I applied via Walk-in and was interviewed in Jul 2021. There was 1 interview round.
Technical knowledge sharing can be achieved through various means and can lead to improved efficiency and innovation.
Establishing a knowledge sharing culture within the organization
Encouraging cross-functional collaboration and communication
Providing training and development opportunities
Creating a centralized knowledge management system
Participating in industry events and conferences
Sharing best practices and lessons ...
The simple way to time-saving troubleshooting is to follow a systematic approach and use available resources.
Identify the problem and gather information
Use available resources such as manuals, diagrams, and online resources
Follow a systematic approach to eliminate possible causes
Test and verify the solution before implementing it
Advantages include faster resolution, reduced downtime, and improved efficiency
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Referral and was interviewed before Sep 2020. There were 3 interview rounds.
posted on 19 Jan 2021
I was interviewed in Jul 2020.
I have achieved several milestones throughout my career as a Senior Engineer.
Successfully led a team of engineers to develop and implement a new software system, resulting in a 20% increase in efficiency.
Received recognition for designing and implementing a cost-effective solution that reduced production downtime by 30%.
Contributed to the development of a groundbreaking technology that revolutionized the industry, lead...
posted on 1 Jun 2020
I applied via Naukri.com and was interviewed in May 2020. There were 4 interview rounds.
Die casting and machining defects are common in manufacturing processes.
Die casting defects include porosity, shrinkage, cold shuts, and flash.
Machining defects include burrs, chatter marks, and tool marks.
Die casting defects can be caused by improper temperature, pressure, or metal flow.
Machining defects can be caused by dull tools, improper speeds and feeds, or poor fixturing.
Defects can lead to part failure, reduced
Filling and high speed ratio formula is used to calculate the filling time of a container with a specific volume of liquid at a given flow rate.
Filling and high speed ratio formula is V/Q
V is the volume of the container and Q is the flow rate of the liquid
The formula is used to determine the time it takes to fill a container with a specific volume of liquid at a given flow rate
The higher the flow rate, the faster the c
I applied via Recruitment Consulltant and was interviewed in Jun 2022. There were 4 interview rounds.
Question abou TPM, OEE, six Sigma, lean manufacturing,kaizen,poka yoke etc
posted on 17 Jun 2024
based on 1 review
Rating in categories
Assistant Manager
39
salaries
| ₹0 L/yr - ₹0 L/yr |
Research Engineer
36
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Line Leader
26
salaries
| ₹0 L/yr - ₹0 L/yr |
Core Engineering
23
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
23
salaries
| ₹0 L/yr - ₹0 L/yr |
Bosch
Samvardhana Motherson Group
Continental
ZF Steering Gear