Total Float is the amount of time a schedule activity can be delayed without delaying the project completion date.
Total Float is calculated by subtracting the Early Start date of an activity from its Late Start date.
It indicates the flexibility in scheduling a particular activity.
Activities with zero Total Float are considered critical path activities.
Total Float helps project managers in managing project schedules eff
Rate analysis of shuttering involves calculating the cost of materials, labor, and equipment for formwork used in construction projects.
Rate analysis of shuttering includes determining the quantity of materials needed for formwork, such as plywood, steel props, and scaffolding.
Labor costs for assembling and dismantling the formwork are also considered in the rate analysis.
Equipment costs, such as rental of concrete mix...
I applied via Job Portal and was interviewed in Jan 2023. There were 3 interview rounds.
Box type waterproofing involves creating a sealed enclosure to prevent water damage.
Start by preparing the surface to be waterproofed
Apply a waterproofing membrane to the surface
Seal all joints and corners to ensure complete waterproofing
Test the waterproofing by filling the box with water and checking for leaks
Asked about the methodology for wp work
Design Manager
35
salaries
| ₹5 L/yr - ₹16.5 L/yr |
Assistant Manager
10
salaries
| ₹5.4 L/yr - ₹10 L/yr |
Executive Accountant
8
salaries
| ₹3 L/yr - ₹4.5 L/yr |
Site Engineer
6
salaries
| ₹4.2 L/yr - ₹6.9 L/yr |
Manager
6
salaries
| ₹7 L/yr - ₹15 L/yr |
Sobha
Prestige Group
Godrej Properties
DLF