Upload Button Icon Add office photos

Filter interviews by

Kalinga Commercial Corporation Civil Engineer Interview Questions and Answers

Updated 18 Jun 2024

Kalinga Commercial Corporation Civil Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Structure basics
  • Q2. Overall Drawing questions

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

It about Indian civilization

Round 2 - Aptitude Test 

Easy questions to answer the every question

I applied via Approached by Company and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Tell me about yourself.

Interview Preparation Tips

Topics to prepare for Jindal Aluminium Civil Engineer interview:
  • AutoCAD
Interview preparation tips for other job seekers - Gooďdddddddddddddddddddddddddddddddddd
Interview experience
4
Good
Difficulty level
Easy
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is slump test
  • Ans. 

    Slump test is a method to measure the workability of concrete by determining the consistency and stiffness of the mix.

    • Slump test involves filling a cone-shaped mold with concrete, then removing the mold and measuring how much the concrete slumps or settles.

    • The amount of slump indicates the workability of the concrete mix - higher slump means more workable mix.

    • Slump test helps in ensuring that the concrete mix has the r...

  • Answered by AI
  • Q2. M30 grade concrete ratio
  • Ans. 

    M30 grade concrete ratio is 1:1:2 (cement:sand:aggregate)

    • M30 grade concrete has a ratio of 1:1:2 for cement:sand:aggregate

    • This means for every part of cement, there is an equal part of sand and double the part of aggregate

    • For example, for 1 cubic meter of M30 concrete, you would need 1 part cement, 1 part sand, and 2 parts aggregate

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. What is slum test
  • Ans. 

    Slum test is a method used to assess the quality of concrete by observing the flow of concrete through a standard slump cone.

    • Slump test is performed by filling a slump cone with freshly mixed concrete, then lifting the cone and measuring the amount of slump or settlement of the concrete.

    • The result of the slump test indicates the workability of the concrete mixture, with different slumps corresponding to different level...

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

It about Indian civilization

Round 2 - Aptitude Test 

Easy questions to answer the every question

I applied via Approached by Company and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Tell me about yourself.

Interview Preparation Tips

Topics to prepare for Jindal Aluminium Civil Engineer interview:
  • AutoCAD
Interview preparation tips for other job seekers - Gooďdddddddddddddddddddddddddddddddddd

Kalinga Commercial Corporation Interview FAQs

How many rounds are there in Kalinga Commercial Corporation Civil Engineer interview?
Kalinga Commercial Corporation interview process usually has 1 rounds. The most common rounds in the Kalinga Commercial Corporation interview process are Technical.
What are the top questions asked in Kalinga Commercial Corporation Civil Engineer interview?

Some of the top questions asked at the Kalinga Commercial Corporation Civil Engineer interview -

  1. Overall Drawing questi...read more
  2. Structure bas...read more

Tell us how to improve this page.

Kalinga Commercial Corporation Civil Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Kalinga Commercial Corporation Civil Engineer Salary
based on 6 salaries
₹2.4 L/yr - ₹3.6 L/yr
36% less than the average Civil Engineer Salary in India
View more details

Kalinga Commercial Corporation Civil Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

4.0

Skill development

1.0

Work-life balance

4.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
37 salaries
unlock blur

₹4.1 L/yr - ₹9 L/yr

Mechanical Engineer
23 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

HR Executive
14 salaries
unlock blur

₹2.4 L/yr - ₹5 L/yr

Overman
13 salaries
unlock blur

₹3.4 L/yr - ₹5.2 L/yr

Junior Manager HR
11 salaries
unlock blur

₹3.2 L/yr - ₹4.1 L/yr

Explore more salaries
Compare Kalinga Commercial Corporation with

Aditya Birla Group

4.1
Compare

Reliance Industries

4.0
Compare

Tata Group

4.2
Compare

Adani Group

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview