Updated 12 Oct 2020

Thriveni Earthmovers Civil Engineer Interview Experiences

1 interview found

I applied via Job Portal and was interviewed in Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. First they asked about me, after that some questions on why I would like to join Thriveni.
  • Q2. Next some technical questions about the works I have done, what's my role in that .
  • Q3. Questions on if I join Thriveni, for how long I will be with them
  • Q4. Questions on salary and date of joining

Interview Preparation Tips

Interview preparation tips for other job seekers - Just keep normal and answer what you know best. Don't try to give an impression which you aren't. Tell everything true and may be you'll be able to join Thriveni.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. What is a maximum thickness of slab bar
  • Ans. 

    The maximum thickness of slab bar is typically around 32mm to 40mm.

    • The maximum thickness of slab bar is determined by the design requirements and load capacity of the structure.

    • In general, the maximum thickness of slab bar is around 32mm to 40mm.

    • Thicker slab bars may be used for heavy-duty structures or special design requirements.

  • Answered by AI
  • Q2. What is M25 grade concrete ratio
  • Ans. 

    M25 grade concrete ratio is 1:1:2 (1 part cement, 1 part sand, 2 parts aggregate)

    • M25 grade concrete has a ratio of 1:1:2 for cement, sand, and aggregate respectively

    • This means for every part of cement, there is an equal part of sand and double the part of aggregate

    • For example, for 1 cubic meter of M25 grade concrete, you would need 1 cubic meter of cement, 1 cubic meter of sand, and 2 cubic meters of aggregate

  • Answered by AI
  • Q3. What is maximam diameter of dowel bar ?
  • Ans. 

    The maximum diameter of a dowel bar typically ranges from 1 inch to 2 inches.

    • Typical maximum diameter of dowel bar is 1 inch to 2 inches

    • Dowel bars are commonly used in concrete pavement joints

    • The diameter of dowel bars can vary based on the specific project requirements

  • Answered by AI
  • Q4. What is 1 M3 of cement volume?
  • Ans. 

    1 M3 of cement volume is equivalent to 1440 kg or 1.44 tonnes.

    • 1 M3 of cement volume is equal to 1440 kg or 1.44 tonnes.

    • This volume is commonly used in construction projects to calculate the amount of cement needed.

    • It is important to accurately measure and calculate cement volume to ensure the structural integrity of the project.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Why you are applying for this job?
  • Ans. 

    I am applying for this job because of my passion for managing civil projects and my proven track record of successful project completions.

    • Passion for managing civil projects

    • Proven track record of successful project completions

    • Excited about the opportunity to contribute to impactful infrastructure projects

  • Answered by AI
  • Q2. Why you requested for salary hike?
  • Ans. 

    I requested a salary hike due to increased responsibilities, achievements, and market value.

    • Increased responsibilities in current role

    • Achievements such as successful completion of projects or exceeding targets

    • Market value based on industry standards and experience

    • Cost of living increase or inflation affecting expenses

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Explain about the various stages of construction of the foundation of building.
  • Ans. 

    The various stages of construction of the foundation of a building include site preparation, excavation, foundation design, footing construction, and foundation pouring.

    • Site preparation involves clearing the area and leveling the ground for construction.

    • Excavation is the process of digging a hole in the ground to create space for the foundation.

    • Foundation design is crucial to ensure the building's stability and load-be...

  • Answered by AI
  • Q2. What will be the Design mix for Concrete .
  • Ans. 

    The design mix for concrete is the proportion of various ingredients like cement, sand, aggregates, and water to achieve the desired strength and durability.

    • Design mix is determined based on the required strength and durability of the concrete

    • It involves selecting the right proportions of cement, sand, aggregates, and water

    • Various factors like type of construction, exposure conditions, and desired workability influence...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. What is a maximum thickness of slab bar
  • Ans. 

    The maximum thickness of slab bar is typically around 32mm to 40mm.

    • The maximum thickness of slab bar is determined by the design requirements and load capacity of the structure.

    • In general, the maximum thickness of slab bar is around 32mm to 40mm.

    • Thicker slab bars may be used for heavy-duty structures or special design requirements.

  • Answered by AI
  • Q2. What is M25 grade concrete ratio
  • Ans. 

    M25 grade concrete ratio is 1:1:2 (1 part cement, 1 part sand, 2 parts aggregate)

    • M25 grade concrete has a ratio of 1:1:2 for cement, sand, and aggregate respectively

    • This means for every part of cement, there is an equal part of sand and double the part of aggregate

    • For example, for 1 cubic meter of M25 grade concrete, you would need 1 cubic meter of cement, 1 cubic meter of sand, and 2 cubic meters of aggregate

  • Answered by AI
  • Q3. What is maximam diameter of dowel bar ?
  • Ans. 

    The maximum diameter of a dowel bar typically ranges from 1 inch to 2 inches.

    • Typical maximum diameter of dowel bar is 1 inch to 2 inches

    • Dowel bars are commonly used in concrete pavement joints

    • The diameter of dowel bars can vary based on the specific project requirements

  • Answered by AI
  • Q4. What is 1 M3 of cement volume?
  • Ans. 

    1 M3 of cement volume is equivalent to 1440 kg or 1.44 tonnes.

    • 1 M3 of cement volume is equal to 1440 kg or 1.44 tonnes.

    • This volume is commonly used in construction projects to calculate the amount of cement needed.

    • It is important to accurately measure and calculate cement volume to ensure the structural integrity of the project.

  • Answered by AI
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Tell me about yourself.
Round 3 - Technical 

(2 Questions)

  • Q1. Site related question
  • Q2. Layout bbs structure and building construction work
  • Ans. 

    Layout of BBS structure and building construction work involves planning and execution of reinforcement detailing and construction activities.

    • Prepare detailed bar bending schedules (BBS) for reinforcement detailing

    • Ensure proper placement and alignment of reinforcement bars as per design drawings

    • Supervise construction activities and ensure adherence to quality standards

    • Coordinate with other stakeholders such as architec...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - proper knowledge gane in your field

I applied via Campus Placement and was interviewed before Sep 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Building materials, estimating & casting
  • Q2. Reinforced cement concrete

Interview Preparation Tips

Interview preparation tips for other job seekers - Hindalco is great place to work and most sustainable production metal company

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Steel Interview Questions
4.1
 • 832 Interviews
JSW Steel Interview Questions
3.9
 • 572 Interviews
UltraTech Cement Interview Questions
4.2
 • 543 Interviews
Ambuja Cements Interview Questions
3.9
 • 107 Interviews
Metso Outotec Interview Questions
4.3
 • 65 Interviews
Coal India Interview Questions
4.0
 • 59 Interviews
View all
Thriveni Earthmovers Civil Engineer Salary
based on 6 salaries
₹3.5 L/yr - ₹6.5 L/yr
7% less than the average Civil Engineer Salary in India
View more details
Deputy Engineer
139 salaries
unlock blur

₹2.7 L/yr - ₹5.5 L/yr

Assistant Manager
102 salaries
unlock blur

₹4.6 L/yr - ₹10 L/yr

Mechanical Engineer
90 salaries
unlock blur

₹2 L/yr - ₹8.1 L/yr

Graduate Engineer Trainee (Get)
73 salaries
unlock blur

₹2 L/yr - ₹5 L/yr

Assistant Mines Manager
55 salaries
unlock blur

₹4.2 L/yr - ₹9.2 L/yr

Explore more salaries
Compare Thriveni Earthmovers with

Adani Enterprises

3.8
Compare

Tata Steel

4.1
Compare

Vedanta Limited

3.8
Compare

Hindalco Industries

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview