Filter interviews by
I applied via Company Website and was interviewed before Oct 2020. There were 3 interview rounds.
Top trending discussions
I applied via Company Website and was interviewed in May 2021. There was 1 interview round.
I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.
I applied via Referral and was interviewed in Aug 2022. There were 3 interview rounds.
Aluminium formwork is a construction technique that uses lightweight aluminium panels to form concrete walls, floors, and columns.
Aluminium formwork is a modern construction technique that is faster and more efficient than traditional formwork methods.
It involves using lightweight aluminium panels that are easy to handle and can be reused multiple times.
The panels are assembled on site to form the desired shape and siz...
Waterproofing procedure involves applying a waterproof barrier to prevent water from penetrating a building structure.
Identify the areas that need waterproofing such as roofs, walls, and foundations.
Choose the appropriate waterproofing material based on the type of structure and the level of water exposure.
Prepare the surface by cleaning and repairing any cracks or damage.
Apply the waterproofing material using the reco...
Steel Fibre Road Concrete is a type of concrete that contains steel fibres to improve its strength and durability.
Steel fibres are added to the concrete mix to enhance its mechanical properties.
The fibres act as reinforcement and help to prevent cracking and improve resistance to wear and tear.
Steel Fibre Road Concrete is commonly used in the construction of roads, bridges, and other infrastructure projects.
It is also ...
I have experience in piling works including design, installation, and testing of piles.
Designed pile foundations for various structures including bridges and buildings
Installed piles using various methods such as driven piles and drilled shafts
Conducted pile load tests to ensure the capacity of the piles
Managed and supervised piling works on construction sites
Ensured compliance with safety regulations and quality stand
Concrete technology is crucial for site activity as it involves the proper mixing, placing, and curing of concrete.
Understanding the properties of concrete and how it reacts to different conditions
Proper mixing of concrete ingredients to achieve the desired strength and consistency
Ensuring proper placement and compaction of concrete to avoid voids and weak spots
Proper curing of concrete to achieve maximum strength and ...
I completed various projects during my Bachelor's degree, including a design project for a new bridge and a research project on renewable energy.
Designed a new bridge using CAD software
Researched and implemented renewable energy sources on campus
Collaborated with classmates on a group project to improve campus sustainability
I completed my 6 months internship at ABC Engineering Firm, where I gained hands-on experience in project management and design.
Internship at ABC Engineering Firm
Focused on project management and design
Hands-on experience gained
I applied via Referral and was interviewed before Feb 2022. There was 1 interview round.
I applied via Company Website and was interviewed in Feb 2023. There were 2 interview rounds.
The coefficient of cement is a measure of its ability to expand or contract due to changes in temperature or moisture.
The coefficient of cement is also known as the coefficient of thermal expansion.
It is an important factor to consider in construction projects to prevent cracking or damage to structures.
The coefficient of cement varies depending on the type and composition of the cement.
For example, Portland cement typ...
Escalation of materials refers to the process of increasing the priority or urgency of obtaining necessary materials for a project.
Escalation may occur when there are delays in the delivery of materials or when the demand for materials exceeds the supply.
Project managers may escalate materials by contacting suppliers to expedite delivery or by seeking alternative sources for the materials.
Escalation can impact project ...
I applied via Company Website and was interviewed before Jan 2023. There was 1 interview round.
Chiller efficiency is a measure of how well a chiller unit is able to cool a space while using the least amount of energy.
Chiller efficiency is typically measured by the Coefficient of Performance (COP), which is the ratio of cooling output to energy input.
Regular maintenance and cleaning of chiller components can improve efficiency.
Upgrading to a more energy-efficient chiller model can also increase efficiency.
Proper ...
Water cooled systems are generally more efficient than air cooled systems due to higher heat transfer capabilities.
Water has higher heat transfer capabilities compared to air
Water cooled systems can maintain more consistent temperatures
Water cooled systems are typically used in high performance applications such as data centers and industrial machinery
Duct velocity can be improved by increasing the fan speed or reducing the duct size.
Increase the fan speed to increase the air velocity in the duct.
Reduce the duct size to increase the air velocity.
Use dampers or adjustable louvers to control and optimize the airflow.
Ensure proper sealing of duct joints to minimize air leakage.
Consider using smooth and straight ducts to reduce friction and improve airflow.
Regularly cle...
The chiller system uses various types of gases for cooling purposes.
Common types of gases used in chiller systems include R-134a, R-410A, and ammonia.
R-134a is a hydrofluorocarbon (HFC) refrigerant commonly used in air conditioning systems.
R-410A is a blend of hydrofluorocarbons used as a replacement for older refrigerants.
Ammonia (NH3) is often used in industrial chiller systems due to its high cooling capacity.
Other ...
The VRF system capacity is determined based on the area's cooling and heating load requirements.
Calculate the total cooling load and heating load for the area
Consider factors such as insulation, windows, occupancy, and equipment
Select VRF system capacity based on the calculated load requirements
Consult with HVAC professionals for accurate sizing
based on 1 review
Rating in categories
Deputy Manager
22
salaries
| ₹6.5 L/yr - ₹11 L/yr |
Assistant Manager
20
salaries
| ₹4.3 L/yr - ₹8 L/yr |
Assistant General Manager
18
salaries
| ₹15 L/yr - ₹24 L/yr |
Senior Manager
9
salaries
| ₹11 L/yr - ₹19 L/yr |
Senior Project Manager
7
salaries
| ₹8.8 L/yr - ₹17 L/yr |
Knight Frank
R.S. Infraprojects
SMEC
BPTP