Upload Button Icon Add office photos

Filter interviews by

Jacobs Engineering Group Manager Materials Interview Questions and Answers

Updated 7 Oct 2023

Jacobs Engineering Group Manager Materials Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via LinkedIn and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

30 mins . Easy. I think anybody can attempt easily

Round 3 - HR 

(1 Question)

  • Q1. Tell me about yourself

Interview Preparation Tips

Interview preparation tips for other job seekers - Can clear easily

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. General questions about cv
Round 2 - Case Study 

Material planing in case of penalties

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
No response

I applied via Walk-in and was interviewed before Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. To the work related questions
  • Q2. Interview to work related questions
  • Q3. Loding & unloding and material shifting
  • Q4. Drawing material list by cheak and coming material satetus and Bailence material statetus information
  • Q5. Tarbine, boiler, condenser and garnetar material knolage
  • Q6. Transportation all type material storeing

I applied via Referral and was interviewed in Sep 2021. There were 3 interview rounds.

Interview Questionnaire 

8 Questions

  • Q1. How did plan controlling project material?
  • Ans. 

    Project material was controlled by creating a detailed plan and monitoring inventory levels.

    • Developed a comprehensive project plan that included material requirements and timelines

    • Monitored inventory levels to ensure materials were ordered and received in a timely manner

    • Collaborated with suppliers to ensure timely delivery of materials

    • Implemented a system to track material usage and waste

    • Regularly reviewed and updated ...

  • Answered by AI
  • Q2. How did store the material and preservation?
  • Ans. 

    Materials are stored according to their specific requirements for preservation.

    • Materials are stored in appropriate containers or packaging to prevent damage or contamination.

    • Temperature and humidity levels are monitored and controlled as necessary.

    • Materials are labeled with information such as date received, expiration date, and storage requirements.

    • Regular inspections and inventory checks are conducted to ensure prope...

  • Answered by AI
  • Q3. As per vendor and Clint requirement material to stored. Every week preservation to be done store material s.
  • Q4. How did store E&I panels?
  • Ans. 

    E&I panels should be stored in a dry and clean area with proper labeling.

    • Store panels in a dry and clean area to prevent damage from moisture and dirt.

    • Label the panels clearly to ensure easy identification and retrieval.

    • Store panels vertically to prevent warping or bending.

    • Use protective covers to prevent scratches or other damage.

    • Regularly inspect the panels for any signs of damage or wear.

    • Follow manufacturer's instru

  • Answered by AI
  • Q5. How did you receit material and documentation?
  • Ans. 

    As a Material Controller, I received material and documentation through various methods.

    • Received material through purchase orders and delivery notes.

    • Received documentation through email, physical copies, or online portals.

    • Verified the accuracy of material and documentation against the purchase order or request.

    • Checked for any damages or discrepancies and reported them to the appropriate department.

    • Maintained a record o...

  • Answered by AI
  • Q6. How do you inspection the materials?
  • Ans. 

    Materials are inspected by following established procedures and using appropriate tools and equipment.

    • Inspect materials upon receipt to ensure they meet specifications

    • Use measuring tools such as calipers and micrometers to check dimensions

    • Perform visual inspections for defects or damage

    • Conduct tests to verify material properties

    • Document inspection results and report any issues to appropriate personnel

  • Answered by AI
  • Q7. What's is your safety plan?
  • Ans. 

    My safety plan includes regular safety audits, employee training, and strict adherence to safety protocols.

    • Regular safety audits to identify potential hazards and address them promptly

    • Employee training on safety procedures and protocols

    • Strict adherence to safety protocols to minimize the risk of accidents

    • Proper use of personal protective equipment (PPE)

    • Emergency response plan in place in case of accidents or incidents

    • C...

  • Answered by AI
  • Q8. What are the type of material your receive in project store.
  • Ans. 1.Piping(pipe,pipe fittings, flange, valves, gasket & Bolts exc.. 2. mechanical ( compressor, vessel, Heat exchange, coloum, pump, boiler, Heater and related accessories. 3. E&I ( cable tray, cable, tray support, transformers, capacitor bank, GIS, Electrical panels, light pole, light fixture, instruments panels, workstation, FA & F&G materials, console, cable gland analyser, transmitter, pressure gauge
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Please appointment matrial technical knowledge personal only in store. He knows about Material store and traceability. If missing the material he is the one reponsible identify the materials time issue material to site.

I applied via Company Website and was interviewed in Nov 2021. There were 4 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. About job description
Round 2 - Technical 

(1 Question)

  • Q1. Detailing of job profile, technicality of the experience, case study
Round 3 - HR 

(1 Question)

  • Q1. Why do u want to join Alstom, Why are you leaving the existing organization?
Round 4 - Technical 

(1 Question)

  • Q1. Technical discussion with Head Supply chain

Interview Preparation Tips

Topics to prepare for Alstom Transportation Material Planner interview:
  • Supply chain, SAP
Interview preparation tips for other job seekers - Be strong in your profile, be assertive.

I applied via Company Website and was interviewed in Sep 2021. There were 5 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Thaís interview was a technical One but was majorly a stress teste. It lasted for about 1 hour 10 minutes. The interview wanted to rest both my knowledge and communication skills. Most of the questions asked to me were related to my B. tech curriculum i.e. computer science related topics. He stressed a lot on the Basic related to my project topic. Luckily I was able to answer most of the questions correctly. I tried to answer each question with example and also used props on the table (like pena,paperweights, pen stands etc). Tô explain my theories. It was my first offcampus interview. And I think I did prety well for a fresher. You need to Stay calm and should apply presence of mind. Please go through the job description thoroughly work by word and recheck your resumee to ensure that you are a best fit for the position

Jacobs Engineering Group Interview FAQs

How many rounds are there in Jacobs Engineering Group Manager Materials interview?
Jacobs Engineering Group interview process usually has 3 rounds. The most common rounds in the Jacobs Engineering Group interview process are Resume Shortlist, Aptitude Test and HR.

Tell us how to improve this page.

Jacobs Engineering Group Manager Materials Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 723 Interviews
TCE Interview Questions
3.8
 • 244 Interviews
Saint-Gobain Interview Questions
4.0
 • 171 Interviews
Dilip Buildcon Interview Questions
4.0
 • 139 Interviews
G R Infraprojects Interview Questions
4.1
 • 130 Interviews
AECOM Interview Questions
4.3
 • 111 Interviews
Worley Interview Questions
4.1
 • 108 Interviews
View all
Design Engineer
222 salaries
unlock blur

₹4.9 L/yr - ₹16.5 L/yr

Senior Design Engineer
147 salaries
unlock blur

₹7.5 L/yr - ₹26 L/yr

Piping Design Engineer
102 salaries
unlock blur

₹4.7 L/yr - ₹15 L/yr

Piping Designer
97 salaries
unlock blur

₹3.7 L/yr - ₹15 L/yr

Senior Engineer
71 salaries
unlock blur

₹9 L/yr - ₹21 L/yr

Explore more salaries
Compare Jacobs Engineering Group with

AECOM

4.3
Compare

Bechtel

4.0
Compare

Fluor Corporation

4.3
Compare

Worley

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview