Filter interviews by
I applied via Referral and was interviewed in Mar 2024. There were 2 interview rounds.
I am a dedicated Sr. Engineer with 8+ years of experience in software development, specializing in backend systems and database management.
8+ years of experience in software development
Specialize in backend systems and database management
Strong problem-solving skills
Proficient in programming languages such as Java, Python, and SQL
Experience working in Agile environments
I am excited about the innovative projects and collaborative team environment at your company.
I am impressed by the company's reputation in the industry.
I am excited about the opportunity to work on cutting-edge technologies.
I believe my skills and experience align well with the company's goals and values.
I am currently earning $90,000 per year.
My current salary is $90,000 per year.
I have been with my current company for 3 years.
I received a 5% raise last year.
I am open to discussing salary expectations for this new role.
My expected salary is based on my experience, skills, and the market rate for Sr. Engineer roles.
Consider my years of experience in the industry
Take into account my specialized skills and certifications
Research the current market rate for Sr. Engineer positions in this location
Factor in the benefits and perks offered by the company
Top trending discussions
posted on 26 Jul 2023
General mcq questions related to work and civil engineering
Curing period of concrete is the duration during which the concrete is kept moist to ensure proper hydration and strength development.
Curing period typically lasts for 7 to 28 days depending on the type of concrete mix and environmental conditions.
Proper curing helps in reducing cracks, increasing durability, and achieving desired strength.
Common curing methods include ponding, wet covering, and using curing compounds.
...
Brick masonry is the process of laying bricks in a specific pattern using mortar to create walls, buildings, or other structures.
Prepare the surface by cleaning and wetting it
Lay a bed of mortar on the surface
Place the bricks in the desired pattern, tapping them into place with a trowel
Use a spirit level to ensure the bricks are level and plumb
Fill the joints between the bricks with mortar and finish them off neatly
RCC structure is a reinforced concrete structure commonly used in construction.
RCC structures consist of concrete reinforced with steel bars for added strength
Common types of RCC structures include beams, columns, slabs, and walls
RCC structures are designed to withstand heavy loads and provide durability
Proper reinforcement detailing is crucial for the structural integrity of RCC structures
MEP drawings are detailed plans that show the mechanical, electrical, and plumbing systems of a building.
MEP drawings include layouts for HVAC systems, electrical wiring, plumbing fixtures, and fire protection systems.
They are essential for coordinating the installation of these systems during construction.
MEP drawings also indicate the location of equipment, materials, and connections needed for the systems to functio...
A section of plumbing typically includes pipes, fittings, and fixtures for water supply and drainage systems.
Include pipes for both water supply and drainage systems
Show fittings such as elbows, tees, and couplings
Include fixtures like sinks, toilets, and showers
posted on 7 Apr 2022
I applied via Naukri.com and was interviewed in Oct 2021. There were 2 interview rounds.
I applied via Referral and was interviewed in Nov 2020. There was 1 interview round.
Tiling work involves preparing the surface, measuring and cutting tiles, applying adhesive, laying tiles, and grouting.
Clean and prepare the surface to be tiled
Measure and cut tiles to fit the area
Apply adhesive to the surface and lay tiles in a pattern
Allow adhesive to dry and then apply grout to fill gaps between tiles
Clean excess grout and allow it to dry completely
Stone work involves the process of cutting, shaping, and placing stones to create structures or decorative features.
Selecting the appropriate type of stone for the project
Cutting and shaping the stones using tools such as chisels and hammers
Laying out the stones in a pattern or design
Applying mortar or other bonding agents to secure the stones in place
Finishing the surface of the stones to achieve the desired texture o
Hook's law states that the force needed to extend or compress a spring is directly proportional to the distance it is stretched or compressed.
Hook's law is a principle in physics that describes the behavior of springs and elastic materials.
It states that the force exerted by a spring is directly proportional to the displacement or change in length of the spring.
The law can be mathematically represented as F = kx, where...
Homeslaw is a law that states that the rate of cooling of an object is proportional to the temperature difference between the object and its surroundings.
Homeslaw is also known as Newton's law of cooling.
It is commonly used in thermodynamics and heat transfer.
The law can be expressed mathematically as dQ/dt = -hA(T - Ts), where dQ/dt is the rate of heat transfer, h is the heat transfer coefficient, A is the surface are...
I applied via Referral and was interviewed in Jan 2021. There were 5 interview rounds.
About construction methods, case study
posted on 7 Aug 2024
I applied via Walk-in and was interviewed before Aug 2023. There was 1 interview round.
I am currently earning $70,000 per year.
My previous salary was $70,000 per year.
I am open to discussing salary expectations for this new role.
I believe my skills and experience warrant a competitive salary.
based on 2 reviews
Rating in categories
Production Engineer
13
salaries
| ₹1.4 L/yr - ₹4.8 L/yr |
Senior Engineer
9
salaries
| ₹3.2 L/yr - ₹7 L/yr |
Assistant Manager
6
salaries
| ₹4.4 L/yr - ₹10 L/yr |
Senior Production Engineer
5
salaries
| ₹2.9 L/yr - ₹4 L/yr |
Assistant Manager - Production
5
salaries
| ₹5 L/yr - ₹5.7 L/yr |
Texmaco Rail and Engineering
Kalindee Rail Nirman (E)
TITAGARH WAGONS
BEML