Upload Button Icon Add office photos

IREO

Compare button icon Compare button icon Compare

Filter interviews by

IREO Manager - Contracts Interview Questions and Answers

Updated 8 Feb 2023

IREO Manager - Contracts Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Besic detail about your self
Round 3 - Technical 

(1 Question)

  • Q1. Rate anlysis, Is codes and other
  • Ans. 

    Rate analysis, IS codes and other are important for effective contract management.

    • Rate analysis involves determining the cost of materials, labor, and equipment required for a project.

    • IS codes are Indian Standards that provide guidelines for quality and safety in construction.

    • Other important factors in contract management include risk assessment, negotiation skills, and legal knowledge.

    • Effective contract management req...

  • Answered by AI
Round 4 - HR 

(1 Question)

  • Q1. About your current and expected CTC

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep cool and confident , well dressed,
Good listener and speak less hard work

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. Aluminium Formwork activity brief description.
  • Ans. 

    Aluminium formwork is a construction technique that uses lightweight aluminium panels to form concrete walls, floors, and columns.

    • Aluminium formwork is a modern construction technique that is faster and more efficient than traditional formwork methods.

    • It involves using lightweight aluminium panels that are easy to handle and can be reused multiple times.

    • The panels are assembled on site to form the desired shape and siz...

  • Answered by AI
  • Q2. Waterproofing Procedure
  • Ans. 

    Waterproofing procedure involves applying a waterproof barrier to prevent water from penetrating a building structure.

    • Identify the areas that need waterproofing such as roofs, walls, and foundations.

    • Choose the appropriate waterproofing material based on the type of structure and the level of water exposure.

    • Prepare the surface by cleaning and repairing any cracks or damage.

    • Apply the waterproofing material using the reco...

  • Answered by AI
  • Q3. External Development area step by step activities
  • Q4. What is Steel Fibre Road Concrete?
  • Ans. 

    Steel Fibre Road Concrete is a type of concrete that contains steel fibres to improve its strength and durability.

    • Steel fibres are added to the concrete mix to enhance its mechanical properties.

    • The fibres act as reinforcement and help to prevent cracking and improve resistance to wear and tear.

    • Steel Fibre Road Concrete is commonly used in the construction of roads, bridges, and other infrastructure projects.

    • It is also ...

  • Answered by AI
  • Q5. Piling works what i had done
  • Ans. 

    I have experience in piling works including design, installation, and testing of piles.

    • Designed pile foundations for various structures including bridges and buildings

    • Installed piles using various methods such as driven piles and drilled shafts

    • Conducted pile load tests to ensure the capacity of the piles

    • Managed and supervised piling works on construction sites

    • Ensured compliance with safety regulations and quality stand

  • Answered by AI
  • Q6. Concrete technology for site activity
  • Ans. 

    Concrete technology is crucial for site activity as it involves the proper mixing, placing, and curing of concrete.

    • Understanding the properties of concrete and how it reacts to different conditions

    • Proper mixing of concrete ingredients to achieve the desired strength and consistency

    • Ensuring proper placement and compaction of concrete to avoid voids and weak spots

    • Proper curing of concrete to achieve maximum strength and ...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why i want to leave the current company
  • Q2. What is my expectation for their organisation

Interview Preparation Tips

Interview preparation tips for other job seekers - Technically u need to have a microlevel knowledge.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Asked about our overall experience
Round 3 - Technical 

(1 Question)

  • Q1. About sequence of work

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepare with technical aspects

I applied via Company Website and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Type of work I am doing in previous company
  • Q2. All construction activities I handeld

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Company & Good Culture
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Oct 2023. There were 3 interview rounds.

Round 1 - Aptitude Test 

About Aptitude, communication, Finace and Excel

Round 2 - Case Study 

It is like a essay writing round

Round 3 - One-on-one 

(1 Question)

  • Q1. About basics of accounting and finance
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I applied via Campus Placement

Round 1 - Coding Test 

Test is for 3 hours including coding, mcq and aptitude.

Round 2 - Technical 

(2 Questions)

  • Q1. OOPS concepts, Projects worked on
  • Q2. Language familiar with, write any coding question and explain it
Round 3 - HR 

(1 Question)

  • Q1. Introduction, About company
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. What is the difference between Residential Property and Commercial Property?
  • Ans. 

    Residential Property is used for living purposes while Commercial Property is used for business purposes.

    • Residential Property includes houses, apartments, and condominiums where people live.

    • Commercial Property includes office buildings, retail stores, and warehouses where businesses operate.

    • Residential Property is typically zoned for single-family or multi-family dwellings, while Commercial Property is zoned for commer...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. About your self
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
More than 8 weeks
Result
No response

I applied via Campus Placement and was interviewed before Nov 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Self intro , sales and marketing,situation baes ed question
Round 3 - One-on-one 

(1 Question)

  • Q1. Internship, marketing questions
Round 4 - Case Study 

Excel sheet filling round

I applied via Campus Placement

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

They will conduct English talent test

Interview Preparation Tips

Interview preparation tips for other job seekers - Better to work as a fresher to grow the communication skills

IREO Interview FAQs

How many rounds are there in IREO Manager - Contracts interview?
IREO interview process usually has 4 rounds. The most common rounds in the IREO interview process are HR, Resume Shortlist and Technical.

Tell us how to improve this page.

IREO Manager - Contracts Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

InvestoXpert Interview Questions
4.2
 • 63 Interviews
Knight Frank Interview Questions
4.1
 • 44 Interviews
Smartworks Interview Questions
3.5
 • 32 Interviews
Aliens Group Interview Questions
3.2
 • 30 Interviews
Nyati Group Interview Questions
4.2
 • 29 Interviews
Berkadia Interview Questions
3.9
 • 28 Interviews
Xanadu Interview Questions
3.5
 • 26 Interviews
SMEC Interview Questions
3.7
 • 26 Interviews
View all
Deputy Manager
22 salaries
unlock blur

₹6.5 L/yr - ₹11 L/yr

Assistant Manager
20 salaries
unlock blur

₹4.3 L/yr - ₹8 L/yr

Assistant General Manager
18 salaries
unlock blur

₹15 L/yr - ₹24 L/yr

Senior Manager
9 salaries
unlock blur

₹11 L/yr - ₹19 L/yr

Senior Project Manager
7 salaries
unlock blur

₹8.8 L/yr - ₹17 L/yr

Explore more salaries
Compare IREO with

Knight Frank

4.0
Compare

R.S. Infraprojects

3.9
Compare

SMEC

3.7
Compare

BPTP

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview