LT stands for Leadership Team.
LT refers to the group of leaders within an organization who make important decisions and set strategic direction.
Members of the LT typically include top executives such as the CEO, CFO, and other key department heads.
The LT is responsible for guiding the overall direction of the company and ensuring that goals are met.
They often meet regularly to discuss performance, challenges, and oppor
I applied via Referral and was interviewed before Jun 2023. There was 1 interview round.
Details about financial data analysis and internal audit process
I applied via Walk-in and was interviewed before Apr 2023. There was 1 interview round.
JSW Cement interview questions for popular designations
I applied via Naukri.com and was interviewed before Jun 2022. There were 5 interview rounds.
Asking about logical reasoning
Get interview-ready with Top JSW Cement Interview Questions
I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.
MCQ's related to Concrete Technology
Various types of cement include Portland cement, white cement, rapid hardening cement, and low heat cement.
Portland cement is the most common type used in construction.
White cement is used for architectural purposes and to create colored concrete.
Rapid hardening cement sets quickly and is used for projects with tight deadlines.
Low heat cement generates less heat during hydration and is used in large concrete structures
Flyash is a byproduct of coal combustion, while GGBFS is a byproduct of iron production. Both are used as supplementary cementitious materials in concrete.
Flyash is a byproduct of coal combustion, while GGBFS is a byproduct of iron production.
Flyash is lighter in color and finer in particle size compared to GGBFS.
GGBFS has higher compressive strength and lower permeability compared to Flyash.
Both materials are used as ...
Minimum grade of concrete for RCC structures in severe conditions is M40.
Minimum grade of concrete for RCC structures in severe conditions is M40
Higher grade of concrete like M50 or M60 may also be used for extra durability
Severe conditions include exposure to aggressive chemicals, high temperatures, or heavy loads
I applied via Referral and was interviewed before Nov 2021. There were 2 interview rounds.
DCS single line diagram is a graphical representation of the electrical system of a plant or facility.
It shows the flow of power from the source to the loads
It includes all the major components of the system such as generators, transformers, switchgear, and motors
It also shows the protective devices such as relays and fuses
It is used by operators and maintenance personnel to understand the system and troubleshoot probl...
I applied via Naukri.com
I applied via Referral and was interviewed in Aug 2021. There were 3 interview rounds.
GGBS stands for Ground Granulated Blast Furnace Slag. Its IS code number is 455:1989.
GGBS is a byproduct of the iron-making industry.
It is obtained by quenching molten iron slag from a blast furnace with water or steam.
GGBS is used as a partial replacement for Portland cement in concrete production.
The IS code number 455:1989 refers to the Indian Standard specification for GGBS.
OPC 53 Specifications are a set of guidelines for the production of high-quality cement.
OPC 53 refers to Ordinary Portland Cement with a minimum compressive strength of 53 MPa.
The specifications outline the chemical composition, physical properties, and performance requirements of OPC 53 cement.
OPC 53 cement is commonly used in construction projects that require high-strength concrete, such as bridges, high-rise buildi...
CTM calibration procedure ensures accurate measurement of critical parameters.
CTM calibration involves adjusting and verifying the accuracy of a CTM (Continuous Monitoring) device.
The procedure typically includes checking the device's sensors, calibrating the display, and comparing measurements with known standards.
Regular calibration is essential to maintain the reliability and precision of CTM readings.
Example: The C...
Top trending discussions
The duration of JSW Cement interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 125 interviews
Interview experience
based on 1k reviews
Rating in categories
Assistant Manager
205
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
165
salaries
| ₹0 L/yr - ₹0 L/yr |
Sales Officer
162
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
124
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Officer
106
salaries
| ₹0 L/yr - ₹0 L/yr |
UltraTech Cement
Ambuja Cements
ACC
Shree Cement