Filter interviews by
I applied via Approached by Company and was interviewed in May 2023. There were 2 interview rounds.
E & i quality control in the field QMS involves ensuring that all electrical and instrumentation work meets the required quality standards.
Implementing quality control procedures for electrical and instrumentation work in the field
Ensuring compliance with quality management system (QMS) standards
Conducting inspections and tests to verify the quality of work
Documenting and reporting quality control findings
Taking correc...
F&G system is essential for safety in pipeline projects to detect and respond to fire and gas hazards.
F&G system monitors for fire and gas leaks in the pipeline
It includes detectors, alarms, and shutdown systems
The system triggers alarms and initiates emergency shutdown procedures to prevent accidents
Examples of F&G system components: flame detectors, gas detectors, control panels
The wellhead control panel installation and inspection procedure involves several steps to ensure proper functioning and safety.
Ensure all components are securely installed and connected according to manufacturer's guidelines
Check for any signs of damage or wear on the control panel and its components
Verify proper grounding and electrical connections to prevent any safety hazards
Perform functional testing to ensure the...
Top trending discussions
I was interviewed in Jan 2025.
I applied via Naukri.com and was interviewed in Sep 2024. There were 2 interview rounds.
Agile values include individuals and interactions over processes and tools, while Scrum values include commitment, courage, focus, openness, and respect.
Agile values prioritize individuals and interactions over processes and tools
Scrum values include commitment, courage, focus, openness, and respect
Scrum ceremonies include Sprint Planning, Daily Standup, Sprint Review, and Sprint Retrospective
Story points are a unit of...
As a project manager, I prepare various documents such as project plans, schedules, budgets, risk assessments, and progress reports. I contribute by leading the team, managing resources, and ensuring project success.
Prepare project plans outlining scope, objectives, deliverables, and timelines
Create schedules to allocate tasks and track progress
Develop budgets to manage project costs effectively
Conduct risk assessments...
Provide clear expectations, offer support and training, provide feedback and recognition, set goals and milestones.
Clearly communicate expectations and goals to the resource.
Offer support and training to help the resource improve their skills and knowledge.
Provide regular feedback and recognition for progress made.
Set specific goals and milestones to track improvement.
Create a development plan with the resource to addr...
Scrum of Scrums is a scaled agile framework where multiple Scrum teams coordinate their work. PI planning is a key event in SAFe where teams plan their work for the upcoming Program Increment.
Scrum of Scrums involves representatives from each Scrum team meeting regularly to discuss dependencies and progress.
PI planning is a two-day event where teams align on their objectives, dependencies, and priorities for the upcomi...
Sabre Commands to Check Availability
Blocking and Booking Tickets
Commands to Check Fare rules
Checking Availability
Infant and Child title
posted on 31 Jan 2025
I was interviewed in Dec 2024.
I applied via Company Website and was interviewed in Oct 2024. There were 2 interview rounds.
Various machines are used in engineering, depending on the specific task at hand.
Milling machines are used for cutting and shaping solid materials.
Lathe machines are used for shaping metal or wood by rotating the workpiece against a cutting tool.
Drilling machines are used for creating holes in materials.
Grinding machines are used for finishing workpieces by removing excess material.
CNC machines are computer-controlled
Part manufacturers are companies that produce components or parts used in various products.
Part manufacturers specialize in producing specific components or parts.
They often work with engineers to design and create custom parts.
Examples include companies that manufacture screws, gears, circuit boards, etc.
The minimum and maximum tonnage of a machine depends on its type and purpose.
Minimum and maximum tonnage can vary greatly depending on the type of machine (e.g. hydraulic press, injection molding machine)
For example, a hydraulic press may have a minimum tonnage of 10 tons and a maximum tonnage of 500 tons
It is important to consider the intended use of the machine when determining the appropriate tonnage range
I applied via campus placement at Institute of Technology, Banaras Hindu University and was interviewed in Jul 2024. There were 3 interview rounds.
20 questions 40 minutes, 3 type of question easy, medium and hard each of 1, 3 and 5 points respectively, if you answer correct then you move above in difficulty else go down.
Implementing binary search and bubble sort algorithms in Python
Binary search: Divide and conquer algorithm to find a target value in a sorted array
Bubble sort: Iteratively swap adjacent elements if they are in the wrong order
Example for binary search: def binary_search(arr, target):
Example for bubble sort: def bubble_sort(arr):
I applied via Naukri.com and was interviewed in Dec 2024. There was 1 interview round.
posted on 5 Feb 2025
based on 1 interview
Interview experience
based on 37 reviews
Rating in categories
GIS Technician
6
salaries
| ₹8 L/yr - ₹12.5 L/yr |
Electrical Engineer
4
salaries
| ₹12 L/yr - ₹36 L/yr |
Inspector
4
salaries
| ₹7.6 L/yr - ₹10.5 L/yr |
GIS Engineer
4
salaries
| ₹8.5 L/yr - ₹34.2 L/yr |
Electrical Technician
4
salaries
| ₹7.6 L/yr - ₹12 L/yr |
NTPC
Power Grid Corporation of India
Tata Power
Adani Power