Filter interviews by
Assessing challenges and improving existing security systems is crucial for DGM Security's success.
Identify current weaknesses in the security system
Conduct risk assessments to determine potential threats
Implement new technologies or protocols to address vulnerabilities
Regularly review and update security measures
Provide ongoing training for security personnel
Implementing regular training sessions, updating security protocols, investing in new technology.
Regular training sessions for security staff to keep them updated on latest security threats and protocols.
Updating security protocols to adapt to changing threats and vulnerabilities.
Investing in new technology such as surveillance cameras, access control systems, and biometric scanners.
Conducting regular security audits t
I applied via Approached by Company and was interviewed before Feb 2022. There were 4 interview rounds.
Rate analysis, IS codes and other are important for effective contract management.
Rate analysis involves determining the cost of materials, labor, and equipment required for a project.
IS codes are Indian Standards that provide guidelines for quality and safety in construction.
Other important factors in contract management include risk assessment, negotiation skills, and legal knowledge.
Effective contract management req...
I applied via Referral and was interviewed before Aug 2021. There were 2 interview rounds.
I applied via Company Website and was interviewed before Oct 2020. There were 3 interview rounds.
IREO interview questions for popular designations
I applied via Naukri.com and was interviewed in Jun 2019. There were 3 interview rounds.
I applied via Campus Placement
They will conduct English talent test
I applied via Naukri.com and was interviewed before Aug 2022. There were 4 interview rounds.
I applied via Referral and was interviewed in Aug 2022. There were 3 interview rounds.
Aluminium formwork is a construction technique that uses lightweight aluminium panels to form concrete walls, floors, and columns.
Aluminium formwork is a modern construction technique that is faster and more efficient than traditional formwork methods.
It involves using lightweight aluminium panels that are easy to handle and can be reused multiple times.
The panels are assembled on site to form the desired shape and siz...
Waterproofing procedure involves applying a waterproof barrier to prevent water from penetrating a building structure.
Identify the areas that need waterproofing such as roofs, walls, and foundations.
Choose the appropriate waterproofing material based on the type of structure and the level of water exposure.
Prepare the surface by cleaning and repairing any cracks or damage.
Apply the waterproofing material using the reco...
Steel Fibre Road Concrete is a type of concrete that contains steel fibres to improve its strength and durability.
Steel fibres are added to the concrete mix to enhance its mechanical properties.
The fibres act as reinforcement and help to prevent cracking and improve resistance to wear and tear.
Steel Fibre Road Concrete is commonly used in the construction of roads, bridges, and other infrastructure projects.
It is also ...
I have experience in piling works including design, installation, and testing of piles.
Designed pile foundations for various structures including bridges and buildings
Installed piles using various methods such as driven piles and drilled shafts
Conducted pile load tests to ensure the capacity of the piles
Managed and supervised piling works on construction sites
Ensured compliance with safety regulations and quality stand
Concrete technology is crucial for site activity as it involves the proper mixing, placing, and curing of concrete.
Understanding the properties of concrete and how it reacts to different conditions
Proper mixing of concrete ingredients to achieve the desired strength and consistency
Ensuring proper placement and compaction of concrete to avoid voids and weak spots
Proper curing of concrete to achieve maximum strength and ...
I applied via Approached by Company and was interviewed in Nov 2022. There were 3 interview rounds.
based on 4 interviews
Interview experience
Deputy Manager
22
salaries
| ₹6.5 L/yr - ₹11 L/yr |
Assistant Manager
20
salaries
| ₹4.3 L/yr - ₹8 L/yr |
Assistant General Manager
18
salaries
| ₹15 L/yr - ₹24 L/yr |
Senior Manager
9
salaries
| ₹11 L/yr - ₹19 L/yr |
Senior Project Manager
7
salaries
| ₹8.8 L/yr - ₹17 L/yr |
Knight Frank
R.S. Infraprojects
SMEC
BPTP