To cover delay of project, identify the cause, adjust timeline, allocate additional resources, and communicate with stakeholders.
Identify the cause of delay
Adjust timeline and prioritize tasks
Allocate additional resources if necessary
Communicate with stakeholders regularly
Reassess project plan and adjust as needed
Construction work can be managed by planning, organizing, and controlling resources and activities to achieve project goals.
Develop a detailed project plan and schedule
Assign tasks and responsibilities to team members
Monitor progress and adjust plans as necessary
Ensure safety and compliance with regulations
Communicate effectively with stakeholders
Manage budget and resources
Use technology and software to streamline proc
Scope of work can be controlled by defining clear objectives, creating a detailed project plan, and monitoring progress regularly.
Define clear objectives and deliverables
Create a detailed project plan with timelines and milestones
Identify potential risks and develop contingency plans
Regularly monitor progress and adjust the plan as needed
Communicate changes and updates to stakeholders
I applied via Referral and was interviewed before Dec 2020. There were 3 interview rounds.
Answering questions related to safety supervisor role including flora and fauna, TWA and STEL, mock drill responsibility, risk assessment CTRA, and site control and asset protection.
Flora refers to plant life and fauna refers to animal life.
TWA (Time-Weighted Average) is the average exposure to a substance over a specified period of time, while STEL (Short-Term Exposure Limit) is the maximum exposure allowed over a sho...
Top trending discussions
Wellhead platform arrangements and requirements involve the design and layout of structures for drilling and production operations.
Wellhead platforms are structures located above the wellhead to support drilling and production equipment.
Arrangements must consider factors such as well spacing, equipment layout, and safety regulations.
Requirements may include weight capacity, access for maintenance, and environmental con...
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
The duration of JGC Corporation interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 3 interviews
Interview experience
based on 206 reviews
Rating in categories
Piping Engineer
15
salaries
| ₹9 L/yr - ₹28.5 L/yr |
Principal Engineer
14
salaries
| ₹20 L/yr - ₹33.5 L/yr |
Piping Designer
10
salaries
| ₹9.2 L/yr - ₹15.5 L/yr |
Senior Engineer
10
salaries
| ₹19 L/yr - ₹25 L/yr |
Senior Process Engineer
7
salaries
| ₹25 L/yr - ₹52 L/yr |
L&T Construction
Alstom Transportation
Saint-Gobain
AECOM