I applied via Recruitment Consultant and was interviewed in Dec 2021. There were 7 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About past experience.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared with your experience on what you have done and how you can solve the given problem.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Quantative aptitude /verbal and logical reasoning

Round 3 - Technical 

(3 Questions)

  • Q1. Extempore+technical questions
  • Q2. Questions on power system
  • Q3. Questionson electrical machines

Interview Questionnaire 

1 Question

  • Q1. Related to highway design

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare the IRC codes well.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
More than 8 weeks
Result
-

I applied via Naukri.com

Round 1 - HR 

(1 Question)

  • Q1. Introducing and personality
Round 2 - Group Discussion 

Technical questions about the Revit and MEP

I applied via Naukri.com and was interviewed before Sep 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Gm 

(3 Questions)

  • Q1. What is your last project and its site design
  • Q2. What is the covered area of project
  • Ans. 

    The covered area of the project is approximately 10,000 square feet.

    • The covered area includes the indoor space of the project.

    • It does not include any outdoor space or open areas.

    • The exact covered area may vary depending on the project.

    • In this particular project, the covered area is approximately 10,000 square feet.

  • Answered by AI
  • Q3. What type of building

Interview Preparation Tips

Interview preparation tips for other job seekers - Believe in yourself and done your all duties responsibilities properly and report your senior.

I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. What we do for shortage of material received?
  • Ans. 

    When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.

    • Contact the supplier to inform them about the shortage and request immediate resolution

    • Check inventory records and cross-verify with the supplier's delivery documentation

    • Investigate the cause of the shortage, such as shipping errors or miscommunication

    • Implement measures to prevent future short...

  • Answered by AI
  • Q2. Can we do correction in invoice? if ans is yes then what are the further steps?
  • Ans. 

    Yes, corrections can be made in an invoice by following certain steps.

    • The correction should be made as soon as possible to avoid any confusion.

    • The original invoice should not be destroyed, but rather marked as 'void' or 'cancelled'.

    • A new invoice should be created with the correct information and a reference to the original invoice.

    • The reason for the correction should be clearly stated on the new invoice.

    • Both the origin...

  • Answered by AI
  • Q3. Various SAP T code for Issues
  • Ans. 

    Various SAP T codes for Issues

    • MB21 - Create Reservation

    • MB1A - Goods Withdrawal

    • MB1B - Transfer Posting

    • MB1C - Other Goods Receipts

    • MB1E - Create Stock Transport Order

    • MB1F - Goods Issue

    • MB1H - Maintain Reservation

    • MB1T - Transfer Posting

    • MB1A - Goods Withdrawal

    • MB1B - Transfer Posting

    • MB1C - Other Goods Receipts

    • MB1E - Create Stock Transport Order

    • MB1F - Goods Issue

    • MB1H - Maintain Reservation

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be positive; interviewer may cross checks your confidence through various counter question, but what is right is right it can not be wrong, if interviewer says it wrong then don't go by interviewer words, always stick with your belief and knowledge.

Skills evaluated in this interview

I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Tower cranes erection,batching plant maintenance and electrical safety
  • Q2. Ok normal

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal not tough

I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Power Transmission & distribution

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview for technical purpose.

I applied via Recruitment Consultant and was interviewed in May 2019. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. What are the standards used for plant layout in refineries
  • Ans. 

    Standards for plant layout in refineries ensure safety, efficiency, and compliance with regulations.

    • Plant layout should prioritize safety and minimize the risk of accidents.

    • Efficiency is also important, with consideration given to the flow of materials and equipment.

    • Regulations and industry standards must be followed, such as those set by OSHA and API.

    • Examples of layout considerations include spacing between equipment,...

  • Answered by AI
  • Q2. What is the frequency on visiting Vendor Shops for expediting
  • Ans. 

    The frequency of visiting vendor shops for expediting depends on various factors such as project timelines, vendor reliability, and urgency of the situation.

    • The frequency of visiting vendor shops for expediting can vary from daily visits to weekly or monthly visits.

    • It depends on the project timelines and the urgency of the situation. If a project is running behind schedule, more frequent visits may be required to ensur...

  • Answered by AI
  • Q3. Have You worked in CDU-VDU unit?
  • Q4. What is DCU?
  • Ans. 

    DCU stands for Dublin City University, a university located in Dublin, Ireland.

    • DCU was established in 1980 and has over 17,000 students.

    • It offers a wide range of undergraduate and postgraduate courses in various fields such as business, engineering, science, arts, and humanities.

    • DCU is known for its innovative approach to education and research, and has partnerships with many leading companies and institutions.

    • Some not...

  • Answered by AI
  • Q5. Why it is called delayed?
  • Ans. 

    Delayed is called so because it refers to something that is postponed or occurs after the expected time.

    • The term 'delayed' is used to describe situations where there is a time lag or postponement.

    • It implies that something is not happening immediately or as scheduled.

    • Delays can occur due to various reasons such as technical issues, logistical problems, or unforeseen circumstances.

    • For example, a delayed flight refers to ...

  • Answered by AI
  • Q6. What happens at CDU-VDU?

Interview Preparation Tips

Interview preparation tips for other job seekers - Only one technical interview and final negotiation with HR

Skills evaluated in this interview

I appeared for an interview before May 2020.

Interview Questionnaire 

1 Question

  • Q1. How to fix rate of 1 cum metre rcc for m10 and m20
  • Ans. 

    To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.

    • Determine the cost of materials required for 1 cum metre RCC for M10 and M20

    • Calculate the labor cost involved in the construction process

    • Consider the cost of equipment required for the construction process

    • Include overheads like transportation, insurance, and taxes

    • Compare the ra...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - technicalviru.in

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 746 Interviews
Tata Projects Interview Questions
4.2
 • 437 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
Tractebel Interview Questions
4.1
 • 42 Interviews
View all

Fast track your campus placements

View all

J&F BIM Lead Reviews and Ratings

based on 3 reviews

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 3 Reviews and Ratings
Design Engineer
62 salaries
unlock blur

₹2.2 L/yr - ₹6 L/yr

BIM Modeller
15 salaries
unlock blur

₹2.3 L/yr - ₹6.5 L/yr

Tekla Modeller
11 salaries
unlock blur

₹1 L/yr - ₹6.6 L/yr

Structural Draftsman
7 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Quantity Surveyor
6 salaries
unlock blur

₹3 L/yr - ₹5 L/yr

Explore more salaries
Compare J&F with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview