Filter interviews by
Clear (1)
I applied via Company Website and was interviewed in Jan 2023. There were 3 interview rounds.
About planning who to make planning
I chose this job because of my passion for planning and organizing projects.
I have always been fascinated by the process of planning and organizing projects.
I enjoy the challenge of creating schedules and ensuring that projects are completed on time.
I have a strong attention to detail and enjoy working with data and numbers.
I believe that effective planning is crucial for the success of any project.
I have previous expe...
My experience in planning engineering includes project scheduling, resource allocation, and progress monitoring.
Developed and maintained project schedules using software like Primavera P6
Allocated resources effectively to ensure timely completion of projects
Monitored project progress and identified potential delays or issues
Collaborated with cross-functional teams to coordinate activities and resolve conflicts
Implement...
I am a highly organized and detail-oriented planning engineer with a strong background in project management.
I have a Bachelor's degree in Civil Engineering and a Master's degree in Project Management.
I have successfully managed multiple construction projects, ensuring they are completed on time and within budget.
I am proficient in using project management software such as Primavera P6 and Microsoft Project.
I have exce...
Seeking new opportunities for professional growth and career advancement.
Desire for new challenges and learning opportunities
Limited growth potential in previous role
Seeking a more supportive and collaborative work environment
Relocation or commute concerns
Company downsizing or restructuring
Top trending discussions
posted on 1 Jun 2020
I applied via Naukri.com and was interviewed in May 2020. There were 4 interview rounds.
Die casting and machining defects are common in manufacturing processes.
Die casting defects include porosity, shrinkage, cold shuts, and flash.
Machining defects include burrs, chatter marks, and tool marks.
Die casting defects can be caused by improper temperature, pressure, or metal flow.
Machining defects can be caused by dull tools, improper speeds and feeds, or poor fixturing.
Defects can lead to part failure, reduced
Filling and high speed ratio formula is used to calculate the filling time of a container with a specific volume of liquid at a given flow rate.
Filling and high speed ratio formula is V/Q
V is the volume of the container and Q is the flow rate of the liquid
The formula is used to determine the time it takes to fill a container with a specific volume of liquid at a given flow rate
The higher the flow rate, the faster the c
posted on 19 Jan 2021
I was interviewed in Jul 2020.
I have achieved several milestones throughout my career as a Senior Engineer.
Successfully led a team of engineers to develop and implement a new software system, resulting in a 20% increase in efficiency.
Received recognition for designing and implementing a cost-effective solution that reduced production downtime by 30%.
Contributed to the development of a groundbreaking technology that revolutionized the industry, lead...
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Referral and was interviewed before Sep 2020. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Dec 2021. There were 3 interview rounds.
GD&T symbols are used to specify the geometric requirements of a part or assembly.
GD&T stands for Geometric Dimensioning and Tolerancing
Symbols include: flatness, circularity, perpendicularity, concentricity, position, and more
Each symbol has a specific meaning and is used to communicate precise engineering requirements
GD&T is used in industries such as aerospace, automotive, and manufacturing
Example: A position symbol...
Cp, Cpk, Pp, and Ppk are statistical process control indices used to measure process capability and performance.
Cp and Cpk measure how well a process meets its specifications, with Cpk being more accurate for non-centered processes.
Pp and Ppk measure how well a process performs relative to its natural variation, with Ppk being more accurate for non-centered processes.
All four indices are calculated using the process me...
Casting should be thorough
Aluminium die Casting
based on 1 interview
Interview experience
Assistant Manager
39
salaries
| ₹0 L/yr - ₹0 L/yr |
Research Engineer
36
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Line Leader
26
salaries
| ₹0 L/yr - ₹0 L/yr |
Core Engineering
23
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
23
salaries
| ₹0 L/yr - ₹0 L/yr |
Bosch
Samvardhana Motherson Group
Continental
ZF Steering Gear