I applied via Recruitment Consulltant and was interviewed in Feb 2024. There were 3 interview rounds.
I applied via Campus Placement and was interviewed in Aug 2024. There were 2 interview rounds.
Aptitde, lgical rsoning, english
Renewable energy topic
I applied via Approached by Company and was interviewed in Sep 2023. There were 3 interview rounds.
I applied via Approached by Company
Technicals & project responsibilities
Hinduja Renewables interview questions for popular designations
I applied via Job Portal and was interviewed in Feb 2024. There was 1 interview round.
Effective work processes and vendor management are crucial for successful store operations.
Establish clear communication channels with vendors to ensure timely deliveries and resolve any issues promptly.
Implement inventory management systems to track stock levels and reorder products as needed.
Regularly evaluate vendor performance to ensure quality and cost-effectiveness.
Negotiate contracts and terms with vendors to se...
Top trending discussions
I appeared for an interview before Mar 2024, where I was asked the following questions.
A working drum elements system is a mechanism that allows for the efficient and effective movement of drums.
The system should be designed to handle drums of various sizes and weights
It should include components such as rollers, conveyors, and lifters
The system should be automated to reduce manual labor and increase productivity
Regular maintenance and inspections are necessary to ensure the system is functioning properl
posted on 5 Dec 2024
What is more important product quality and marketing
I applied via Company Website and was interviewed in Feb 2022. There were 4 interview rounds.
I applied via LinkedIn and was interviewed before Jun 2023. There were 2 interview rounds.
The critical path is the longest sequence of tasks in a project that must be completed on time in order for the project to finish on schedule.
Identifying the critical path helps in determining the minimum time needed to complete a project.
It consists of tasks that have zero slack or float, meaning any delay in these tasks will delay the entire project.
Activities on the critical path are often marked with a double line ...
I will plan a 50 Mwp project by conducting feasibility studies, creating a detailed project timeline, securing necessary permits, sourcing materials and contractors, and implementing a quality control plan.
Conduct feasibility studies to assess site suitability and potential challenges
Create a detailed project timeline outlining key milestones and deadlines
Secure necessary permits and approvals from local authorities
Sou...
MSP (Microsoft Project) is a project management software developed by Microsoft, while Primavera is a project management software developed by Oracle.
MSP is developed by Microsoft, while Primavera is developed by Oracle.
MSP is more commonly used for smaller projects, while Primavera is preferred for larger and more complex projects.
MSP is known for its user-friendly interface and ease of use, while Primavera is known f...
based on 14 interviews
Interview experience
based on 28 reviews
Rating in categories
Assistant Manager
9
salaries
| ₹9.5 L/yr - ₹18 L/yr |
Finance Manager
7
salaries
| ₹13.5 L/yr - ₹26.3 L/yr |
Electrical Engineer
7
salaries
| ₹4.6 L/yr - ₹7.8 L/yr |
Site Engineer
6
salaries
| ₹4.5 L/yr - ₹6 L/yr |
Senior Engineer
6
salaries
| ₹4.6 L/yr - ₹9.5 L/yr |
Dhoot Transmission
R.K.M Powergen
SHV Energy
New Allenberry Works