Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Nov 2023. There were 4 interview rounds.
Give the task to me prepare a BOQ of a project Field related
Top trending discussions
I applied via campus placement at National Institute of Technology (NIT), Tiruchirappalli and was interviewed in Nov 2024. There was 1 interview round.
I applied via Approached by Company and was interviewed in Feb 2023. There were 2 interview rounds.
Building construction involves planning, designing, and executing the construction of a building.
It starts with site selection and surveying
Designing the building and obtaining necessary permits
Excavation and foundation work
Framing and structural work
Installation of utilities and systems
Finishing work such as painting and flooring
Inspection and final approval
Examples include residential homes, commercial buildings, and
I applied via Company Website and was interviewed in Sep 2023. There were 3 interview rounds.
Ask me any subject of technical subject
I applied via Campus Placement and was interviewed in Jun 2023. There were 4 interview rounds.
ANALYSIS OF SIGNATURE BRIDGE IN DELHI
I am seeking an opportunity in a company where. I
can use my experience and education to help the
company meet and surpassed its goals
Cement reinforcement concrete is a type of concrete that includes steel bars, mesh, or fibers to increase its strength and durability.
Cement reinforcement concrete is commonly used in construction to provide additional strength and support to structures.
The reinforcement materials, such as steel bars or mesh, are embedded within the concrete to help resist tension forces.
Fibers, such as glass or synthetic fibers, can a...
Nominal concrete proportions vary for different grades, typically ranging from 1:1.5:3 for M5 grade to 1:0.5:1 for M100 grade.
M5 grade concrete typically has a proportion of 1:1.5:3 (cement:sand:aggregate)
M20 grade concrete typically has a proportion of 1:1.5:3.5
M40 grade concrete typically has a proportion of 1:0.75:1.5
M100 grade concrete typically has a proportion of 1:0.5:1
Concrete test is a procedure to determine the quality and strength of concrete used in construction projects.
Concrete test involves various methods such as compressive strength test, slump test, and concrete mix design.
Compressive strength test measures the ability of concrete to withstand loads before failure.
Slump test measures the consistency and workability of concrete.
Concrete mix design involves determining the p...
What are the ethics of civil engineering, according to you
I applied via Walk-in and was interviewed in Feb 2024. There were 3 interview rounds.
Like civil engineer and site related
I applied via Company Website and was interviewed in Oct 2023. There were 2 interview rounds.
Basic apti test was conducted. Midium level difficulty
I applied via Campus Placement and was interviewed in Dec 2023. There were 2 interview rounds.
It was moderate and common aptitude test that will be given for other branches as well
The 4th dimension of BIM refers to the element of time, allowing for the visualization and management of construction schedules.
4D BIM integrates scheduling information with 3D models to create a visual representation of the construction timeline.
It helps in identifying potential clashes and delays in the project schedule.
By simulating the construction process, stakeholders can better understand the sequence of activit...
The 7th dimension of BIM refers to the integration of facilities management data into the BIM model.
Facilities management data includes information about maintenance schedules, equipment specifications, and energy usage.
This dimension allows for the seamless transition of data from the construction phase to the operational phase of a building.
By incorporating facilities management data, BIM can help optimize building p...
based on 1 review
Rating in categories
Facility Engineer
5
salaries
| ₹10 L/yr - ₹12 L/yr |
IT Support Analyst
4
salaries
| ₹7.6 L/yr - ₹12 L/yr |
Project Manager
3
salaries
| ₹7.2 L/yr - ₹18 L/yr |
Planner and Estimator
3
salaries
| ₹12.5 L/yr - ₹15 L/yr |
Reliance Industries
Tata Group
Adani Group
Mahindra & Mahindra