project milestones.
Formula for cost-to-cost method: %age of completion = (Actual costs incurred / Total estimated ...
The sequence of tasks involves plumbing work, wall plastering, wall tiling, and flooring.
Start by completing the plumbing work in the walls and floors
Next, apply wall plaster to smoothen the surface
Then, install wall tiles for a decorative finish
Finally, proceed with the flooring installation
I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.
I applied via Company Website and was interviewed in Mar 2023. There were 2 interview rounds.
posted on 27 May 2022
I applied via Referral and was interviewed in Apr 2022. There was 1 interview round.
based on 12 reviews
Rating in categories
Senior Engineer
611
salaries
| ₹3.4 L/yr - ₹10.6 L/yr |
Deputy Manager
591
salaries
| ₹5.2 L/yr - ₹19.5 L/yr |
Assistant Manager
512
salaries
| ₹5 L/yr - ₹14.8 L/yr |
Manager
279
salaries
| ₹6.2 L/yr - ₹24 L/yr |
Civil Engineer
247
salaries
| ₹2 L/yr - ₹7.5 L/yr |
Sterlite Power
Adani Transmission
Power Grid Corporation of India
Tata Power