Lead Instrumentation Engineer
Lead Instrumentation Engineer Interview Questions and Answers
Q1. Wellhead control panel installation and inspection procedure
The wellhead control panel installation and inspection procedure involves several steps to ensure proper functioning and safety.
Ensure all components are securely installed and connected according to manufacturer's guidelines
Check for any signs of damage or wear on the control panel and its components
Verify proper grounding and electrical connections to prevent any safety hazards
Perform functional testing to ensure the control panel operates correctly
Document the installation...read more
Q2. Field instrumentation working principle Standard and codes using in industry
Field instrumentation measures and controls process variables using sensors and transmitters. Industry standards and codes ensure safety and reliability.
Field instrumentation uses sensors and transmitters to measure and control process variables such as temperature, pressure, flow, and level.
Industry standards and codes ensure safety and reliability of instrumentation systems.
Examples of standards and codes include ISA (International Society of Automation) standards, NEC (Nat...read more
Q3. E & i quality control in the field QMS
E & i quality control in the field QMS involves ensuring that all electrical and instrumentation work meets the required quality standards.
Implementing quality control procedures for electrical and instrumentation work in the field
Ensuring compliance with quality management system (QMS) standards
Conducting inspections and tests to verify the quality of work
Documenting and reporting quality control findings
Taking corrective actions to address any quality issues
Training and sup...read more
Q4. F&G system for Pipe line project
F&G system is essential for safety in pipeline projects to detect and respond to fire and gas hazards.
F&G system monitors for fire and gas leaks in the pipeline
It includes detectors, alarms, and shutdown systems
The system triggers alarms and initiates emergency shutdown procedures to prevent accidents
Examples of F&G system components: flame detectors, gas detectors, control panels
Lead Instrumentation Engineer Jobs
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month