To improve Performance Ratio, focus on optimizing system efficiency, reducing losses, and maximizing output.
Optimize system design and operation to increase efficiency
Reduce losses through better maintenance and monitoring
Maximize output by utilizing advanced technologies and techniques
Capacity utilization factor is a measure of how much of a system's capacity is being utilized.
Capacity utilization factor is calculated by dividing the actual output by the maximum possible output.
It is often expressed as a percentage.
A high capacity utilization factor indicates efficient use of resources, while a low factor may suggest underutilization or inefficiency.
For example, if a factory has a maximum output of ...
GHI stands for Gross Heating Input, GTI stands for Gross Thermal Efficiency, and GPR stands for Gross Production Rate.
GHI is a measure of the total heat input to a system or appliance.
GTI is a measure of the efficiency of converting input energy into useful output energy.
GPR is a measure of the rate at which a system or appliance produces a certain output.
Improving plant PR involves enhancing communication, community engagement, and sustainability efforts.
Enhance communication with stakeholders through regular updates and transparent information sharing.
Engage with the local community through events, workshops, and outreach programs to build positive relationships.
Implement sustainable practices and showcase environmental initiatives to improve public perception.
Utilize...
posted on 29 Jan 2025
Cable type refers to the construction and materials used in a cable, while current rating indicates the maximum current that can safely flow through the cable.
Cable type can be categorized based on insulation material (e.g. PVC, XLPE), conductor material (e.g. copper, aluminum), and construction (e.g. single-core, multi-core)
Current rating is determined by factors such as conductor size, insulation material, and ambien...
The costs and technical parameters for my last project included client A, scope of work B, and a budget of $100,000.
Client: Company A
Scope of work: Development of new software system
Cost: $100,000
Technical parameters: Integration with existing systems, timeline of 6 months
Substations can be categorized into different types based on their functions and voltage levels. A bay within a substation is a specific area where equipment is located.
Types of substations include distribution substations, transmission substations, and switching substations.
Distribution substations typically step down voltage for local distribution to customers.
Transmission substations step up voltage for long-distanc...
I applied via Company Website and was interviewed in Nov 2024. There were 3 interview rounds.
I am interested to Aptitude test
Jakson Group interview questions for popular designations
It was all about aptitude
One topic was given and total 17 students were there
Get interview-ready with Top Jakson Group Interview Questions
I applied via Referral and was interviewed in Jan 2024. There were 2 interview rounds.
Maintenance planning involves creating a systematic approach to ensure efficient and effective maintenance activities.
Developing a maintenance schedule based on equipment requirements and priorities
Identifying and procuring necessary resources, such as spare parts and tools
Coordinating with other departments to minimize disruptions and downtime
Implementing preventive maintenance strategies to reduce breakdowns
Tracking ...
Addressing employee behavior issues as a Maintenance Manager
Identify the specific behavior that is not good
Have a private conversation with the employee to discuss the issue
Clearly communicate expectations and provide feedback on how the behavior is impacting the team or organization
Offer support and resources to help the employee improve
Implement disciplinary actions if necessary, following company policies and proced...
I have 10 years of experience in electrical project management, including designing and implementing electrical systems for commercial buildings.
Managed a team of engineers and technicians to successfully complete a large-scale electrical project for a shopping mall.
Designed and installed electrical systems for office buildings, ensuring compliance with safety regulations and energy efficiency standards.
Collaborated wi...
The working process of a project involves planning, execution, monitoring, and completion.
Planning phase includes defining project goals, scope, and deliverables.
Execution phase involves assigning tasks, managing resources, and implementing the project plan.
Monitoring phase includes tracking progress, identifying issues, and making necessary adjustments.
Completion phase involves finalizing deliverables, conducting proj
The question is asking about the process from survey execution to billing and closure.
Survey execution involves designing and distributing surveys to collect data.
Data collected from surveys is then analyzed and processed.
Based on the analysis, billing is done for the services provided.
Finally, the project is closed, and any remaining tasks or documentation are completed.
Some of the top questions asked at the Jakson Group interview -
The duration of Jakson Group interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 101 interviews
Interview experience
based on 1k reviews
Rating in categories
Assistant Manager
225
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
138
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
97
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
94
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
84
salaries
| ₹0 L/yr - ₹0 L/yr |
Sterlite Power
Tata Power
Adani Power
BHEL