Filter interviews by
I applied via Naukri.com and was interviewed in Jan 2021. There were 4 interview rounds.
Top trending discussions
I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.
When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.
Contact the supplier to inform them about the shortage and request immediate resolution
Check inventory records and cross-verify with the supplier's delivery documentation
Investigate the cause of the shortage, such as shipping errors or miscommunication
Implement measures to prevent future short...
Yes, corrections can be made in an invoice by following certain steps.
The correction should be made as soon as possible to avoid any confusion.
The original invoice should not be destroyed, but rather marked as 'void' or 'cancelled'.
A new invoice should be created with the correct information and a reference to the original invoice.
The reason for the correction should be clearly stated on the new invoice.
Both the origin...
Various SAP T codes for Issues
MB21 - Create Reservation
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
MB1T - Transfer Posting
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.
I appeared for an interview before May 2020.
To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.
Determine the cost of materials required for 1 cum metre RCC for M10 and M20
Calculate the labor cost involved in the construction process
Consider the cost of equipment required for the construction process
Include overheads like transportation, insurance, and taxes
Compare the ra...
I applied via Approached by Company and was interviewed before Apr 2021. There were 2 interview rounds.
I have 5 years of experience in management roles.
I have worked as a team leader for 2 years.
I have been an assistant manager for 3 years.
During my time as an assistant manager, I was responsible for training new employees and managing schedules.
I have experience in budgeting and financial management.
I have also worked on various projects that involved cross-functional teams.
posted on 24 Mar 2020
I applied via Naukri.com and was interviewed in Feb 2020. There were 3 interview rounds.
I have 5 years of experience in the Oil & Gas sector, specifically in the Operations department.
I have worked in the Operations department of an oil and gas company for 5 years.
During my time in the sector, I have gained extensive knowledge of the operational processes and procedures involved in oil and gas production.
I have successfully managed various projects related to drilling, production optimization, and cost re...
Preparation of RA bill involves gathering all relevant information and creating a detailed invoice for goods or services provided.
Gather all necessary information such as product or service details, quantity, and pricing
Create a detailed invoice with clear descriptions and itemized costs
Include any applicable taxes or discounts
Ensure accuracy and completeness of the bill before submitting to the client
Follow up with th
Group Discussion - Operation & Maintenance
I applied via Approached by Company and was interviewed before Aug 2023. There were 2 interview rounds.
Discussion about my working and experience on site
There were three main structures in my last project: a database structure, a software architecture structure, and a project management structure.
Database structure included tables, relationships, and indexes.
Software architecture structure involved layers, components, and modules.
Project management structure consisted of timelines, tasks, and resources.
There were a total of 10 type foundation castings in my last project.
There were different types of foundation castings used in the project such as pile foundation, strip foundation, and raft foundation.
Each type of foundation casting was used based on the specific requirements of the structure and soil conditions.
The number of each type of foundation casting was determined by the structural design and engineering calcu
posted on 22 Oct 2023
I applied via Approached by Company and was interviewed before Oct 2022. There were 3 interview rounds.
based on 10 reviews
Rating in categories
Junior Engineer
174
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Civil Engineer
168
salaries
| ₹2.2 L/yr - ₹9 L/yr |
Senior Engineer
166
salaries
| ₹4.4 L/yr - ₹11.7 L/yr |
Civil Site Engineer
149
salaries
| ₹2 L/yr - ₹6.4 L/yr |
Engineer
112
salaries
| ₹2.5 L/yr - ₹9 L/yr |
Larsen & Toubro Limited
Tata Projects
L&T Construction
Kalpataru Projects International