Filter interviews by
I applied via Naukri.com and was interviewed before Mar 2022. There were 2 interview rounds.
Top trending discussions
PPAP stands for Production Part Approval Process, a standardized process in the automotive industry to ensure suppliers meet quality standards.
PPAP is a set of documents and procedures used to approve parts for production in the automotive industry.
It includes documentation such as design records, engineering change documents, process flow diagrams, control plans, and more.
PPAP is typically required by automotive manuf...
I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 2 interview rounds.
APQP is a structured process for developing new products or processes.
Plan and define the program scope
Design and develop the product or process
Validate the product or process
Launch the product or process
Monitor and improve the product or process
Use tools like FMEA, PPAP, and Control Plans
Collaborate with cross-functional teams
Ensure compliance with industry standards and regulations
posted on 13 Feb 2023
I applied via Naukri.com and was interviewed in Jan 2023. There were 2 interview rounds.
Process flow of a part with its drawing involves defining the steps required to manufacture the part as per the drawing.
Identify the raw materials required for the part
Define the manufacturing processes involved in creating the part
Determine the quality checks required at each step
Ensure compliance with safety and regulatory standards
Document the process flow for future reference
Example: Process flow for manufacturing
A CNC machine with high precision cutting tools.
A CNC machine with high precision cutting tools can achieve a tolerance of 50 microns.
The cutting tools should be regularly maintained and calibrated to ensure accuracy.
The material being cut should also be of high quality and uniform thickness to achieve the desired tolerance.
Other factors such as cutting speed, feed rate, and coolant should also be optimized for the spe
The necessary documents, equipment, and training must be handed over during serial production.
Documentation such as work instructions, quality control plans, and inspection reports
Equipment and tools required for production
Training materials and sessions for operators and maintenance personnel
Product samples for quality control purposes
Any necessary certifications or regulatory approvals
Maintenance and troubleshooting
posted on 6 Jun 2024
Draft angle is the angle of the vertical wall of a mold or part, while shutoff is the point where two mold halves meet to prevent material flow.
Draft angle is necessary for easy ejection of parts from molds.
Shutoff is crucial for preventing material leakage and ensuring part accuracy.
Draft angle is typically around 1-3 degrees, while shutoff is a precise meeting point of mold halves.
Examples: Draft angle - plastic inje
Plastic defects are imperfections in plastic materials that can affect their performance and appearance. Regulations ensure safety and quality standards are met.
Plastic defects can include air bubbles, warping, sink marks, and flow lines
Regulations such as RoHS and REACH restrict the use of certain chemicals in plastics
Defects can be minimized through proper material selection, processing techniques, and quality contro
posted on 6 Apr 2024
I applied via Referral and was interviewed in Mar 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Apr 2023. There were 3 interview rounds.
Cad test on catia software.
Preventing plastic defects involves proper material selection, design optimization, and quality control measures.
Selecting the right type of plastic for the application
Optimizing the design to minimize stress concentrations
Implementing proper molding techniques and parameters
Conducting thorough quality control inspections
Addressing any issues promptly to prevent defects from recurring
Design considerations for plastic components include material selection, manufacturability, functionality, aesthetics, and cost.
Material selection based on properties like strength, flexibility, and chemical resistance
Consideration of manufacturability, such as moldability and ease of assembly
Ensuring functionality requirements are met, such as mechanical strength or thermal resistance
Aesthetics like color, texture, an...
I applied via Company Website and was interviewed before Oct 2022. There were 3 interview rounds.
CAD test in CATIA evaluates candidate's proficiency in using CATIA software for designing engineering projects.
Demonstrate ability to create 3D models using CATIA software
Show proficiency in creating assemblies and performing simulations in CATIA
Explain experience in generating 2D drawings and technical documentation in CATIA
based on 7 reviews
Rating in categories
Senior Executive
895
salaries
| ₹2.7 L/yr - ₹9.5 L/yr |
Executive
867
salaries
| ₹1.8 L/yr - ₹7.6 L/yr |
Assistant Manager
692
salaries
| ₹4 L/yr - ₹14.4 L/yr |
Junior Executive
386
salaries
| ₹1.3 L/yr - ₹4.8 L/yr |
Quality Engineer
371
salaries
| ₹1.2 L/yr - ₹6 L/yr |
Mahindra & Mahindra
Tata Group
Ashok Leyland
Bharat Forge