Filter interviews by
I applied via Naukri.com and was interviewed in Aug 2021. There were 2 interview rounds.
Aptitude test of 45 question on physics and chemistry of cement and concrete
Cement work refers to the process of using cement to construct or repair structures.
Cement work involves mixing cement with water and other materials to create a paste.
The paste is then used to bind together bricks, stones, or other building materials.
Cement work can include tasks such as pouring concrete foundations, building walls, or repairing cracks in existing structures.
Examples of cement work include constructin...
I'm sorry, but the question is incomplete. Could you please provide more information?
I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.
The types of packing products in your plant include composite packing, chd packing, and psc packing.
Composite packing is a type of packing material made from multiple layers of different materials for enhanced protection.
Chd packing refers to packing products made from cardboard material.
Psc packing stands for plastic strapping and is used for securing and bundling items together.
Adding flyash to PPC can help improve workability, reduce heat of hydration, and enhance long-term strength.
Flyash can act as a filler material, improving the packing density of the cement paste.
It can also reduce the heat of hydration, making the concrete less prone to cracking.
Flyash can enhance the long-term strength and durability of the concrete.
Proper testing and mix design adjustments may be necessary when addin
I applied via Naukri.com and was interviewed before Jun 2022. There were 2 interview rounds.
IS code of PPC cement is IS 1489 (Part 1): 1991.
IS code for PPC cement is IS 1489 (Part 1): 1991
PPC stands for Portland Pozzolana Cement
PPC cement is a type of cement which is a mixture of Portland cement and pozzolanic materials such as fly ash, calcined clay, etc.
The maximum consumption of slag as per BIS norms in PSC is 50%.
Maximum consumption of slag in PSC as per BIS norms is 50%
Slag content should not exceed 50% in PSC as per BIS standards
JSW Cement interview questions for popular designations
I applied via Referral and was interviewed in Feb 2022. There were 2 interview rounds.
HOD DECIDED MY JOINING
Get interview-ready with Top JSW Cement Interview Questions
I am responsible for the sales in a specific geographical area.
I manage sales activities in my assigned area
I build and maintain relationships with customers in the area
I analyze market trends and competition in the area
I develop strategies to increase sales and meet targets in the area
I have 2 years of experience in sales, including prospecting, cold calling, and closing deals.
2 years of experience in sales
Proficient in prospecting and identifying potential clients
Skilled in cold calling and building relationships with prospects
Proven track record of closing deals and meeting sales targets
Strong communication and negotiation skills
Familiarity with CRM software and sales tools
Ability to adapt to diff
CWMS stands for Contractor Workmen Management System.
CWMS is a software system used to manage and track the work of contractors and their employees.
It helps in maintaining records of the contractor's workmen, their attendance, and their work hours.
It also helps in managing the payment and billing process for the contractors.
CWMS can be used in various industries such as construction, manufacturing, and healthcare.
Some ...
Both PF and ESI deductions are currently at 12%.
PF and ESI deductions are mandatory for employees in India.
The current rate for both deductions is 12% of the employee's basic salary.
Employers are also required to contribute an equal amount to these funds.
PF and ESI deductions are aimed at providing social security benefits to employees.
These deductions are calculated on a monthly basis and reflected in the employee's s
I applied via Referral and was interviewed before Nov 2021. There were 3 interview rounds.
The duration of JSW Cement interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 129 interviews
Interview experience
based on 1k reviews
Rating in categories
Assistant Manager
239
salaries
| ₹5.5 L/yr - ₹14.5 L/yr |
Deputy Manager
168
salaries
| ₹7 L/yr - ₹22.6 L/yr |
Sales Officer
161
salaries
| ₹1.9 L/yr - ₹7.7 L/yr |
Senior Officer
109
salaries
| ₹4.2 L/yr - ₹9.8 L/yr |
Senior Sales Officer
103
salaries
| ₹4.8 L/yr - ₹10.2 L/yr |
JK Cement
ACC
Ambuja Cements
Nuvoco Vistas