Filter interviews by
I applied via Naukri.com and was interviewed in Jan 2021. There were 4 interview rounds.
Top trending discussions
posted on 16 Jun 2022
I applied via Campus Placement and was interviewed before Jun 2021. There was 1 interview round.
I applied via Approached by Company and was interviewed before Apr 2021. There were 2 interview rounds.
I have 5 years of experience in management roles.
I have worked as a team leader for 2 years.
I have been an assistant manager for 3 years.
During my time as an assistant manager, I was responsible for training new employees and managing schedules.
I have experience in budgeting and financial management.
I have also worked on various projects that involved cross-functional teams.
I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.
I appeared for an interview before May 2020.
To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.
Determine the cost of materials required for 1 cum metre RCC for M10 and M20
Calculate the labor cost involved in the construction process
Consider the cost of equipment required for the construction process
Include overheads like transportation, insurance, and taxes
Compare the ra...
posted on 13 Jun 2021
I applied via Referral and was interviewed in Dec 2020. There were 3 interview rounds.
posted on 24 Mar 2020
I applied via Naukri.com and was interviewed in Feb 2020. There were 3 interview rounds.
I have 5 years of experience in the Oil & Gas sector, specifically in the Operations department.
I have worked in the Operations department of an oil and gas company for 5 years.
During my time in the sector, I have gained extensive knowledge of the operational processes and procedures involved in oil and gas production.
I have successfully managed various projects related to drilling, production optimization, and cost re...
Preparation of RA bill involves gathering all relevant information and creating a detailed invoice for goods or services provided.
Gather all necessary information such as product or service details, quantity, and pricing
Create a detailed invoice with clear descriptions and itemized costs
Include any applicable taxes or discounts
Ensure accuracy and completeness of the bill before submitting to the client
Follow up with th
posted on 14 Nov 2021
I applied via Campus Placement and was interviewed in May 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.
When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.
Contact the supplier to inform them about the shortage and request immediate resolution
Check inventory records and cross-verify with the supplier's delivery documentation
Investigate the cause of the shortage, such as shipping errors or miscommunication
Implement measures to prevent future short...
Yes, corrections can be made in an invoice by following certain steps.
The correction should be made as soon as possible to avoid any confusion.
The original invoice should not be destroyed, but rather marked as 'void' or 'cancelled'.
A new invoice should be created with the correct information and a reference to the original invoice.
The reason for the correction should be clearly stated on the new invoice.
Both the origin...
Various SAP T codes for Issues
MB21 - Create Reservation
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
MB1T - Transfer Posting
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
posted on 31 Oct 2022
Price adjustments in construction contracts
Price adjustments are common in construction contracts to account for changes in material costs, labor costs, and other factors
These adjustments can be based on a fixed formula or negotiated between the parties
Price adjustments can also be triggered by unexpected events such as delays or changes in scope
It is important to have clear and detailed provisions in the contract rega
Price variations in construction contracts are common due to changes in scope, materials, and labor costs.
Price variations can occur due to changes in scope of work, such as additional work requested by the client.
Material costs can also fluctuate, causing price variations in the contract.
Labor costs can increase due to unforeseen circumstances, such as weather delays or labor shortages.
Price variations should be clear...
based on 10 reviews
Rating in categories
Junior Engineer
177
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Civil Engineer
168
salaries
| ₹2.2 L/yr - ₹9 L/yr |
Senior Engineer
166
salaries
| ₹4.4 L/yr - ₹11.7 L/yr |
Civil Site Engineer
149
salaries
| ₹2 L/yr - ₹6.4 L/yr |
Engineer
112
salaries
| ₹2.5 L/yr - ₹9 L/yr |
Larsen & Toubro Limited
Tata Projects
L&T Construction
Kalpataru Projects International